Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,187Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | NOVEL CONSTRUCTIONS L1 | JITHIN GOPINATH K L2 |
|---|---|---|---|---|---|
| 1.00Leach Pit | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.7 | cum | 3,372 ₹5,732.4 Lowest | 3,777.42 ₹6,421.61 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 15 | cum | 236 ₹3,540 Lowest | 265.03 ₹3,975.45 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 10 | hour | 317 ₹3,170 Lowest | 355.47 ₹3,554.7 |
| 1.00 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 4 | cum | 6,951 ₹27,804 Lowest | 7,786.14 ₹31,144.56 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.6 | cum | 9,634 ₹5,780.4 Lowest | 10,790.23 ₹6,474.14 |
| 1.01 | 5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars | 50 | kg | 102 ₹5,100 Lowest | 114.76 ₹5,738 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 4 | sqm | 700 ₹2,800 Lowest | 784.81 ₹3,139.24 |
| 1.01 | 23.5:Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer -in- charges | 4 | cum | 1,500 ₹6,000 Lowest | 1,680.04 ₹6,720.16 |
| 1.01 | 50.18.9.6.2:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 50 mm dia 6 Kgf/cm2 | 15 | metre | 263 ₹3,945 Lowest | 295.11 ₹4,426.65 |
Tender Value
₹96,252
EMD Value
₹2,406
Closing Date
8 Oct 2025, 6:00 pmClosed
Asst.Executive Engineer
Office of the Asst. Executive Engineer Harbour Engineering Investigation Subdivision Vellayil
NABARD-RIDF-XXVII-AdditionalInfrastructutre Facilities at Vellayil FishingToilet block Construction of Leach Pit General Civil Works
2025_HED_796573_1
HED/CEHED/TR/683/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
60 days
Vellayil
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹2,406
Yes
Asst.Executive Engineer
20 Nov 2025
12 Sept 2025
10 Oct 2025
12 Sept 2025
8 Oct 2025
12 Sept 2025
12 Sept 2025 - 16 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1318474.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .