Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹22.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹25.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹25.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹30.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹30.7 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹33.0 LAdmitted-Fee/PreQual/Technical/Finance 04042156 VALSALAKUMARI N 0404 SUB TREASURY PUNALUR | KOLLAM | KERALA | 689694 | ₹33.0 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹34.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹34.1 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | NOUSHAD.S L4 | P M SIVADAS L2 | Ajish Bhanu L5 | Lenin L3 | MD SHAVEZ L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Painting work | ||||||||
| 1.00 | 13.111.2:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). | 25,625 | sqm | 88.4 ₹22,65,250 | 67.5 ₹17,29,687.5 | 89.99 ₹23,05,993.75 | 80.49 ₹20,62,556.25 | 60 ₹15,37,500 Lowest |
| 1.00 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 8,248 | sqm | 100.5 ₹8,28,924 | 80 ₹6,59,840 | 108.55 ₹8,95,320.4 | 93.22 ₹7,68,878.56 | 65 ₹5,36,120 Lowest |
| 1.00 | 13.102.1:Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :One or more coats on old work | 550 | sqm | 93.5 ₹51,425 | 80 ₹44,000 Lowest | 96.59 ₹53,124.5 | 128.82 ₹70,851 | 100 ₹55,000 |
| 1.00 | OD97916/2026-2027:Painting with acrylic paint of required shade : Old work (One or more coat applied at @ .90 ltr/10 sqm) - copper colour (MRF made or equivalent ) | 450 | sqm | 128.5 ₹57,825 | 235 ₹1,05,750 | 149.99 ₹67,495.5 | 170.9 ₹76,905 | 70 ₹31,500 Lowest |
| 1.00 | OD97920/2026-2027:Painting with synthetic enamel paint of different colours to the idols in marakkottam under pass (Ayyappa,Ganapathy,Murugan) of size 60x60 cm | 3 | each | 1,815 ₹5,445 | 108.55 ₹325.65 Lowest | 164.6 ₹493.8 | 1,288.2 ₹3,864.6 | 5,000 ₹15,000 |
| 1.01 | OD97921/2026-2027:Painting the gable portion of Balikkalppura and Valiyambalam with synthetic enamel paint of approved quality and shade, using different colours: two coats | 8 | sqm | 151 ₹1,208 | 108.55 ₹868.4 Lowest | 306.58 ₹2,452.64 | 514.42 ₹4,115.36 | 200 ₹1,600 |
| 1.01 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 60 | sqm | 390 ₹23,400 | 100 ₹6,000 | 400.47 ₹24,028.2 | 429.4 ₹25,764 | 50 ₹3,000 Lowest |
| 1.01 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 200 | sqm | 350 ₹70,000 | 225 ₹45,000 | 299 ₹59,800 | 306.92 ₹61,384 | 200 ₹40,000 Lowest |
Tender Value
₹35.2 L
EMD Value
₹50,000
Closing Date
10 Aug 2026, 11:00 amClosed
Executive Engineer, Sabarimala Development Project
office of the Executive Engineer, SDP, Pathanamthitta
SDP-Sabarimala-M and M 1202 ME- Painting to the temple structure and Valiya Nadapandal at Sabarimala
2026_TDB_863467_1
SDP/02/ET-012/26-27
Open Tender
Civil Works - Buildings
Item Rate
60 days
Sabarimala
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,950
₹50,000
13 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Painting work | |||||
| 1.001 | 13.111.2:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). | - | sqm | - | - |
| 1.002 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | - | sqm | - | - |
| 1.003 | 13.102.1:Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade :One or more coats on old work | - | sqm | - | - |
| 1.004 | OD97916/2026-2027:Painting with acrylic paint of required shade : Old work (One or more coat applied at @ .90 ltr/10 sqm) - copper colour (MRF made or equivalent ) | - | sqm | - | - |
| 1.005 | OD97920/2026-2027:Painting with synthetic enamel paint of different colours to the idols in marakkottam under pass (Ayyappa,Ganapathy,Murugan) of size 60x60 cm | - | each | - | - |
| 1.006 | OD97921/2026-2027:Painting the gable portion of Balikkalppura and Valiyambalam with synthetic enamel paint of approved quality and shade, using different colours: two coats | - | sqm | - | - |
| 1.007 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | - | sqm | - | - |
| 1.008 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | - | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Affidavit.pdf
Tender Documents • 0.19 MB
PRELIMINARYAGREEMENT.pdf
Tender Documents • 0.19 MB
FORMOFTENDER.pdf
Tender Documents • 0.19 MB
INTEGRITYPACT.pdf
Tender Documents • 0.16 MB
Requisitionforepayment.pdf
Tender Documents • 0.17 MB
SBD012.pdf
Tender Documents • 1.65 MB
BOQ_1460602.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].