Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.9 L+₹12,162.57 (0.68%)Rejected-Finance TENDER DOCUMENTS DO NOT CONTAIN THE FULL ADDRESS FOR THIS PRIVATE COMPANY | L2 | Rejected-Finance L2 | |
| 3 | L3₹19.6 L+₹1.8 L (9.87%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹19.8 L+₹2.0 L (11.1%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹21.7 L+₹3.9 L (21.8%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹32.0 L
EMD Value
₹50,000
Closing Date
14 Oct 2024, 5:00 pmClosed
Divisional Forest Officer ,Kottayam
O/o The Divisional Forest Office , Kottayam
Elephant Proof Trench
2024_FD_694017_1
A2-3514/2024
Open Tender
Agricultural or Forestry
Percentage
30 days
Erumely
Please refer Tender documents.
5 documents required · 5 mandatory
₹7,557
Yes
₹50,000
Yes
28 Oct 2024
3 Oct 2024
17 Oct 2024
3 Oct 2024
14 Oct 2024
3 Oct 2024
Amount
1 Elephant Proof Trench -1.60km
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.9.1 Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
2.9.2 Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Hard rock (requiring blasting)
2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
2.26.2 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
M M SULAIMAN
kottackal timbers
Nizar
SHAJI FRANCIS
O P ENTERPRISES
SHEJEEB TM
WILLINGDON SAMUEL
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .