| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.3 LAccepted-AOC 0701 DISTRICT TREASURY CHENGANNUR | ALAPPUZHA | KERALA | 686534 | 1 | Accepted-AOC Single bid received after retender. Hence contract awarded. |
Tender Value
₹17.8 L
EMD Value
₹44,440
Closing Date
26 Nov 2024, 5:00 pmClosed
Executive Engineer
O/o Executive Engineer, Irrigation Division Kottayam
GENERAL Improvement to AC canal in ward no 1 of Paippadu Panchayath in Changanacherry thaluk Side protection and Culvert Construction General Civil Work
2024_Irrig_703712_2
IRR/IA/TR/481/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
240 days
Paippadu Grama Panchayath
please refer tender document
7 documents required · 7 mandatory
₹2,760
Yes
₹44,440
Yes
23 Jan 2025
18 Nov 2024
28 Nov 2024
18 Nov 2024
26 Nov 2024
18 Nov 2024
18 Nov 2024 - 26 Nov 2024
Amount
Construction of motor thara culvert & protection works for side bund
OD11233/2024-2025:Putting up ring bund of top width 1.50m, bottom width 2.75m.and average height of 2.50mwith 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of weiling pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Seperation memebrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and weiling pieces using reeper and nails in full height including tying properly using iron wire and coir altogether and supply andfilling inside with hard clay/cut earth up to 2.50m, levell and conveyed with all leads and lifts including consolidating properly and maintaing the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
OD11197/2024-2025:Driving down coconut pile to lines and levels through various strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end where no accesibility to hydraulic excavator through land and water bodies having minimum width greater than 10 Metre
2.27:Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.64.2:Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
OD22335/2024-2025:Coconut Pile- Driving down half split coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end where no accesibility to hydraulic excavator through land and water bodies having minimum width greater than 10 Metre for Kuttanad area
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
OD22331/2024-2025:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5
Bidder Name
DINU CHACKO
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1106590.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .