| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAccepted-AOC | ₹6.7 Cr Quoted ₹7.2 Cr | L1 | Accepted-AOC AOC |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹7.2 Cr
EMD Value
₹14.3 L
Closing Date
22 Aug 2019, 3:00 pmClosed
General Manager
Office of General Manager Construction Circle Ganga UKPJN Jagjeetpur Haridwar
POLLUTION ABATEMENT OF RIVER ALAKNANDA AT SRIKOT GANGNALI INTERCEPTION AND DIVERSION WITH STP
2019_MDPEY_17885_2
Letter No. 1497/Lekha-6/15 dt 27.05.2019
Open Tender
Composite Works
Item Rate
365 days
SRIKOT GANGNALI
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Project Manager C and M Unit Ganga UKPJN Srinagar
₹14.3 L
Haridwar
28 Jan 2020
22 Jul 2019
22 Aug 2019
22 Jul 2019
22 Aug 2019
9 Aug 2019
31 Jul 2019
Amount
STP#1 for Tauliya nalla - 0.05 MLD Design, Construction, Supply, Erection, Installation & commissioning of Sewage Treatment Plant with PLC & SCADA System including interception and Diversion work, site development, finishing work, boundary wall, fencing work and approach road etc. complete in all respect as per scope of work.
Supply and Installation of Online Monitoring System for 0.050MLD STP including Testing and Commissioning etc complete in all respect as per scope of work
STP#2 for Junior High School Nalla- 0.075 MLD Design, Construction, Supply, Erection, Installation & commissioning of Sewage Treatment Plant with PLC & SCADA System including interception and Diversion work, site development, finishing work, boundary wall, fencing work and approach road etc. complete in all respect as per scope of work.
Supply and Installation of Online Monitoring System for 0.075MLD STP including Testing and Commissioning etc complete in all respect as per scope of work.
OPERATION & MAINTENANCE OF STP#1 for Tauliya Nalla (0.050MLD)
Annual O & M Prices of STP with I&D works except Electricity and Fuel (HSD+Lubricants) charges (The cost included herein are the yearly cost for plant Operation & maintenance including fixed cost (Cost of Manpower to be deployed, General Maintenance of Civil Structures, preventive and Breakdown Maintenance of Mechanical equipment, Online Monitoring System, Electrical items, Field & Laboratory Instruments, Supply of Laboratory Chemicals / Glassware / Consumable / Spares etc.) and Variable Cost (Including cost of Chemicals & Disposal of Plant Residuals viz. Screenings, Grits, Dewatered Sludge, etc)
For 1st year (Please Note - This item not to be quoted less then 4% of the TOTAL of 1.0 and 1.01 above : Design Build etc. Work for STP)
For 2nd year - 105% on previous year
For 3rd year - 105% on previous year
For 4th year - 106% on previous year
For 5th year - 106% on previous year
For 6th year - 106% on previous year
For 7th year - 107% on previous year
For 8th year - 107% on previous year
For 9th year - 107% on previous year
For 10th year - 108% on previous year
For 11th year - 108% on previous year
For 12th year - 108% on previous year
For 13th year - 109% on previous year
For 14th year - 109% on previous year
For 15th year - 109% on previous year
CAPITALIZED POWER/ENERGY COST FOR 15 YEARS- STP#1
Power Cost for 15 Years at 10% Discount Rate {To be Calculated as follows - Discounted Power Cost = (A) x 365 x 6.00 x 7.61 Whereas- (A) is Guaranteed Power Consumption in KW.hr/day (To be guaranteed by Bidder). Rate of Power to be considered for evaluation = Rs. 6.00 per KW.hr/day, Discounting Factor for 15 years at 10% Discount Rate = 7.61}
OPERATION & MAINTENANCE OF STP#2 for Junior High School Nala (0.075MLD)
Annual O & M Prices of STP with I&D works except Electricity and Fuel (HSD+Lubricants) charges (The cost included herein are the yearly cost for plant Operation & maintenance including fixed cost (Cost of Manpower to be deployed, General Maintenance of Civil Structures, preventive and Breakdown Maintenance of Mechanical equipment, Online Monitoring System, Electrical items, Field & Laboratory Instruments, Supply of Laboratory Chemicals / Glassware / Consumable / Spares etc.) and Variable Cost (Including cost of Chemicals & Disposal of Plant Residuals viz. Screenings, Grits, Dewatered Sludge, etc)
For 1st year (Please Note - This item not to be quoted less then 4% of the TOTAL of 2.0 and 2.01 above : Design Build etc. Work for STP)
For 2nd year - 105% on previous year
For 3rd year - 105% on previous year
For 4th year - 106% on previous year
For 5th year - 106% on previous year
For 6th year - 106% on previous year
For 7th year - 107% on previous year
For 8th year - 107% on previous year
For 9th year - 107% on previous year
For 10th year - 108% on previous year
For 11th year - 108% on previous year
For 12th year - 108% on previous year
For 13th year - 109% on previous year
For 14th year - 109% on previous year
For 15th year - 109% on previous year
CAPITALIZED POWER/ENERGY COST FOR 15 YEARS- STP#2
Power Cost for 15 Years at 10% Discount Rate {To be Calculated as follows - Discounted Power Cost = (A) x 365 x 6.00 x 7.61 Whereas- (A) is Guaranteed Power Consumption in KW.hr/day (To be guaranteed by Bidder). Rate of Power to be considered for evaluation = Rs. 6.00 per KW.hr/day, Discounting Factor for 15 years at 10% Discount Rate = 7.61}
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .