Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.7 LAccepted-AOC 1003 SUB TREASURY DEVIKULAM | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | RAJAN L1 |
|---|---|---|---|---|
| 1.00Moolad Open Air Stadium | ||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 440 | sqm | 8.47 ₹3,726.8 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 133.15 | cum | 235.35 ₹31,335.91 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 18.75 | cum | 7,247.16 ₹1,35,855.26 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 66 | cum | 7,622.27 ₹5,03,069.82 Lowest |
| 1.00 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 45 | metre | 112.25 ₹5,051.25 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 116.27 | sqm | 352.77 ₹41,015.16 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.25 | cum | 9,582.11 ₹79,052.41 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 330 | kilogram | 102.7 ₹33,891 Lowest |
| 1.01 | 60.6.1:Laterite Masonry - Laterite masonry using neatly dressed stones of size 44cmx24cmx14cm in CM 1:6 including all cost of conveyance and labour charges etc. complete. | 23.77 | cum | 6,623.79 ₹1,57,467.36 Lowest |
Tender Value
₹33.9 L
EMD Value
₹50,000
Closing Date
29 Sept 2025, 6:55 pmClosed
Executive Engineer,
Executive Engineer, KyIP Division, Perambra.
KyIP MLA ADS 2022 23 Construction of Moolad Open Air Stadium in Kottur Grama Panchayath B w ch 3 000 km and 3 150 km of KBC and Betterment works to Ulliyeri Mini Stadium in Ulliyeri Grama Panchayath General Civil Work
2025_Irrig_796369_2
IRR/PI/TR/7249/2022_5_9_8/1
Open Tender
Civil Works - Others
Item Rate
180 days
Moolad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
27 Oct 2025
22 Sept 2025
3 Oct 2025
22 Sept 2025
29 Sept 2025
22 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1329212.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .