| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.9 LAccepted-AOC | ₹39.9 L | L1 | Accepted-AOC Competent committee approved the tender in favour of Ist Lowest Bidder |
| 2 | L2₹40.0 L+₹12,140 (0.30%)Rejected-AOC | ₹40.0 L+₹12,140 (0.30%) | L2 | Rejected-AOC Competent committee rejected the file due to higher rates |
| 3 | L3₹40.1 L+₹13,055 (0.33%)Rejected-AOC | ₹40.1 L+₹13,055 (0.33%) | L3 | Rejected-AOC Competent committee rejected the file due to higher rates |
| Sl No | Description | Qty | Unit | M/S SAMAR ELECTRICALS L3 | M/S R.S. ENGINEERING TRADERS L2 | ZAHOOR TRADERS L1 |
|---|---|---|---|---|---|---|
| 1.00The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-Bhaeri. Approx. distance upto 80 Km. Including safe loading and unloading. | ||||||
| 1.01 | PCC Pole 8.5 meter long. | 200 | Nos. | 900 ₹1,80,000 Lowest | 900 ₹1,80,000 Lowest | 900 ₹1,80,000 Lowest |
| 1.02 | STP 9 Mtr Long | 40 | Nos. | 900 ₹36,000 Lowest | 900 ₹36,000 Lowest | 900 ₹36,000 Lowest |
| 1.03 | STP 11 Mtr Long | 40 | Nos. | 900 ₹36,000 Lowest | 900 ₹36,000 Lowest | 900 ₹36,000 Lowest |
| 1.04 | Line material i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc | 200 | Qtl | 400 ₹80,000 | 400 ₹80,000 | 350 ₹70,000 Lowest |
| 1.05 | 11/0.4 KV 1 Phase 10/16 KVA T/F | 15 | Nos. | 1,050 ₹15,750 Lowest | 1,050 ₹15,750 Lowest | 1,050 ₹15,750 Lowest |
| 1.06 | 11/0.4 KV 3 Phase 25 KVA T/F | 15 | Nos. | 1,700 ₹25,500 Lowest | 1,700 ₹25,500 Lowest | 1,700 ₹25,500 Lowest |
| 1.07 | 11/0.4 KV 3 Phase 63 KVA T/F | 15 | Nos. | 2,200 ₹33,000 | 2,150 ₹32,250 | 2,100 ₹31,500 Lowest |
| 1.08 | 11/0.4 KV 3 Phase 100 KVA T/F | 15 | Nos. | 2,400 ₹36,000 Lowest | 2,400 ₹36,000 Lowest | 2,400 ₹36,000 Lowest |
| 1.09 | 11/0.4 KV 3 Phase 250 KVA T/F | 15 | Nos. | 3,400 ₹51,000 Lowest | 3,400 ₹51,000 Lowest | 3,400 ₹51,000 Lowest |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
25 Nov 2025, 5:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
Running Contract forDeposit Works under EDD-Baheri
2025_MVVNL_1089654_1
25/EDCB/2025-26
Open Tender
Electrical Works
Item Rate
365 days
WORK
AS PER TENDER FORM
3 documents required · 3 mandatory
₹3,540
SE,EDC
₹40,000
8 Jun 2026
11 Nov 2025
26 Nov 2025
11 Nov 2025
25 Nov 2025
11 Nov 2025
Amount
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-Bhaeri. Approx. distance upto 80 Km. Including safe loading and unloading.
PCC Pole 8.5 meter long.
STP 9 Mtr Long
STP 11 Mtr Long
Line material i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc
11/0.4 KV 1 Phase 10/16 KVA T/F
11/0.4 KV 3 Phase 25 KVA T/F
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 400 KVA T/F
11 KV Pilfer proof Metering cubical and CT PT Unit
33 KV Pilfer proof Metering cubical and CT PT Unit
Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
PCC Pole 8.5 Mtr Long Single Pole
PCC Pole 8.5 Mtr Long Double Pole
ST Pole 9 Mtr Long Single Pole.
ST Pole 9 Mtr Long Double Pole.
ST Pole 11 Mtr Long Single Pole.
ST Pole 11 Mtr Long Double Pole.
Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
PCC Pole 8.5 Mtr Long Single Pole
PCC Pole 8.5 Mtr Long Double Pole
ST Pole 9 Mtr Long Single Pole.
ST Pole 9 Mtr Long Double Pole.
ST Pole 11 Mtr Long Single Pole.
ST Pole 11 Mtr Long Double Pole.
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
Dismantling of Old and damaged conductor complete in all respect
Dismantling of PCC/ST Pole due to line shifting/damaged complete in all respect
Dismantling of Existing Distribution Transformer for increasing capacity/Shifting complete in all respect
11/0.4 KV 3 Phase 25 KVA T/F
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 400 KVA T/F
Laying, Stringing & Sagging of Following Conductor complete in all respect
ACSR Weasal Conductor
ACSR Rabbit Conductor
ACSR Dog Conductor
3 Phase Arial Bunched Conductor
1 Phase Arial Bunched Conductor
After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand form Double Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits
After Mounting of CT PT unit on double pole, laying of 50 Mtr 33 KV 3cx120 sq mm cable in single circuit on river sand form Double Pole to metering room complete in all respect. Alongwith filling of 04 nos cable jointing kits
Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Alongwith filling of 04 nos cable jointing kits
11 KV XLPE Cable Size 3x70 sqmm
11 KV XLPE Cable Size 3x120 sqmm
11 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x120 sqmm
33 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x300 sqmm
Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect. Alongwith filling of 04 nos cable jointing kits
11 KV XLPE Cable Size 3x70 sqmm
11 KV XLPE Cable Size 3x120 sqmm
11 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x120 sqmm
33 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x300 sqmm
Hoisting of Following size 11 KV & 33 KV XLPE Cable on double pole with GI pipe of size 6 " dia 4 Mtr long including the jumpering complete with clamps , nut and bolts.
11 KV XLPE Cable Size 3x70 sqmm
11 KV XLPE Cable Size 3x120 sqmm
11 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x120 sqmm
33 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x300 sqmm
Supply & Laying of 6" dia G Pipe at various places i.e road crossing & Hoisting etc. complete in all respect ((ISO certified GI pipe 150 NB 3 mm thick dia 6" would be Provided by contractor at his own cost)
Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250/400 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect All manpower, material and T&P provided by the contractor to complete the work.
Cage fencing of 250/400 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) by strengthening of wire mesh 20x3 mm M.S. flat horizontally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All manpower, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
The work of digging of pits, erection of Stay Clamp, Insulator etc.
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect
Installation of 33 KV Pilfer Proof Metering Cubicle in metering room complete in all respect
Mounting of Following Capacity Transformers as per norms complete in all respect -
25 KVA T/F
63 KVA T/F
100 KVA T/F
250 KVA T/F
400 KVA T/F
Fixing of Distribution Box complete in all respect
Guarding at road crossing complete in all respect
Supply & Fixing of Following Items to complete the work (If Not available in stores)
LT Clamps as per RESSPO Norms for PCC/ST pole
Nut & Bolt off size
F Clamp as per RESSPO Norms
Shackle Insulator as per RESSPO Norms
X-Arm Holding Clamp as per RESSPO Norms
Stay Clamps as per RESSPO Norms
11 KV Composite Polymer Disc insulator as per RESSPO Norms
Top Channel of size 100x50x2240 mm as per RESSPO Norms
T off Channel as per RESSPO Norms
11 KV Polymer Pin Insulator as per RESSPO norms
Safe back carriage of Scrap (if any) from work site to C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading.
Safe back carriage of Distribution Transformer from work site to C.B. Ganj store Bareilly approx distance upto 80 Km including safe loading & unloading.
11/0.4 KV 3 Phase 25 KVA T/F
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 400 KVA T/F
M/S R.S. ENGINEERING TRADERS (BID ID -5702169)
M/S SAMAR ELECTRICALS (BID ID -5702281)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tender_form.pdf
Tender Documents • 1.31 MB
BOQ_2000581.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .