Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC THAVANOOR GRAMA PANCHAD KERALA | KOZHIKODE | KERALA | 612906 | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹3.2 L+₹44,789.63 (16.1%)Rejected-AOC PATTASSERY HOUSE VENGARA VALIYORA P O MALAPPURAM DT 676304 MALAPPURAM DISTRICT | MALAPPURAM | KERALA | 676304 | L2 | Rejected-AOC second lowest bidder | |
| 3 | L3₹3.4 L+₹60,275.63 (21.7%)Rejected-AOC | L3 | Rejected-AOC highest bidder |
Tender Value
₹4.2 L
EMD Value
₹10,564
Closing Date
23 Sept 2024, 5:00 pmClosed
Shylimon PP
O/o Assistant Executive Engineer Minor Irrigation Sub Division Office, Kuttippuram
GENERAL-PM - Pothanur-Annual maintenance of L.I. Scheme Pothanur in Kalady Panchayath for the year 2024 -25. -General Civil Work
2024_Irrig_691213_1
IRR/IA/TR/3343/2024_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Kalady
Please refer Tender documents.
11 documents required · 11 mandatory
₹935
Yes
₹10,564
Yes
25 Oct 2024
13 Sept 2024
25 Sept 2024
13 Sept 2024
23 Sept 2024
13 Sept 2024
Amount
Annual Maintenance
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD5173/2024-2025:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed-In or underwater and/or liquid mud, including pumping out water as required for clearing silt from suction pit and leading channel.
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
Anees P
V V ABDUL SALAM
Bidder Name
A HASSAN
V V ABDUL SALAM
Anees P
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1075939.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .