Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All conditions fullfilled |
| 2 | Accepted-Technical | Accepted-Technical All conditions fullfilled |
| 3 | Rejected-Technical | Rejected-Technical All conditions not fullfilled |
| 4 | Rejected-Technical | Rejected-Technical All conditions not fullfilled |
Tender Value
₹27.0 L
EMD Value
₹54,000
Closing Date
25 Mar 2026, 4:00 pmClosed
Executive Engineer CD-II PDC Kargil
Baroo Kargil
Balance civil of Reconstruction/ Remodeling of Innundation channel and open lining channel (part I) at MHS Haftal under Reconstruction/Remodeling of open and covered power channel, Inundation channel, widening and strengthening of Tailrace channel
2026_PDNRE_18614_1
CDII/K/PDC/08 of 2025-26
Open Tender
Civil Works - Canal
Percentage
Sani Zanaskar
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Payable To Accounts officer PDC Kargil
₹54,000
30 Mar 2026
14 Mar 2026
26 Mar 2026
14 Mar 2026
25 Mar 2026
14 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by manual/mechanical means in trench for foundation of drain (not exceeding 1.5mtr in width) including disposal of excavated earth upto 1 mtr from the cutting edge, disposed earth to be leveled and neatly dressed | |||||
| 1.01 | All kind of soil @60% | 186.6 | cum | 191.25 | ₹35,687.25 |
| 1.02 | Ordinary Rock @ 30% | 93.3 | cum | 392.8 | ₹36,648.24 |
| 1.03 | Hard Rock blasting prohibited @ 10% | 31.1 | cum | 1,196.1 | ₹37,198.71 |
| 2 | Removal of deposited silt and Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 13.75 | cum | 2,452.55 | ₹33,722.56 |
| 3 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface including Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing. | 660 | sqm | 1,041.3 | ₹6,87,258 |
| 4 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including curing but excluding the cost of centring and shuttering. | 23.25 | cum | 5,202.9 | ₹1,20,967.42 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 128.5 | cum | 8,170 | ₹10,49,845 |
| 6 | Formwork for concrete casting including strutting , propping removal and stacking.in side slopes | 220 | sqm | 262.3 | ₹57,706 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,080 | kg | 123.2 | ₹3,79,456 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_44626.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .