Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC MANIKETTY HOUSE NELLIYANKAD STREET CHITTUR P O PALAKKAD 678101 | CHITTUR | PALAKKAD | KERALA | 678101 | ₹8.5 L | L1 | Accepted-AOC LI ACCEPTED |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | MURALEEDHARAN.M L1 | K.HARIDAS L2 |
|---|---|---|---|---|---|
| 1.00BUILDING | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 17.94 | cum | 359.72 ₹6,454.10 | 359.72 ₹6,454.10 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.31 | cum | 7,932.89 ₹65,898.52 | 7,932.89 ₹65,898.52 |
| 1.00 | OD156343/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 17.94 | cum | 3,993.46 ₹71,650.66 | 3,993.46 ₹71,650.66 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.09 | cum | 8,343.49 ₹84,210.84 | 8,343.49 ₹84,210.84 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 9.97 | sqm | 762.88 ₹7,604.39 | 762.88 ₹7,604.39 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 145.78 | kilogram | 112.43 ₹16,390.27 | 112.43 ₹16,390.27 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.24 | cum | 13,442.14 ₹30,150.72 | 13,442.14 ₹30,150.72 |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 20.6 | cum | 6,831.14 ₹1.4 L | 6,831.14 ₹1.4 L |
| 1.01 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 1,202.13 | kg | 194.27 ₹2.3 L | 194.27 ₹2.3 L |
Tender Value
₹8.5 L
EMD Value
₹21,184
Closing Date
11 Sept 2025, 5:00 pmClosed
AE LSGD,CTMC
AE LSGD,CTMC
Annual Plan-CTMC-2025-26-New Building Construction at GVLPS CHITTUR
2025_LSGD_793060_1
E1/407808/2025
Open Tender
Civil Works - Buildings
chittur thathamangalam municipality
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
₹21,184
9 Feb 2026
30 Aug 2025
12 Sept 2025
30 Aug 2025
11 Sept 2025
30 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1309217.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid