| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.0 LAccepted-AOC | ₹69.0 L | L1 | Accepted-AOC LOWEST QUOTED AMOUNT |
| 2 | L2₹70.2 LRejected-AOC VILL P O TIKOLA KALAN ROORKEE HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | ₹70.2 L | L2 | Rejected-AOC 2ND LOWEST QUOTED AMOUNT |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
4 May 2026, 1:00 pmClosed
GENERAL MANAGER, BHARTIYA CO- OPRATIVE GRAMIN VIKA
GENERAL MANAGER, BHARTIYA CO- OPRATIVE GRAMIN VIKAS EVAM NIRMAN LIMITED UTTARAKHAND
Construction of the security wall and wall-climbing facility at the PRD Training Center in Shivpuri, Rishikesh, District Dehradun
2026_BCGN1_94427_1
108 /BCGVENL/tender/2026-27 Dated 18/04/2026
Open Tender
Construction Works
183 days
Shivpuri, Rishikesh, District Dehradun
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Bhartiya Co-operative Gramin Vikas Evem Nirman Lim
₹1.4 L
11 May 2026
21 Apr 2026
4 May 2026
21 Apr 2026
4 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | PLUM MASONRY | - | - | - | - | - |
| 3 | Excavation in foundation for retaining & breast walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge | - | Cum | - | - | 1 |
| 4 | Concrete with cement, coarse sand and 40mm gauge stone ballast in proportion1:4:8 in foundationsand floors including supply of all material, labour and T&P etc. required for proper completionof thework. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 | - | Cum | 4,758.9 | - | 2 |
| 5 | Providing and laying reinforcedcement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 For nominal mix 1:2:4 (Hand mixed) | - | Cum | - | - | 3 |
| 6 | Supplying, fitting,and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 120 | - | tonne | 66,309.1 | - | 4 |
| 7 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | - | Cum | - | - | 5 |
| 8 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full
width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 | - | mtr | 152.4 | - | 6 |
| 10 | CIVIL WORK | - | - | - | - | - |
| 11 | EARTH WORK | - | - | - | - | - |
| 12 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | Cum | - | - | 7 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_111743.xls
BOQ • 0.36 MB
SBDshivpuriPRDWALLprotectionwork.pdf
Tender Documents • 4.05 MB
Download all tender documents and submit your bid