| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 LAccepted-AOC | ₹27.0 L | L1 | Accepted-AOC m/s voh group is l1 bidder |
| 2 | L2₹27.0 L+₹2,970.03 (0.11%)Rejected-Finance | ₹27.0 L+₹2,970.03 (0.11%) | L2 | Rejected-Finance VoH Group si l1 bidder |
| 3 | L3₹27.3 L+₹27,270.25 (1.01%)Rejected-Finance | ₹27.3 L+₹27,270.25 (1.01%) | L3 | Rejected-Finance VoH Group si l1 bidder |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹27 L
EMD Value
₹2.7 L
Closing Date
24 Apr 2026, 12:00 pmClosed
eo naugawan sadat
np naugwan sadat
mrf center par tromal machine tin shed work
2026_DOLBU_1136780_1
09/N.P.N.S/E-TENDER/2026-27
Open Tender
Civil Works
Percentage
30 days
npnaugawan sadat
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,186
Yes
eo naugawan sadat
₹2.7 L
20 Jun 2026
15 Apr 2026
24 Apr 2026
15 Apr 2026
24 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Laying and Jointing PVC Pipe. Heading | - | - | - | - |
| 2 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | - | Nos | - | - |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of lhe earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | - | Nos | - | - |
| 4 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) | - | Nos | - | - |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Nos | - | - |
| 6 | Diluting and injecting chemical emulsion for PRE-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | - | Nos | - | - |
| 7 | Treatment of masonry using chemical emulsion @ one litre per hole at 300 mm interval including drilling holes at 45 degree and plugging them with cement mortar 1:2 (1 ce ment : 2 coarse sand) to the full depth of the hole,With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | - | Nos | - | - |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.Concrete of M25 grade with minimum cement content of 330 kg /cum. (For R.C.C. Beam) (As per design mix concrete M-25 cement concrete @ 362.00kg/cum.) (As per design mix enclosed) variation in cement consumption should be taken into consideration while payment) | - | Nos | - | - |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Nos | - | - |
| 10 | Painting on D.P.C. with two coat of air blown bitumen 85/50 or 85/25 1.7 kg/sqm approximate including cost of fuel if any. | - | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_2122742.xls
BOQ • 0.33 MB
noting.pdf
PDF • 0.22 MB
noting.pdf
PDF • 0.22 MB
noting.pdf
PDF • 1.96 MB
new.pdf
PDF • 1.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .