Loading…
Loading…
Tender Value
₹210.6 Cr
EMD Value
₹35 L
Closing Date
1 Oct 2026, 4:00 pm4d left
Additional Chief Engineer (P&C)
Supply, Laying, Erection, Testing and Commissioning of 66kV,1CX630 sqmm XLPE Cable with Poly.Al. /Aluminum construction on EPC basis Various lines under Bharuch Circle.
341672
ACE(P&C)/Contract/E-513/UG/66kV/S,L&E/TN-13
Open
Electrical Works
Works
Vadodara
38 documents required · 35 mandatory · 3 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹35 L
8 Sept 2026
8 Sept 2026
8 Sept 2026
1 Oct 2026
8 Sept 2026
Technical Bid. Technical Bid.
c) Payment of Earnest Money
Deposit (EMD) will be
RTGS/NEFT/Online or
Demand Draft or Banker’s
Cheque or Pay Order or Bank
12.2 The bid security is required to Guarantee.
protect the owner against the risk
of Bidder’s conduct, which would 12.2 The bid security is required to
warrant the guarantee forfeiture, protect the owner against the risk of
pursuant to relevant paras Bidder’s conduct, which would
elsewhere warrant the guarantee forfeiture,
pursuant to relevant paras elsewhere
The bid guarantee shall be made
payable to the Owner without any The bid guarantee shall be made
condition whatsoever. payable to the Owner without any
condition whatsoever.
Seal & Signature of Bidder
12.3 Any bid not secured in
accordance with Para 23.1 above 12.3 Any bid not secured in
will be rejected by the Owner as accordance with Para 23.1 above will
non-responsive. No exemptions be rejected by the Owner as non-
are made in the furnishing of the responsive. No exemptions are made
security. in the furnishing of the security.
12.4 Unsuccessful Bidder’s bid 12.4 Unsuccessful Bidder’s bid
security/EMD will be security/EMD will be returned/refunded
returned/refunded on finalization of forthwith on finalization of tender i.e.,
tender or three months-from the once the award of contract, after opening
date of submission of tender of price bids. However, the Bid Security/
whichever is later. EMD of the bidder ranked next (L2) to the
bidder determined as the successful
bidder (L1) shall be retained by GETCO,
along with the Bid Security/ EMD of the
successful bidder. Bid Security/ EMD of
L2 bidder shall be returned immediately
after the Letter of Acceptance/ Award
(LOA) is issued by GETCO to the
successful bidder and acknowledged/
accepted by the successful bidder or the
Contract is signed with the successful
bidder, whichever event occurs earlier.
However, if there is a delay of 21 days or
more in aforesaid events reckoned from
the date of approval of award of contract
by the competent authority, as aforesaid,
the Bid Security/ EMD of the L2 bidder
shall be released immediately after the
said period of 21 days.
If the validity of the bid expires and any
bidder chooses not to extend the bid
validity, the Bid Security/ EMD of such
bidder shall be returned forthwith.
12.5 The successful bidders, Bid
Security will be discharged upon,
furnishing the contract security
deposit / performance guarantee.
12.5 The successful bidders, Bid
Security will be discharged upon, 12.6 The bid guarantee may be
furnishing the contract forfeited.
performance guarantee.
a) If a Bidder withdraws its bid
12.6 The bid guarantee may be during the period of bid validity
forfeited. specified by the bidder on the
a) If a Bidder withdraws its bid b) If a bidder refuses to accept
during the period of bid the contract or fails to
validity specified by the commence the works
bidder on the bid Form. (including supplies within thirty
Seal & Signature of Bidder
b) If a bidder refuses to accept days of letter of award of
the contract or fails to contract)
commence the works
(including supplies within
thirty days of letter of award
2. Part –I 47.0 Terms of Payment 47.0 Terms of Payment
General The payment for materials to be The payment for materials to be supplied
Conditions supplied and erected shall be and erected shall be made as under only
of Contract/ made as under only after after execution of the contract
Clause 47.0 execution of the contract documents/furnishing of Security Deposit
and on execution of substation work.
and its sub- documents/furnishing of Security 47.1 For Supply
clauses Deposit and on execution of
substation work. 47.1.1 Interest Bearing Advance
47.1 For supply (Optional*):
(i) Interest Bearing Advance
(Optional*): Ten percent (10%) of
the total Ex-works price
component of Substation materials
shall be paid as an interest bearing
initial advance, at the rate of interest
as per (ii) below, after signing the
Contract Agreement and on
submission of the following:
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for
[{110% (one hundred ten percent) of
the amount of Advance}], from a
Public Sector Indian bank/Scheduled,
Commercial Bank in the form
attached herewith as Annexure-I
(The guarantee shall be initially valid
up to 90 days after the Time of
Completion and shall be reduced at
the end of every Quarter prorata to
the advance adjusted),
(c) Performance Securities in line with
GCC Clause 36.0 including its sub-
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents is
submitted by the Contractor to the
Employer within 3 months from the
date of Letter/ Notification of Award.
In case the Contractor does not
Seal & Signature of Bidder
submit the requisite documents
including applicable Bank
Guarantee(s) /Security(ies) within the
aforesaid period, the advance shall
not be payable. The Contractor shall,
within 7 days from the date of receipt
of Advance, furnish an Advance
Receipt Voucher to the Employer, as
prescribed under the GST Law.
Note: * This payment is an optional
payment. The Contractor has the
option of taking the interest bearing
initial advance or otherwise. The
option for advance payment is to be
indicated by the bidder in its bid as per
the format attached herewith as
Annexure–III and shall be deemed to
be part of the bidding scheduled
referred as SCHEDULED-21 to be
submitted by the bidder with
(ii) Interest rate applicable on
advance payment to the Contractor
shall be at the rate equal to one-year
MCLR rate [One-year Tenor rate p.a.]
published by State Bank of India
prevailing as on the date of drawl of
advance. The said interest rate shall
remain fixed and shall be applicable
till the advance amount is fully repaid.
The interest will be charged
considering proportionate adjustment
of advance against progressive
payment as per 47.1.2 below. The
interest shall be calculated on the
daily progressive balances
outstanding as on the date of
recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable
on interest paid on the amount of
Advance. The Contractor is, however,
advised to check the position from
their own sources. If payable even at
later stage, the same shall be to the
Contractor’s account and Employer
shall not reimburse any GST on this
Seal & Signature of Bidder
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior
to the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from
the payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted
advance amount at any stage during
the execution of the work along with
the accrued interest thereon till the
time of return / payment. Alternatively,
the contractor may also request
GETCO for early adjustment of the
advance along with accrued interest.
Further, the Contractor shall submit
the certificate of Tax Deduction at
Source (TDS) on interest within
months from the end of the quarter in
which adjustment of advance has
been made for claiming refund from
Employer. No claim for refund will be
entertained after end of the aforesaid
period of 3 months. Further, while
submitting the TDS Certificate the
details of Contract No, Project,
Region, Quarter etc to which the TDS
certificate pertains, shall also be
submitted tallying the amount with the
TDS Certificate.
In case, the Contractor opts not to
take interest bearing advance as
above, it would be mandatory for him
to submit the documents listed at Sl.
No. (i) (c) above within twenty-eight
(28) days of issuance of Letter/
Notification of Award.
47.1.2 Progressive Payments
Seal & Signature of Bidder
(i) 80% of supply value for each (i) (a) 70% of supply value if contractor
consignment of Sub-Station material opts to take interest bearing initial
including accessories on submission advance or
of invoice along with 100% GST, (b) 80% instead of 70% of supply value if
duties, F & I shall be paid from contractor opts not to take interest
corporate office within 30 days from bearing initial advance or has opted to
actual material receipt date take interest bearing initial advance but
mentioned in SR Note after verifying the advance payment has become
the following documents. inadmissible,
each consignment of Sub-Station
A. Tax invoice. material including accessories on
B. Delivery challan. submission of invoice along with
C. Endorsed RR / LR copy. 100% GST, duties, F & I shall be paid
D. Dispatch clearance certificate / from corporate office within 30 days
letter wherever applicable.
from actual material receipt date
E. E Way Bill, if applicable
mentioned in SR Note after verifying
the following documents.
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy.
D. Dispatch clearance certificate /
letter wherever applicable.
E. E Way Bill, if applicable
(ii) 10% of the of supply value shall be
(ii) 10% payment out of balance 20%
shall be released from corporate office
paid pro-rata on completion of
on completion of sub-station work, erection/ installation of substation
handing over and preliminary equipment, hardware, structures etc
acceptance certificate issued by the and furnishing of completion
site engineers in charge after certificate from Engineer-in-charge
rectification work if any and settlement and Chief Engineer (Projects), pro-
of material account according to rata on monthly basis.
actual quantity utilized for completion
of S/S. Supply to be made as per
approved drawing/ BOQ.
(iii) Balance 10% of supply value shall
(iii) Balance10% of supply value shall
be paid on completion of on quarterly
be paid from corporate office on
successful commissioning of Sub-
basis on completion of erection/
Station against completion certificate installation of completed bay(s) in all
and only after settlement of material respects and liquidation of
account statement of items supplied, defects/deficiencies of corresponding
used, erected and successful bay on prorata basis and on
commissioning is settled for complete completion certificate from Engineer-
job and will be released only after in-charge and Chief Engineer
passing of final bill. (Projects) and submission of an
unconditional & irrevocable Bank
Guarantee for amount paid so that
Bank Guarantee available with the
GETCO is of cumulative value of
amount paid on this account, initially
valid till 3 months beyond the
Seal & Signature of Bidder
scheduled date of completion of
testing & commissioning of the
substation and its taking over by the
GETCO and shall be extended from
time to time till the actual date of
successful completion of testing &
commissioning of substation
complete in all respects and its taking
over by the GETCO, including
issuance of preliminary acceptance
certificate issued by the site
engineers in charge after rectification
work if any and settlement of material
account according to actual quantity
utilized for completion of S/S. Supply
to be made as per approved drawing/
(iv) Welfare Cess
(iv) Welfare Cess
The modality of payment/ The modality of payment/
reimbursement of welfare cess will reimbursement of welfare cess will
be as under. be as under.
On receipt of A/T, the contractor / On receipt of A/T, the contractor /
bidder will get them registered under bidder will get them registered
Welfare Cess Act and submit the under Welfare Cess Act and submit
documentary evidence to the the documentary evidence to the
concern office. concern office.
Before release of payment of first Before release of payment of first
R.A.Bill, the contractor has to submit R.A.Bill, the contractor has to
the documentary evidence of submit the documentary evidence
registration. Only thereafter, the bill of registration. Only thereafter, the
will be processed for payment.
bill will be processed for payment.
Before release of payment of Before release of payment of
subsequent R.A.Bills, the subsequent R.A.Bills, the
contractor has to submit the contractor has to submit the
documentary evidence of documentary evidence of payment
payment of welfare cess of of welfare cess of previous R.A.Bill.
previous R.A.Bill.
Before release of payment of Final
Before release of payment of Bill, the contractor has to submit the
Final Bill, the contractor has to documentary evidence of payment
submit the documentary of welfare cess of previous R.A.Bill
evidence of payment of welfare as well as the final bill.
cess of previous R.A.Bill as well
If the R.A.Bill happens to be first
as the final bill.
and final bill, then before release of
If the R.A.Bill happens to be first payment, contractor has to submit
and final bill, then before release documentary evidence of
of payment, contractor has to registration under Welfare Cess Act
submit documentary evidence of and evidence of payment of welfare
registration under Welfare Cess cess.
Act and evidence of payment of
The welfare cess shall be
reimbursed to the contractor on
The welfare cess shall be submission of copy of
reimbursed to the contractor on
Seal & Signature of Bidder
submission of copy of documentary evidence of
documentary evidence of payment by observing due
payment by observing due formalities.
47.2 For Erection works.
47.2 For Erection works.
Supply of Services Portion.
47.2.1 A. Interest Bearing Initial
Advance (Optional ^^) Ten percent
(10%) at the rate of interest as per
47.2.1 A.1 1st Installment of 05%
(Five) of the total Installation price
component shall be paid on
Establishment of Contractor’s site
offices for preparatory to mobilization
for Installation establishment and on
submission of the following:
(a) Proforma invoice,
(b) Advance Bank Guarantee for
[{110% (one hundred ten percent) of
the amount of Advance} Plus {amount
of GST reimbursable on Advance as
per the Proforma invoice}] from a
Public Sector Indian bank/Scheduled,
Commercial Bank in the form
attached herewith as Annexure-I
(The guarantee shall be initially valid
up to 90 days after the Time of
Completion and shall be reduced at
the end of every Quarter prorata to
the advance adjusted),
(c) Performance Securities in line with
GCC Clause 36.0 including its sub-
47.2.1. A.2 2nd Installment of 05%
(Five)^^ of the total Installation price
component shall be paid on start of
equipment erection & certification of
the same by Project Manager and on
submission of the following:
Seal & Signature of Bidder
(a) Proforma invoice(s),
(b) Advance Bank Guarantee for
[{110% (one hundred ten percent) of
the amount of Advance} Plus {amount
of GST reimbursable on Advance as
per the Proforma invoice}] from a
Public Sector Indian bank/Scheduled,
Commercial Bank in the form
attached herewith as Annexure-I
(The guarantee shall be initially valid
up to 90 days after the Time of
Completion and shall be reduced at
the end of every Quarter prorata to
the advance adjusted),
(c) Performance Securities in line with
GCC Clause 40.0 including its sub-
(d) A declaration by the Contractor
stating that 1st Installation (5%) of
advance has been utilized against the
mobilization works for the subject
Recovery of this advance shall be
adjusted in such a way that that all the
sums of advance with interest thereon
shall be fully recovered 3 months prior
to the scheduled Time of Completion,
failing which the whole amount of
advance along with interest thereon
shall be recovered immediately from
the payments due to the Contractor.
The contractor may however, return /
pay to GETCO the unadjusted
advance amount at any stage during
the execution of the work along with
the accrued interest thereon till the
time of return / payment. Alternatively,
the contractor may also request
GETCO for early adjustment of the
advance along with accrued interest.
Seal & Signature of Bidder
Note: ^^ This payment is an optional
payment. The Contractor has the
option of taking the interest bearing
advance or otherwise. The option for
advance payment is to be indicated
by the bidder in its bid as per the
format attached herewith as
Annexure–III and shall be deemed to
be part of the bidding scheduled
referred as SCHEDULE-21 to be
submitted by the bidder with
Note: After release of various
advances, the rate of recovery of the
advance shall be re-adjusted.
Provided further that the Proforma
Invoice(s) for advance payment along
with all supporting documents as per
para A.1 and A.2 above is submitted
by the Contractor to the Employer
within 3 months from the date of
fulfillment of the requisite activities. In
case the Contractor does not submit
the requisite documents including
applicable Bank Guarantee(s)/
Security(ies) within the aforesaid
period, the advance at A.1 & A.2
above shall not be payable.
The Contractor, shall, within 7 days
from the date of receipt of Advance,
furnish an Advance Receipt Voucher
to the Employer, as prescribed under
47.2.1 A.3. Interest rate applicable on
advance payment to the Contractor
shall be at the rate equal to one year
MCLR rate [One-year Tenor rate p.a.]
published by State Bank of India
prevailing as on the date of drawl of
advance. The said interest rate shall
remain fixed and shall be applicable
till the advance amount is fully repaid.
The interest will be charged
Seal & Signature of Bidder
considering proportionate adjustment
of advance against progressive
payment for the work done as per
47.2.2 below. The interest shall be
calculated on the daily progressive
balances outstanding as on the date
of recovery/adjustment. It is the
Employer’s understanding that as per
extant provisions, GST is not payable
on Interest paid on the amount of
Advance. The Contractor may,
however, advised to check the
position from their own sources. If
payable, the same shall be to the
Contractor’s account and Employer
shall not reimburse any GST on this
Further, the Contractor shall submit
the certificate of Tax Deduction at
Source (TDS) on interest within
months from the end of the quarter in
which adjustment of advance has
been made for claiming refund from
Employer. No claim for refund will be
entertained after end of the aforesaid
period of 3 months. Further, while
submitting the TDS Certificate the
details of Contract No, Project, etc to
which the TDS certificate pertains,
shall also be submitted tallying the
amount with the TDS Certificate.
In case, the Contractor opts not to
take interest bearing advance as
above, it would be mandatory for him
to submit the document listed at Sl.
No. A1 (c) and, A2(c) above within
twenty-eight (28) days of issuance of
Letter / Notification of Award.
(i) 90% payment of amount claimed
covering various activities such as
excavation, foundation, erection, 47.2.2 (i) (a) 80% payment if
earthing, stringing of bus bar and contractor opts to take interest
earthwire including insulator hoisting bearing initial advance or
works against R.A. bills duly certified
(b) 90% payment instead of 80%
by EIC within 30 days from the date
of R.A. bill. payment if contractor opts not to take
interest bearing initial advance or has
opted to take interest bearing initial
Seal & Signature of Bidder
advance but the advance payment
has become inadmissible,
of amount claimed covering various
activities such as excavation,
foundation, erection, earthing,
stringing of bus bar and earthwire
including insulator hoisting works
against R.A. bills duly certified by EIC
within 30 days from the date of R.A.
(ii) Balance 10% of erection value
shall be paid against commissioning
of Sub-Station only after settlement 47.2.2 (ii) Balance 10% of erection
of material account statement of items value shall be paid against
supplied, used, erected and commissioning of Sub-Station only
successful commissioning of Sub-
Station line the same amount will be after settlement of material account
release in final bill only and payment statement of items supplied, used,
will be made only after passing of final erected and successful
bill. commissioning of Sub-Station line the
same amount will be release in final
bill only and payment will be made
only after passing of final bill.
(iii) If net payable amount is more
than Rs 5.0 Lacs, payment will be
released from circle (iii) If net payable amount is more than
office/corporate office. Rs 5.0 Lacs, payment will be released
from circle office/corporate office.
(iv) Welfare Cess
The modality of payment/
reimbursement of welfare cess
(iv) Welfare Cess
will be as under.
The modality of payment/
On receipt of A/T, the contractor / reimbursement of welfare cess will
bidder will get them registered be as under.
under Welfare Cess Act and
submit the documentary On receipt of A/T, the contractor /
evidence to the concern office. bidder will get them registered under
Before release of payment of Welfare Cess Act and submit the
first R.A.Bill, the contractor has to documentary evidence to the
submit the documentary concern office.
evidence of registration. Only Before release of payment of first
thereafter, the bill will be R.A.Bill, the contractor has to
processed for payment. submit the documentary evidence
Before release of payment of of registration. Only thereafter, the
subsequent R.A.Bills, the bill will be processed for payment.
contractor has to submit the Before release of payment of
documentary evidence of subsequent R.A.Bills, the
payment of welfare cess of contractor has to submit the
previous R.A.Bill. documentary evidence of payment
of welfare cess of previous R.A.Bill.
Seal & Signature of Bidder
Before release of payment of Before release of payment of Final
Final Bill, the contractor has to Bill, the contractor has to submit the
submit the documentary documentary evidence of payment
evidence of payment of welfare of welfare cess of previous R.A.Bill
cess of previous R.A.Bill as well as well as the final bill.
as the final bill. If the R.A.Bill happens to be first
If the R.A.Bill happens to be first and final bill, then before release of
and final bill, then before release payment, contractor has to submit
of payment, contractor has to documentary evidence of
submit documentary evidence of registration under Welfare Cess Act
registration under Welfare Cess and evidence of payment of welfare
Act and evidence of payment of cess.
welfare cess. The welfare cess shall be
The welfare cess shall be reimbursed to the contractor on
reimbursed to the contractor on submission of copy of documentary
submission of copy of evidence of payment by observing
documentary evidence of due formalities.
payment by observing due
3. Part –I 2.0 Tender Fee 2.0 Tender Fee
(SCC)/ The tender fee plus GST as The tender fee plus GST as
Special applicable specified in applicable specified in notice
Conditions notice inviting tender is inviting tender is payable by
of Contract/ payable by Demand Draft Demand Draft (DD) at
Clause 2.0 (DD) at Vadodara drawn on Vadodara drawn on any
any Scheduled Bank in Scheduled Bank in favour of
favour of Gujarat Energy Gujarat Energy Transmission
Transmission Corporation Corporation Ltd. The same will
Ltd. The same will be be furnished in Cover with
furnished in Cover-1 of Bid EMD (Bid Security).
along with EMD (Bid
Security). Payment of Tender Fees will
be accepted by RTGS /
NEFT/Online only.
4. Part –I 5.0 QUALIFYING 5.0 QUALIFYING
(SCC)/ REQUIREMENT REQUIREMENT
Conditions Qualifying Requirements for Qualifying Requirements for 66kV
of Contract/ 66kV 630sqmm. Cable 630sqmm. Cable supply,
Clause 5.0 supply, Laying & Erection Laying & Erection EPC work
and its sub- EPC work
1.0 QUALIFICATION OF THE 1.0 QUALIFICATION OF THE BIDDER
Qualification of Bidder will be based on
Qualification of Bidder will be based meeting the minimum pass/fail criteria
on meeting the minimum pass/fail specified herein regarding the Bidder's
criteria regarding the Bidder's Technical Experience Requirements and
Technical Experience and Financial Position Requirements as
Financial Position as demonstrated by the Bidder's responses
demonstrated by the Bidder's and supporting documents submitted
responses in the corresponding with the Bid. Technical experience and
Seal & Signature of Bidder
Bid Schedules. Technical financial resources of any proposed
experience and financial subcontractor shall not be taken into
resources of any proposed account in determining the Bidder's
subcontractor shall not be taken compliance with the qualifying
into account in determining the requirements. The bid can be submitted
Bidder's compliance with the by an individual firm or a Joint
qualifying criteria. The bid can be Venture/Consortium of not more than
submitted by an individual firm or two (2) firms, one of whom is designated
a Joint Venture/Consortium of not as the Lead Partner. For the purpose of
more than two (2) firms, one of the qualification the following shall also
whom is designated as the Lead apply:
a. For the purpose of qualifying
Note: requirements, cumulative
supply/erection shall be
For the purpose of qualifying calculated based on the
requirements, cumulative certificate(s) from the respective
supply/erection shall be Transmission Utilities or major
calculated based on the industries only.
certificate(s) from the respective
Transmission Utility or major b. "Rkm" denotes "Route kilometer".
industries only.
"Ckm" denotes "Circuit kilometer". c. Satisfactory operation shall be
Satisfactory operation shall be substantiated by certificate(s)
substantiated by certificate(s) issued by the end user/Employer
issued by the end user/Employer certifying operation without
certifying operation without adverse remarks.
adverse remarks.
Relevant supporting documents d. Relevant supporting documents
(e.g., supply/erection completion (e.g., supply/erection completion
certificates, performance certificates, performance
certificates) from the original certificates) from the original
customer must be submitted. customer must be submitted.
1.1 TECHNICAL EXPERIENCE e. No firm shall be associated, in
any role, with more than one
1.1.1 Route-1: Original Equipment bid for this package The roles a
Manufacturer (OEM) Bidder firm may participate in bidding
under this QR are: (i) OEM Bidder
(I). The Bidder must be an Original under Route-1; (ii) Non-OEM
Equipment Manufacturer (OEM) Bidder under Route-2;(iii)
of 66kV or higher voltage class nominated OEM under Route-2;
XLPE cables. (iv) OEM Partner of a Joint
Venture/Consortium under
(II). The Bidder must have designed, Route-3; and (v) Erection Partner
manufactured, type tested (as per of a Joint Venture/Consortium
relevant IS/IEC/ANSI standards under Route-3. A firm that has
with latest amendments), participated in any one of these
supplied and erected at least: roles in a bid shall not participate
in any role — the same role or a
(a) Supplied: Cumulatively supplied different one — in any other bid
a minimum of 50 km length of for this package. Accordingly,
66kV or above voltage class without limitation to the generality
XLPE cable during the last seven of the above, a firm that:
(7) years as on the date of NIT, to
a Transmission Utility or major i. is the OEM Bidder under
industry. Additionally, the bidder Route-1 in one bid, shall not
shall submit satisfactory participate as the nominated
performance certificate(s) for OEM under Route-2, or as the
OEM Partner of a
Seal & Signature of Bidder
66kV or above voltage class JV/Consortium under Route-
XLPE cable covering minimum 10 3, in another bid, or vice
km length that has been in service versa;
for a minimum period of two (2)
years as on the date of NIT, ii. is the Non-OEM Bidder under
issued by a Transmission Utility or Route-2 in one bid, shall not
major industry. participate as the Erection
Partner of a JV/Consortium
(b) Erected: Erected at least 20.0 under Route-3, in another bid,
Rkms route length of cumulatively or vice versa; or
of 66kV or above voltage class
XLPE cables during last seven (7) iii. participates in any OEM-side
years as on the date of NIT with a role (as OEM Bidder,
Transmission Utility or major nominated OEM, or OEM
industry. Out of which at least one Partner) in one bid, shall not
line should of minimum 2km route participate in any non-
length. OEM/erection-side role (as
Subletting work experience shall not Non-OEM Bidder or Erection
be counted unless authenticated Partner) in another bid, or vice
by owner of the work. versa.
(c) Performance: At least One(1) Any bid found in violation of this
66kV or above cable line with requirement shall be rejected, along
66kV cable supply and erected as with every other bid in which the firm
above shall be in satisfactory concerned has so participated.
operation for not less than One (1)
years as on the date of NIT. 1.1 TECHNICAL EXPERIENCE
1.1.2 Route-2: Non-OEM Bidder
(I). Non-OEM Bidders are eligible, 1.1.1 Route-1: Original Equipment
provided that the 66kV Manufacturer (OEM) Bidder
630sq.mm. cable is sourced from
an OEM manufacturer that (I). The Bidder must be an Original
conforms to the technical Equipment Manufacturer (OEM) of 66kV
specifications and is an approved or higher voltage class XLPE cables.
vendor of GETCO.
(II). The Bidder must have designed,
Provided further that the sourcing of manufactured, type tested (as per
66kV 630sq.mm. cable shall be relevant IS/IEC/ANSI standards with
carried out from a single OEM latest amendments), supplied and
unless specifically agreed to in erected at least:
writing by GETCO. It shall be the
sole responsibility of the Bidder to (a) Supplied: Cumulatively supplied
finalize the OEM source without a minimum of 50 km length of
any adverse impact on the 66kV or above voltage class
delivery or completion schedule, XLPE cable during the last seven
and any delay or consequential (7) years preceding the date of
damages arising from the NIT, to one or more Transmission
selection or sourcing of the OEM Utilities or major industries.
shall be entirely borne by the Additionally, out of the aforesaid
Bidder. In this regard, an cumulatively supplied length, the
Undertaking as per Annexure-A Bidder shall submit satisfactory
(SCC) shall be submitted by the performance certificate(s)
Non-OEM Bidder confirming the evidencing that a minimum of
aforementioned commitments km length of 66kV or above
and compliance with the supply voltage class XLPE cable has
requirements specified in Route- been in satisfactory service for a
1. II (a), failing which the bid from minimum period of two (2) years
the bidder shall be deemed non- as on the date of NIT, issued by
Seal & Signature of Bidder
responsive and non-compliant the Transmission Utilities or major
and shall be rejected. industries.
(II). The Non-OEM Bidder must: (b) Erected: Erected at least 20 Rkm
route length cumulatively of 66kV
(a) Procurement & Supply: Have or above voltage class XLPE
procured and supplied a minimum cables during last seven (7) years
of 50 km length cumulative of preceding the date of NIT with a
66kV or above voltage class Transmission Utility or major
XLPE cables from recognized industry. Out of which at least one
cable manufacturers during the line should of minimum 2km
last seven (7) years as on the date route length. Subletting work
of NIT, to a Transmission Utility or experience shall not be counted
major industry. unless authenticated by order
placing authority
(b) Erected: Erected at least (CE(P&C)/CE(Project)/CE(AM)).
20Rkms route length of
cumulatively of 66kV or above (c) Performance: At least One (1)
voltage class XLPE cables during 66kV or above cable lines
last seven (7) years as on the date supplied and erected as above
of NIT with a Transmission Utility shall be in satisfactory operation
or major industry. Out of which at for not less than One (1) year as
least one line should of minimum on the date of NIT.
2km route length.
Subletting work experience shall not 1.1.2 Route-2: Non-OEM Bidder
count unless authenticated by
owner of the work. (I). Non-OEM Bidders are eligible,
provided that the 66kV cable is sourced
(c) Performance: At least One (1) from an OEM manufacturer that
66kV or above cable lines conforms to the technical specifications
supplied and erected as above and is an approved vendor of GETCO.
shall be in satisfactory operation
for not less than One (1) years as The sourcing of 66kV cable under this
on the date of NIT. Route shall be carried out from a single
OEM, who shall be an approved
1.1.3 Route-3: Joint Venture vendor of GETCO, unless GETCO
(JV)/Consortium specifically agrees otherwise in writing.
Accordingly, the Bidder shall pre-identify
Where a bidder does not individually and nominate such OEM, who shall meet
meet the technical requirements the qualifying requirements specified
as specified under Route-1 or under Route-1 (I) and (II)(a), and shall
Route-2 above, submit, along with its bid, all relevant
submission/participation by a supporting documents establishing that
Joint Venture/Consortium is the nominated OEM meets the aforesaid
permitted, provided the requirements, including Type Test
JV/Consortium collectively meets Reports, Supply Orders, and
all requirements specified below. Performance Certificates for the 66kV &
above voltage cable supplied by the
JOINT VENTURE / CONSORTIUM nominated OEM. The Bidder shall, in
BIDS addition, furnish jointly with the
nominated OEM a MOA/ MOU. It shall
(I). Bids may be submitted by a Joint be the sole responsibility of the Bidder to
Venture/Consortium of not more finalize and maintain the nominated OEM
than two partners, one of whom source without any adverse impact on the
must be an Original Equipment delivery or completion schedule, and any
Manufacturer (OEM) and the delay or consequential damages arising
other a non-OEM erection firm. from the selection or sourcing of the OEM
shall be entirely borne by the Bidder. No
(II) Provided that a duly executed change of the nominated OEM shall be
Joint Venture/Consortium
Seal & Signature of Bidder
Agreement as per Annexure-B permitted after bid submission, unless
(SCC) shall be submitted by all specifically approved by GETCO.
partners, which shall inter alia
contain provisions establishing (II). The Non-OEM Bidder must:
that all partners of the
JV/Consortium shall be jointly and (a) Procurement & Supply: Have
severally liable and responsible procured, and supplied a
for the successful performance of minimum of 50 km length
the Contract, including but not cumulative of 66kV or above
limited to completion within the voltage class XLPE cables from
stipulated time, adherence to recognized cable manufacturers
technical specifications, quality during the last seven (7) years
standards, and fulfilment of all preceding the date of NIT, to one
contractual obligations. The or more Transmission Utilities or
JV/Consortium Agreement shall major industries.
explicitly state that each partner
assumes full responsibility for the (b) Erected: Have erected at least
acts, omissions, defaults, and Rkm route length cumulatively of
liabilities of the other partner(s), 66kV or above voltage class
and that GETCO shall be entitled XLPE cables during the last
to enforce the Contract against seven (7) years preceding the
any or all partners individually or date of NIT with one or more
collectively at its sole discretion, Transmission Utilities or major
failing which the bid from the industries. Out of which at least
JV/Consortium shall be deemed one line should of minimum 2km
nonresponsive and non- route length. Subletting work
compliant and shall be rejected. experience shall not be counted
Further, and a Joint Deed of unless authenticated by order
Undertaking in favour of GETCO placing authority
as per Annexure-C (SCC) jointly (CE(P&C)/CE(Project)/CE(AM)).
signed by the partners of the JV
shall also be summitted along (c) Performance: At least One (1)
with its bid. 66kV or above cable lines
supplied and erected as above
(III) The Joint Venture/Consortium shall be in satisfactory operation
shall collectively meet the for not less than One (1) year as
complete technical experience on the date of NIT.
requirements as specified under
Route-1 in respect of 1.1.3 Route-3: Joint Venture
manufacturing (including supply) (JV)/Consortium
and erection of 66kV or above
voltage class XLPE cables, with Where a bidder does not individually
each Partner meeting the meet the technical requirements as
respective requirements specified specified under Route-1 or Route-2
below. above, submission/participation by a
Joint Venture/Consortium is permitted,
(a) OEM Partner Requirements: provided the JV/Consortium collectively
One partner of the JV/Consortium meets all requirements specified below.
must be an Original Equipment
Manufacturer (OEM) with JOINT VENTURE / CONSORTIUM BIDS
experience in design,
manufacturing, and supply of the (I). Bids may be submitted by a Joint
required cables, and must meet Venture/Consortium of not more than
the qualifying requirements as per (two) partners, one of whom must be an
Route-1 (II) (a), as follows: Original Equipment Manufacturer (OEM)
and the other a non-OEM erection firm.
Supply Experience: Cumulatively
supplied a minimum of 50 km (II) Provided that a duly executed Joint
length of 66kV or above voltage Venture/Consortium Agreement as per
class XLPE cable during the last Annexure-B (SCC) shall be submitted by
Seal & Signature of Bidder
seven (7) years as on the date of all partners, which shall inter alia contain
NIT, to a Transmission Utility or provisions establishing that all partners of
major industry. Additionally, the the JV/Consortium shall be jointly and
bidder shall submit satisfactory severally liable and responsible for the
performance certificate(s) for successful performance of the Contract,
66kV or above voltage class including but not limited to completion
XLPE cable covering minimum within the stipulated time, adherence to
10km length that has been in technical specifications, quality
service for a minimum period of standards, and fulfilment of all
two (2) years as on the date of contractual obligations. The
NIT, issued by a Transmission JV/Consortium Agreement shall explicitly
Utility or major industry. state that each partner assumes full
responsibility for the acts, omissions,
(b) Erection Partner defaults,and liabilities of the other
Requirements: partner(s), and that GETCO shall be
The other partner of the entitled to enforce the Contract against
JV/Consortium must have any or all partners
experience in erection of the individually or collectively at its sole
required cable systems, as discretion, failing which the bid from the
defined under Route-1 (II) (b), as JV/Consortium shall be deemed non-
follows: responsive and non-compliant and shall
be rejected. Further, and a Joint Deed of
Erection Experience: Erected at Undertaking in favour of GETCO as per
least 20Rkms route length of Annexure-C (SCC) jointly signed by the
cumulatively of 66kV or above partners of the JV shall also be submitted
voltage class XLPE cables during along with its bid. Suitable Power of
last seven (7) years as on the date Attorney/Board Resolution authorizing
of NIT with a Transmission Utility the signatories on behalf of each partner
or major industry. Out of which at shall also be submitted along with the bid.
least one line should of minimum
2km route length. Subletting work (III) The Joint Venture/Consortium shall
experience shall not count unless collectively meet the complete technical
authenticated by owner of the experience requirements as specified
work. under Route-1 in respect of
manufacturing (including supply) and
Performance: At least One (1) 66kV erection of 66kV or above voltage class
or above cable lines supplied and XLPE cables, with each Partner meeting
erected as above shall be in the respective requirements specified
satisfactory operation for not less below.
than One (1) years as on the date
of NIT. (a) OEM Partner Requirements:
(IV) Documentary Evidence: One partner of the JV/Consortium must
be an Original Equipment Manufacturer
Each JV Partner must provide (OEM) with experience in design,
comprehensive documentary manufacturing, and supply of the
evidence in the bid demonstrating required cables, and must meet the
their respective qualifying qualifying requirements as per Route-1
experience: (II) (a), as follows:
OEM Partner: Manufacturing Supply Experience: Cumulatively
credentials, supply certificates, designed, manufactured, type tested and
and performance certificates as supplied a minimum of 50 km length of
specified in clause (III)(a) above 66kV or above voltage class XLPE cable
during the last seven (7) years preceding
Erection Partner: Erection the date of NIT, to one or more
completion certificates and Transmission Utilities or major industries
performance validation as either directly or through subcontractor.
specified in clause (III) (b) above Additionally, out of the aforesaid
cumulatively supplied length, the OEM
Seal & Signature of Bidder
partner shall submit satisfactory
Joint Documentation: Evidence performance certificate(s) evidencing
supporting the performance that a minimum of 10 km length of 66kV
requirement specified in clause or above voltage class XLPE cable has
(III) above been in satisfactory service for a
minimum period of two (2) years as on
the date of NIT, issued by the
2.0 FINANCIAL QUALIFYING Transmission Utility or major industry.
(b) Erection Partner Requirements:
2.1 MAAT (Minimum Average
Annual Turnover) The other partner of the JV/Consortium
must have experience in erection of the
Route -1 & Route -2 :- Bidder’s required cable systems, as defined under
Minimum Average Annual Route-1 (II) (b), as follows:
Turnover (MAAT) for best three
years out of last five financial Erection Experience: Erected at least
years shall not be less than the 20 Rkm route length cumulatively of 66kV
50% of estimated amount of or above voltage class XLPE cables
tender. during the last seven (7) years preceding
the date of NIT with one or more
Route -3 :- Minimum Average Transmission Utilities or major industries.
Annual Turnover (MAAT) of the Out of which at least one line should of
consortium/ Joint Venture (JV) minimum 2km route length. Subletting
company added together for best work experience shall not be counted
three years out of last five unless authenticated by order placing
financial years shall not be less authority
than the 50% of the estimated (CE(P&C)/CE(Project)/CE(AM)).
cost. However Minimum Average
Annual Turnover (MAAT) for best (IV) Performance:
three years out of last five
financial years of the lead partner The collective performance requirement
shall be at least 25% of the shall be considered met if:
estimated cost & for each other
partners shall be at least 17% of (a) at least one (1) cable line of 66kV
the estimated cost or above voltage class,
manufactured and supplied by the
Note:- For the purpose of arriving at OEM Partner, has been in
MAAT, Turnover shall be taken as satisfactory operation for not less
revenue from operation than one (1) year as on the date
(excluding GST) as stated in of NIT; and
Financial statement of the bidder,
but excluding other income. (b) at least one (1) cable line of 66kV
or above voltage class has been
2.2 Liquid Assets erected by the Erection Partner,
as per clause (III)(b) above, and
Route -1 & Route -2 :- Last has been in satisfactory operation
Financial Year Liquid Assets for not less than one (1) year as
should not be less than 20% of on the date of NIT,
estimated cost of tender.
wherein, the cable line(s) referred to in
Route -3 :- Last Financial year liquid (a) and (b) above may relate to the same
asset of the consortium/ Joint project, i.e., where the cable was
Venture (JV) company added manufactured and supplied by the OEM
together should not be less than Partner and erected by the Erection
20% of estimated cost of tender. Partner, or to different projects, with each
However Last Financial Year partner independently executing its
Liquid assets of the lead partner respective scope of supply or erection in
shall be at least 10% of estimated its own project.
Cost of tender and for each other
Seal & Signature of Bidder
partners shall be at least 7% of (V) Documentary Evidence:
estimated cost of tender.
The JV bidder and each JV Partner must
Note: For the purpose of arriving at provide comprehensive documentary
Liquid Assets Current Assets evidence in the bid demonstrating their
Less Inventories shall be respective qualifying experience:
OEM Partner: Manufacturing
2.3 Net-Worth credentials, supply certificates,
and performance certificates in
Bidder’s Networth for last Financial support of the requirements
Year should be positive including specified in clause (III)(a) and
all JV Partners clause (IV)(a) above;
Note: Net Worth means Paid-up Erection Partner: Erection
Share Capital, Share Application completion certificates and
Money pending allotment and performance certificates in
Reserves & Surplus less support of the requirements
Accumulated Losses and specified in clause (III)(b) and
Deferred revenue clause (IV)(b) above; and
expenditure/Miscellaneous
Expenses to the extent not Same-project evidence: Where
Written Off. the cable line(s) relied upon under
clause (IV) relate to the same
Reserves and Surplus to be project, documentary evidence
considered for the purpose of net establishing that the cable on that
worth shall be all reserves created project was manufactured and
out of the profits and securities supplied by the OEM Partner and
premium account but shall not erected by the Erection Partner.
include reserves created out of
revaluation of assets, write backNote: To have clarity to all bidders
of depreciation and
participating through all above routes i.e.
amalgamation. Route-1, Route-2 & Route-3- “In the
Share Application Money pending event of a Joint Venture (JV) between the
allotment will be considered onlyOEM and the Agency, the OEM shall be
if it is in respect of shares to be
responsible for the supply of cables,
allotted. while the Agency shall be responsible for
cable laying, erection, installation, and
Bidder to submit the following related execution activities at site.”----
documents in support of meeting Bidders past experience will be
financial qualifying criteria: considered accordingly.
1. CA Certificate with valid UDIN 2.0 FINANCIAL POSITION
Number failing which certificate REQUIREMENTS:
shall not be considered for the
purpose of evaluation and 2.1 MAAT (Minimum Average Annual
Audited Balance Sheet and Profit Turnover)
& Loss account along with the
schedules referred therein and Route -1 & Route -2 :- Bidder’s
the Auditor’s Report for the Minimum Average Annual Turnover
preceding five financial years, in (MAAT) for best three years out of
line with one of the following last five financial years shall not be
less than the 50% of estimated
2. In case last financial year’s closing amount of tender.
date was within 6 months prior to
bid due date and audited Balance Route -3 :- Minimum Average
Sheet and Profit & Loss account Annual Turnover (MAAT) of the
of last financial year are not consortium/ Joint Venture (JV)
available, bidder has the option to company added together for best
Seal & Signature of Bidder
submit the financial details of five three years out of last five financial
previous years immediately prior years shall not be less than the 50%
to the last financial year. For of the estimated cost.However
example, in case bid due date is Minimum Average Annual Turnover
up to 30th September and (MAAT) for best three years out of
financial details of immediate last five financial years of the lead
preceding financial years (year partner shall be at least 25% of the
ending 31st March of same year) estimated cost & for each other
are not available, the financial partners shall be at least 17% of the
details of the five previous years estimated cost.
immediately prior to the last
financial year may be submitted. Note:- For the purpose of arriving at
MAAT, Turnover shall be taken as
3. Otherwise it is compulsory to revenue from operation (excluding
submit the financial details of GST) as stated in Financial
immediate preceding five financial statement of the bidder, but
years. excluding other income.
4. In case bidder is a holding
company, the Financial Position 2.2 Liquid Assets
criteria referred to in Financial
Qualification criteria shall be that Route -1 & Route -2 :- Last
of holding company only (i.e. Financial Year Liquid Assets should
excluding its subsidiary / group not be less than 20% of estimated
companies). In case bidder is a cost of tender.
subsidiary of a holding company,
the Financial Position criteria Route -3 :- Last Financial year liquid
referred to above shall be that of asset of the consortium/ Joint
subsidiary company only (i.e. Venture (JV) company added
excluding its holding company). together should not be less than 20%
of estimated cost of tender. However
5. In case the date of constitution / Last Financial Year Liquid assets of
incorporation of bidder is less the lead partner shall be at least 10%
than five years old the MAAT in of estimated Cost of tender and for
respect of the completed financial each other partners shall be at least
year after the date of constitution 7% of estimated cost of tender.
shall be taken into account.
Provided further that the date of Note: For the purpose of arriving at
constitution / incorporation of the Liquid Assets Current Assets Less
bidder shall not be less than one Inventories shall be considered.
year old and audited financial
statements of at least one 2.3 Net-Worth
completed financial year is
available. Bidder’s Networth for last Financial
Year should be positive including all
Note: Net Worth means Paid-up
Share Capital, Share Application
Money pending allotment and
Reserves & Surplus less
Accumulated Losses and Deferred
revenue expenditure/Miscellaneous
Expenses to the extent not Written
Reserves and Surplus to be
considered for the purpose of net
worth shall be all reserves
created out of the profits and
securities premium account but
Seal & Signature of Bidder
shall not include reserves created
out of revaluation of assets, write
back of depreciation and
Share Application Money pending
allotment will be considered only
if it is in respect of shares to be
Bidder to submit the following documents
in support of meeting financial qualifying
1. CA Certificate with valid UDIN Number
failing which certificate shall not be
considered for the purpose of evaluation
and Audited Balance Sheet and Profit &
Loss account along with the schedules
referred therein and the Auditor’s Report
for the preceding five financial years, in
line with one of the following
2. In case last financial year’s closing
date was within 6 months prior to bid due
date and audited Balance Sheet and
Profit & Loss account of last financial
year are not available, bidder has the
option to submit the financial details of
five previous years immediately prior to
the last financial year. For example, in
case bid due date is up to 30th September
and financial details of immediate
preceding financial years (year ending
31st March of same year) are not
available, the financial details of the five
previous years immediately prior to the
last financial year may be submitted.
3. Otherwise it is compulsory to submit
the financial details of immediate
preceding five financial years.
4. In case bidder is a holding company,
the Financial Position criteria referred to
in Financial Qualification criteria shall be
that of holding company only (i.e.
excluding its subsidiary / group
companies). In case bidder is a
subsidiary of a holding company, the
Financial Position criteria referred to
above shall be that of subsidiary
company only (i.e. excluding its holding
5. In case the date of constitution /
incorporation of bidder is less than five
years old the MAAT in respect of the
completed financial year after the date of
constitution shall be taken into account.
Provided further that the date of
Seal & Signature of Bidder
constitution / incorporation of the bidder
shall not be less than one year old and
audited financial statements of at least
one completed financial year is available.
5. Part –I 6.0 Additional Documents: 6.0 Additional Documents:
Special Apart from various documents to Apart from various documents to be
Conditions be furnished along with the Bid as furnished along with the Bid as
of Contract/ required in the GCC and ECC, the required in the GCC and ECC, the
Clause 6.0 following documents/details are to following documents/details are to be
and its sub- be furnished by the Bidder: furnished by the Bidder:
clauses 1. GST Registration No. date/ 1. GST Registration No. date/
issuing authority. issuing authority.
2. Regn. No. under Shops & 2. Regn. No. under Shops & Estt.
Estt. Act/ issuing authority Act/ issuing authority
3. Details of Partners/Directors of 3. Details of Partners/Directors of
the Firm/Company. the Firm/Company.
4. Experience Record and 4. Experience Record and details of
orders pending / executed for
details of orders pending / various utilities
executed for various utilities
5. Last five years Audited Accounts
5. Last five years Audited
6. Detail of Manufacturing
Accounts /Fabrication facilities if applicable
6. Detail of Manufacturing Factory Registration/license details
/Fabrication facilities if if applicable
7. Factory Registration/license
details if applicable
8. Solvency certificate from
Bank (up to 20 % of Bid value)
6. Part –I 41.0 PENALTY FOR DELAY: 41.0 LIQUIDATED DAMAGES (LD)
(SCC)/ FOR DELAY:
Conditions 41.1 The tenderer should note that 41.1 The tenderer should note that
of Contract/ the completion time allowed for the completion time allowed for
Clause 41.0 carrying out the work should be carrying out the work should be
and its sub- strictly observed. Any delay that
strictly observed. Any delay that may
clauses may take place in supply, erection
and civil beyond Contractual take place in achieving Completion of
period stated shall be subject to the works beyond Contractual Time of
the penalty at the rate of ½ % per Completion in the Contract shall be
week or part there of plus GST as subject to Liquidated Damages (LD),
applicable on delayed portion, with and not by way of penalty, at the rate
a ceiling of 10 % of the total of ½ % of the Contract Price plus GST
contract value plus GST as
as applicable, per week or part
applicable. For calculating the
delayed portion date of actual thereof of the delay subject to a
receipt of material at store shall be ceiling of 10% (ten percent) of the
considered. Contract Price plus GST as
Seal & Signature of Bidder
41.2 The penalty plus GST as 41.2 The penalty plus GST as
applicable will be deducted from applicable will be deducted from bills
bills payable either against this payable either against this contract or
contract or from any Bank from any Bank Guarantee or any
Guarantee or any other amount other amount payable under any
payable under any other contract other contract with the GETCO.
with the GETCO.
41.3 In cases where the Completion
41.3 In event of failure of the of the works/ along with supplies
Contractor to pay the amount of
extend beyond the contractual
Penalty as demanded, the Owner
shall be entitled to deduct the completion period, without prejudice
amount of Penalty for delay from to any other right that it may have
the amounts payable to the under the Contract or in law, the Owner
Contractors under any bills shall be entitled to deduct the amount of
raised under this contract or any LD from the amounts payable to the
other amount payable under any Contractors under any bills raised under
other contract with the GUVNL this Contract or any other amount payable
and its Subsidiary companies under any other contract with the GUVNL
i.e. GETCO, GUVNL, GSECL, and its Subsidiary companies i.e. GETCO,
MGVCL, DGVCL, PGVCL, GUVNL, GSECL, MGVCL, DGVCL, PGVCL,
UGCVL. It is permissible for the UGCVL. It is permissible for the Owner
Owner to adjust the amount of to adjust the amount of LD against
Penalty of delay against any Bank any Bank Guarantee furnished by the
Guarantee furnished by the Contractor under this contract or any
Contractor under this contract or other contract with GUVNL and/or its
any other contract with GUVNL
subsidiary companies.
and/or its subsidiary companies.
41.3 Notwithstanding the provision of
Clause 10.2, if so requested by the
Contractor, amount from the RA bills,
pending settlement of Liquidated
Damages (LD), shall not be withheld/
retained by the Owner, if adequate
retention payment [over and above
security deposit/ Contract
Performance Guarantee (CPG)]
remains to be released as per
Contract. In case, it is not so, it shall
be examined by the Owner whether
BGs/other securities (excluding
CPG/Security Deposit) furnished by
the Contractor are available with
GETCO, which have partly or fully
served their purpose, and can
therefore be utilized by GETCO to
recover LD, if finally levied. If
available, it will be further checked
whether the contractor is willing to
furnish a suitable undertaking
Seal & Signature of Bidder
authorizing GETCO to retain those
BGs/security (for such value which
along with retention payments
remaining with GETCO is considered
to be sufficient to take care of maximum
leviable LD) to be kept valid till 6 months
beyond the anticipated completion of the
works/ supplies under the Contract. If the
Contractor requests and gives the
undertaking as above and validity of BG is
suitably extended wherever required, amount
from RA bills, pending settlement of LD, shall
not be withheld/ retained on account of LD.
Seal & Signature of Bidder
BANK GUARANTEE FORM FOR ADVANCE PAYMENT
(For the purpose of verification/confirmation of this Bank Guarantee by the GETCO, the
Bank shall indicate 2 official email ids of the authorized signatories from Issuing Branch
and also of the designated higher office (Corporate Office, Zonal Office etc) in the
covering letter of the Bank forwarding the Bank Guarantee.)
Bank Guarantee No. …………………… Date...................
…………..[Name of Contract]…………………….
To: [Name and address of the Employer/ Owner]
Dear Ladies and/or Gentlemen,
We refer to the Contract ("the Contract") vide Letter of Award issued on ............ (insert date of
the letter of award)….by you (the Employer/ Owner) to M/s ................. (Name of Contractor)
signed on ..............(insert date of the Contract)…..... between you and M/s ................. (Name of
Contractor) ..................,
having its Principal place of business at ………....(Address of Contractor) ...............................
and Registered Office at ………....(Registered address of Contractor)
…….................….. (Indicate brief scope of work) ............................... for the complete execution
of the …… (insert name of Package along with name of the Project)……..
Whereas, in accordance with the terms of the said Contract, the Employer has agreed to pay or
cause to be paid to the Contractor an interest bearing Advance Payment against furnishing of
an irrevocable bank guarantee for an amount of ………………………..(Amount in figures and
words) ……………which is equal to [{110% (one hundred ten percent) of the amount of
Advance} Plus {amount of GST reimbursable on Advance as per the Proforma invoice, if
By this letter we, the undersigned, ………(insert name & address of the issuing bank) ………, a
Bank (which expression shall include its successors, administrators, executors and assigns)
organized under the laws of .................................... and having its Registered/Head Office at
…..…….(insert address of registered office of the bank)……..... do hereby irrevocably guarantee
repayment of ………….(Amount of the bank guarantee in figures and words)…………… upon
the first demand of the Employer without cavil or argument in the event that the Contractor fails
to commence or fulfill its obligations under the terms of the said Contract for reasons
Provided always that the Bank's obligation shall be limited to the amount of this Bank guarantee
or an amount equal to the outstanding balance of the Advance Payment and the accrued interest
on the Advance Payment, taking into account such amounts, which have been repaid by the
Seal & Signature of Bidder
Contractor from time to time in accordance with the terms of payment of the said Contract, as
certified by you.
This Guarantee shall remain in full force from the date upon which the said Advance Payment
is received by the Contractor up to ninety (90) days beyond the date on which the entire Advance
Payment along with the accrued interest if any due thereon has been fully adjusted in terms of
the Contract i.e., up to ninety (90) days beyond the date of Completion of the Facilities under
the Contract. This Guarantee may be extended from time to time, as may be desired by M/s.
……………………….. on whose behalf this Guarantee has been issued.
Any claims to be made under this Guarantee must be received by the Bank during its period of
validity, i.e. upto ninety (90) days beyond the date of Completion of the Facilities by the Employer
i.e. upto and inclusive of ……………. (dd/mm/yy).
Notwithstanding anything contained herein:
1. Our liability under this Bank Guarantee shall not exceed _________ (value in
2. This Bank Guarantee shall be valid upto ________(validity date)__________.
3. We are liable to pay the guaranteed amount or any part thereof under this Bank
Guarantee only & only if we receive a written claim or demand on or before ________
(validity date) __________.
For and on behalf of the Bank
[Signature of the authorised signatory(ies)]
Designation_______________________
Contact Number(s): Tel.______________Mobile______________
Common Seal of the Bank______________________
Contact Number(s): Tel.______________Mobile______________
Seal & Signature of Bidder
1. For the purpose of executing the Bank Guarantee, the non-judicial stamp papers of
appropriate value shall be purchased in the name of Bank who issues the ‘Bank
2. The Bank Guarantee shall be signed on all the pages by the Bank Authorities indicating
their POA nos. and should invariably be witnessed.
3. The Bank Guarantee should be in accordance with the proforma as provided.
However, in case the issuing bank insists for additional paragraph regarding
applicability of ICC publication No: 758, the following may be added at the end of the
proforma of the Bank Guarantee [i.e., end paragraph of the Bank Guarantee
preceding the signature(s) of the issuing authority(ies) of the Bank Guarantee]:
“This Guarantee is subject to Uniform Rules for Demand Guarantee, ICC
publication No. 758 except that article 15(a) is hereby excluded.”
Seal & Signature of Bidder
Sub: Supply, Laying, Erection, Testing and Commissioning of 66kV,1CX630
sqmm XLPE Cable with Poly.Al. /Aluminum construction on EPC basis Various
lines under Bharuch Circle.
Tender no: ACE(P&C)/Contract/E-513/UG/66kV/S&L,E
Note: Being an EPC contract, multiple activities are involved starting from engineering
to commissioning of project. Agency will submit L2 schedule by identifying actual risk
involved within project with prioritization, assessment and mitigation plan to GETCO.
Hence it is proposed to continue submission of L2 schedule by agency to GETCO during
Kick off meeting.
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contract/E-513/UG/66kV/S&L,E
Sub: Supply, Laying, Erection, Testing and Commissioning of 66kV,1CX630 sqmm XLPE
Cable with Poly.Al. /Aluminum construction on EPC basis Various lines under Bharuch
Option for Initial Advance (either Interest Bearing Initial Advance of No Initial Advance or No
Initial Advance).
Additional Chief Engineer (Procurement & Contracts)
Gujarat Energy Transmission Co. Ltd.,
Corporate office,
I. We have read the provision in the Bidding Documents regarding furnishing the option for
advance payment. Accordingly, as per clause GCC 47.1.1 (For Supply) and GCC 47.2.1 (b)
(For Erection) provided in Amendment-I of the Bidding Documents, we hereby confirm to opt
Interest Bearing Initial Advance:
Supply Portion: (Ref GCC 47.1.1) *
Erection Portion: (Ref GCC 47.2.1 (b)) *
* ‘Yes’ or ‘No’ to be filled up by the Bidder. ‘Yes” shall mean that Bidder has opted for the Interest
Bearing Advance and ‘No’ shall mean that Bidder has not opted for the Interest Bearing Advance.
If nothing is mentioned, it shall mean that Bidder has not opted for the Interest Bearing Advance.
(Name of Authorized Signatory of Bidder)
Seal & Signature of Bidder
Specification No: ACE(P&C)/Contract/E-513/UG/66kV/S&L,E
Sub: “Supply, Laying, Erection, Testing and Commissioning of 66kV,1CX630
sqmm XLPE Cable with Poly.Al. /Aluminum construction on EPC basis Various
lines under Bharuch Circle.”.
In connection with above subject, I / we confirm that our firm is not declared in NCLT
under Insolvency & Bankruptcy Code. Further, I / we also agree that, if any found NCLT
under Insolvency & Bankruptcy Code, the offer shall be out rightly rejected without
assigning any reason thereof.
Signature of Authorized
Representative of Company/Agency
Name of bidder Company
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20. EMD BG Format.pdf
2. Amd -I Part-I Tender Spec 66kV UG_Bharuch Circle E-513.pdf
4. 66 kv MOC 3plus1 29.10.2025 R4.pdf
5. 02_TOWER MATERIAL-66KV LINE-PANTHER.pdf
6. 66KV MOC 6plus1 DT. 29.10.25 R3.pdf
7. 66KV MOC 2plus1 DT. 29.10.25 R2.pdf
8. 66KV MOC 2x6plus0 DT. 29.10.25 R2.pdf
9. 66 KV LA R6 June 22.pdf
10. 66KV 630 SQ MM - ALUMINUM CORRUGATED-R5.pdf
11. 66KV 630 SQ MM 1C POLY AL POLY-R4 - Print Copy 08.07.22.pdf
12. 66KV CABLE TRENCH APPROVED DRAWING 10.04.19.pdf
13. G.I. EARTHING STRIPS.PDF
14. MOC 66 kV cable 13.01.22 CE(Project) letter.pdf
15. Notes for FOAC laying .pdf
16. OFC Underground cable Manhole Chamber.pdf
17. Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
18. TS LAYING CABLE 66KV R2 new - Final.pdf
19. BoQ Supply-Erection for reference only.pdf
20. EMD BG Format.pdf
21. ONLINE SCHEDULE – QR – E-513.pdf
22. ONLINE SCHEDULE – TECH – E-513.pdf
23. SD cum PBG Format.pdf
24. MAAT LA Networth Form.pdf
25. Form of LD undertaking 1A.pdf
26. Form of LD undertaking 1B.pdf
27. Annexure-B.pdf
28. Annexure-C.pdf
3. Tender Notice-E-513 66kV UG_Bharuch Circle.pdf
1. Tender Specification Part-I 66kV UG_Bharuch Circle E-513.pdf
29. Relationship clause Circular.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .