| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.4 L+₹2.0 L (11.8%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Dilu K Johnson, D K Constructions L1 | Johnson Sebastian L2 |
|---|---|---|---|---|---|
| 1.00Appendix A | |||||
| 1.00 | OD10148/2025-2026: Labor charges towards watching and maintaining the bund during season including operating of the shutters of the sluice as directed by the departmental officers at site. | 210 | each | 1,050 ₹2,20,500 Lowest | 1,200 ₹2,52,000 |
| 1.00 | OD10150/2025-2026::Supplying and stacking 20mm broken stone filled empty cement bag in position under
water including all cost of materials and labour charges for filling ,stiching with country twine and
conveying, laying, engagging divers and maintaining the same etc. as per directions of the departmental
officers at site | 876 | each | 95 ₹83,220 Lowest | 120 ₹1,05,120 |
| 1.00 | OD10152/2025-2026: :Supplying and stacking earth filled empty cement bag in position under water
including all cost of materials and labor charges for filling ,stitching with country twine and conveying,
laying, engaging divers and maintaining the same etc. as per directions of the departmental officers at site. | 16,983 | each | 68 ₹11,54,844 Lowest | 75 ₹12,73,725 |
| 1.00 | OD10149/2025-2026::Engaging labour for removing the bund after completion | 60 | each | 1,050 ₹63,000 Lowest | 1,200 ₹72,000 |
| 1.00 | OD32679/2025-2026:Shutter for check dams- Supplying and providing Anjily wood shutter planks 5cm thick including cost of materials and labour charges etc complete. (can be used for 4 times) | 1,000 | cud m | 80 ₹80,000 Lowest | 95 ₹95,000 |
| 1.01 | 13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. | 50.8 | sqm | 60 ₹3,048 Lowest | 70 ₹3,556 |
| 1.01 | OD10147/2025-2026:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 143.63 | sqm | 230 ₹33,034.9 Lowest | 250 ₹35,907.5 |
| 1.01 | OD10151/2025-2026:Engaging labour for placing and removing the bund from the vent way, removing and placing the wooden planks and shutterin and from the grooves | 39 | each | 1,050 ₹40,950 Lowest | 1,100 ₹42,900 |
| 1.01 | OD10153/2025-2026:Engaging labour for doing skilled work in emergency situations for removing any logs or blocks including all accessories and equipment as directed by the departmental officers in charge. | 60 | Day | 900 ₹54,000 Lowest | 950 ₹57,000 |
Tender Value
₹18.4 L
EMD Value
₹46,021
Closing Date
29 Oct 2025, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Minor Irrigation division Ernakulam
Annual maintenance of Cheriyathekkanam bund
2025_Irrig_813275_1
EE/MIDVN/EKM/12/ET/2025-26/ST
Open Tender
Civil Works - Others
Item Rate
240 days
Kunnukara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹46,021
Yes
24 Dec 2025
22 Oct 2025
30 Oct 2025
22 Oct 2025
29 Oct 2025
22 Oct 2025
Amount
Appendix A
OD10148/2025-2026: Labor charges towards watching and maintaining the bund during season including operating of the shutters of the sluice as directed by the departmental officers at site.
OD10150/2025-2026::Supplying and stacking 20mm broken stone filled empty cement bag in position under water including all cost of materials and labour charges for filling ,stiching with country twine and conveying, laying, engagging divers and maintaining the same etc. as per directions of the departmental officers at site
OD10152/2025-2026: :Supplying and stacking earth filled empty cement bag in position under water including all cost of materials and labor charges for filling ,stitching with country twine and conveying, laying, engaging divers and maintaining the same etc. as per directions of the departmental officers at site.
OD10149/2025-2026::Engaging labour for removing the bund after completion
OD32679/2025-2026:Shutter for check dams- Supplying and providing Anjily wood shutter planks 5cm thick including cost of materials and labour charges etc complete. (can be used for 4 times)
13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
OD10147/2025-2026:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
OD10151/2025-2026:Engaging labour for placing and removing the bund from the vent way, removing and placing the wooden planks and shutterin and from the grooves
OD10153/2025-2026:Engaging labour for doing skilled work in emergency situations for removing any logs or blocks including all accessories and equipment as directed by the departmental officers in charge.
Johnson Sebastian (BID ID -2420304)
Bidder Name
Johnson Sebastian
Dilu K Johnson, D K Constructions
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1359571.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewsbd.pdf
Tender Documents • 2.07 MB
BOQ_1359571.xls
BOQ • 0.23 MB
Epaymentrequisition.pdf
Other Document • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .