Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance PLOT NO 18 G I D C INDUSTRIAL ESTATE SAVLI ALINDRA VADODARA GUJARAT 391775 | VADODARA | GUJARAT | 391775 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
20 Jun 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Admiral Superintendent
Naval Ship Repair Yard Naval Base Karwar 581308
UNDERTAKING DEFECT RECTIFICATION ON BOTH MAIN ENGINE ONBOARD IN SHIP
2023_NAVY_603260_1
REG/1001/BME-23
Single
Marine Services
Item Rate
90 days
NSRY, KARWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.5 L
Yes
21 Jun 2023
14 Jun 2023
21 Jun 2023
14 Jun 2023
20 Jun 2023
15 Jun 2023
Amount
SERVICES
Remove, Clean, Inspect and re – install. De carbonizing of all unit combustion space & hydro pressure test of all unit Cylinder Head.
Remove of salt deposits in cylinder head air inlet passage and cleaning of exhaust ports.
Measure valve clearance. Check valve rotation during engine operation
Maintenance: Remove inlet valve of cylinder heads, check valve seats and reinstall.
Re-conditioning of valve and valve seat, seating surface by lapping of machining as required.
All piston pull, inspect, clean and measured the ring grooves. Re-install it by using new comp and oil rings.
Cleaning of cylinder liner combustion area and running surface.
Inspection and Maintenance: Measurement of liner bore and honing of all liners insitu.
Remove of salt deposits, manual cleaning of scavenging space with extracting liner. Any kind of painting & primer coating required in customer scope.
Inspection and cleaning of condensate drain valve after air coolers and all units.
Remove all cylinder head safety valve, clean and check opening pressure, adjust if required. Re-install.
Measure and record crank web deflection.
Visual inspection of lub oil discharge from piston, connecting rod and main bearings, camshaft bearing and valve gear.
Rocker arm visual inspection of all levers and screw connections. Removal and shifting of all rocker arm housing, installation back.
Remove one Injection Pump, Check and reinstall.
Inspect baffle screws, fuel cams, drive rollers and guides
Packing & Transportation for workshop, to & fro, if required.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .