Tender Value
₹17.2 L
EMD Value
₹34,440
Closing Date
28 Sept 2026, 4:00 pm3d left
Executive Engineer
PWD RnB Division Rajouri
Augementation and Renovation of Infrastructure and Tourism Office building at Chenani Bagla
2026_PWDJK_325240_3
e NIT NO 91 2026-27 Dated 18-09-2026
Open Tender
Civil Works
Percentage
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer
₹34,440
19 Sept 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm | 33.82 | Sqm | 57 | ₹1,927.74 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar | 5.66 | Cum | 1,458.45 | ₹8,254.83 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge. All kinds of soil : | 10 | Cum | 576.45 | ₹5,764.5 |
| 4 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 3 | Cum | 256.85 | ₹770.55 |
| 5 | Providing and laying in position Cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) | - | Cum | 4,826.5 | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 3.5 | Cum | 5,733.6 | ₹20,067.6 |
| 7 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1
cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 2.16 | Sqm | 416.5 | ₹899.64 |
| 8 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 11.55 | cum | 7,571.55 | ₹87,451.4 |
| 9 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 11.55 | Cum | 1,455.65 | ₹16,812.76 |
| 10 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors, balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering , all work upto floor V level | - | Cum | 9,821.85 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1098565.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .