Loading…
Loading…
Tender Value
₹76.2 L
EMD Value
₹77,000
Closing Date
21 Aug 2026, 6:00 pmClosed
Office of The Executive Engineer, Bhavnagar Irrigation Project Division
Consultancy Services to Examine Techno-Economic Feasibility and Detail Field Geological Survey, Planning, Designing and Preparation & Submission of Detail Estimate with Preparation of DTP and Evolution of PQ and Price Bid for Connecting Check Dam, Pond and Other Water Body in the Near Vicinity from Scour Valve for Water Distribution from Link-2 & 4 Pipeline of Sauni Yojana in Saurashtra Region of Gujarat State (For Link-2 & 4 for 3 to 7 km).
331533
03/2026-27
Open
Consultancy Services
Works
Bhavnagar
12 documents required · 9 mandatory · 3 optional
₹2,400
Executive Engineer, Bhavnagar Irrigation Project Division, Bhavnagar
₹77,000
5 Aug 2026
5 Aug 2026
5 Aug 2026
21 Aug 2026
5 Aug 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
e Description of Item (with brief Rate
m specification and reference to Quantity Unit In Amount
N book of specifications) figures
Objective paper study to decide
alternative alignments considering
economy and techanical feasibility.
Detailed paper study including
field survey on each altrnative &
taking centre line levels @ 30 mt.
interval, including jungle cutting,
fixing centre line stones @ 300 mt.
interval, TBM @ 1000 mt. interval,
PBM @ 2000 mt. interval and
recommend most economical &
feasible alignment etc. Item
includes stone mark with oil
painting complete. Detailed
engineering and geological survey,
preliminary design of all
components and required
structures and pumping
arrangement, crossings, approach
1 roads & quarters etc. and 410 Km 18596.15
preparing preliminary plans and
estimates link wise for
recommended alignment. Detailed
field survey. Discussion and
presentation including final
presentation, Remedial measures
for the problems if any and
submission of final reports
including submission of decided
package vise detailed design for
pipe,Structures, crossings, etc and
submission of Link vise & Package
vise Detailed plans , estimates,
DTP and Final Tender Volumes in
editable format in soft copy as well
as 5-Hard copies, along with
Preparation of schedule of
implementation and construction
activities. etc.comp.
I/We am/are willing to carry out the work at… ....................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
PAYMENT SHALL BE MADE ACCORDING TO WORK DONE OF ACTIVITY AS BELOW
Payment Schedule
Sr. Activity Payment to be released
The objective paper study to decide preliminary alternative
economical route with technical feasibility & economical -
viability to feed various existing check Dams/ ponds/ natural
depressions/ artificial depressions located up to 7 km from
the existing Scour Valves.
Detailed paper study including field survey on each altrnative
& taking center line levels @ 30 mt. interval, including jungle
cutting, fixing center line stones @ 300 mt. interval, TBM @ 25% of Unit rate
1000 mt. interval, PBM @ 2000 mt. interval for recommend
most economical & feasible alignment etc. Item includes
stone mark with oil painting complete. On TBM & PBM
Stones and mark with oil paint and recommended most
economical & feasible alignment etc Complete.
Detailed engineering and geological survey, preliminary
design of all components and required structures and 60% of Unit rate
pumping arrangement, crossings, approach roads & quarters
etc. and preparing preliminary plans and estimates Package
wise for recommended alignment. Detailed field survey.
Discussion and presentation including final presentation,
Remedial measures for the problems if any and submission
of final reports including submission of decided package
vise detailed design for pipe, Structures, crossings, etc and
submission of Link vise & Package vise Detailed plans
estimates, DTP and Final Tender Volumes in editable
15% of Unit rate
format in soft copy as well as 5-Hard copies, along with
Preparation of schedule of implementation and
construction activities. etc.comp. Submission of Package
wise R.O.U. statement, Estimates and DTP and Final
Tender Volumes of TPI in editable format in soft copy as
well as five hard copies along with evaluation, Preparation
of schedule of implementation and construction activities.
(1) Payment for Consultant will be done according to above mention payment schedule, according to
percentage of Quantity of Work completed & submitted.
(2) No interest shall be paid for any delay in payment to consultant by client.
Mode of Billing and Payments
Payments will be made by the Client to the consultant as per above Payment Schedule.
6.5 Withdrawal of Work:-
All Activities shall be carried out when the Client permits the qualified Consultant to “Go Ahead” with
it. In case in-between the Client decides to withdraw the remaining activities and further activities are
not considered, the Consultant is liable to receive at the maximum, only the admissible proportion of
the Price Quoted by the Consultant. The decision of the Client is final and binding to the Consultant.
In such case, the acceptance of final deliverables and release of final payments of the activities done
shall end the contract. Consultant can’t raise extra bills other than the admissible amount for reasons
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
Deputy Executive Engineer Executive Engineer
Irrigation Project Sub Division Bhavnagar Irrigation Project Division
Signature of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Consultancy Services 3-7 Km Survey.pdf
Technical Specification.pdf
BOQ.pdf
Tender notice No.3-2026-27.pdf
Updated Section 5 and 12.pdf
CORRIGENDUM
Corrigendum-1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .