Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.5 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹9.5 L+₹454.30 (0.05%)Rejected-Finance | 2 | Rejected-Finance L2 Bidder |
| Sl No | Description | Qty | Unit | Keshav Ramchandra Raikar L1 | Maulaali Mohammed Tirawali L2 |
|---|---|---|---|---|---|
| 1.00 | (GATE NO.1) Old drum removing with the help of crane, welding and machining as per bush size, alignment of wire rope cable, fabricate drum and refitting. | 1 | Job | 1,75,000 ₹1,75,000 Lowest | 2,00,000 ₹2,00,000 |
| 2.00 | (GATE NO.3 & 5) Aligning of wire rope/cable of spillway gate including removing and refitting of damaged cable for smooth functioning of gate including alignment of gate no. 5 as directed by Engineer in charge. | 2 | Job | 1,75,000 ₹3,50,000 Lowest | 2,06,750 ₹4,13,500 |
| 3.00 | (GATE NO.6) Providing supporting structure for rope drum hoist required for operating spillway gate No.6 Dismantling wire rope and removing old drum with the help of crane, drum shaft welding and machining as per shaft size. Removing both the old drum brackets which are broken/bend. Fabricate new drum holding brackets as per sample, refitting , including material, labour and aligning of spillway gate. | 1 | Job | 2,83,115 ₹2,83,115 | 1,95,000 ₹1,95,000 Lowest |
Tender Value
₹9.1 L
EMD Value
₹18,175
Closing Date
24 Mar 2025, 4:00 pmClosed
EE III,
EE, WD III, WRD, Ponda Goa
Providing supporting structure for rope drum hoist and aligning of wire rope cable for smooth functioning of Opa barrage spillway gates.
2025_WRD_20512_1
10/24-25/ACT/WDIII/WRD/754/s1
Open Tender
Miscellaneous Works
Item Rate
60 days
Ponda
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹18,175
20 Aug 2025
10 Mar 2025
25 Mar 2025
10 Mar 2025
24 Mar 2025
10 Mar 2025
Amount
(GATE NO.1) Old drum removing with the help of crane, welding and machining as per bush size, alignment of wire rope cable, fabricate drum and refitting.
(GATE NO.3 & 5) Aligning of wire rope/cable of spillway gate including removing and refitting of damaged cable for smooth functioning of gate including alignment of gate no. 5 as directed by Engineer in charge.
(GATE NO.6) Providing supporting structure for rope drum hoist required for operating spillway gate No.6 Dismantling wire rope and removing old drum with the help of crane, drum shaft welding and machining as per shaft size. Removing both the old drum brackets which are broken/bend. Fabricate new drum holding brackets as per sample, refitting , including material, labour and aligning of spillway gate.
Maulaali Mohammed Tirawali (BID ID -45568)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .