Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.7 LAdmitted-Fee/PreQual/Technical/Finance 11 103A THINKAL MADATHILPARAMBA KIZHAKKUMMURI P O KOZHIKODE KERALA 673611 | KOZHIKODE | KOZHIKODE | KERALA | 673611 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹11.5 L+₹81,670.29 (7.64%)Admitted-Fee/PreQual/Technical/Finance PANJAMI HOUSE KOOTHALI PERAMBRA POST KOOTHALITHERU KOZHIKODE 673525 | KOZHIKODE | KERALA | 673525 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹11.6 L+₹92,005.11 (8.61%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹11.8 L+₹1.1 L (10.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.6 L
EMD Value
₹32,000
Closing Date
24 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AEE TCSD MEPPAYUR
Office of the Assistant Executive Engineer, TC Sub Division, Meppayur, K.S.E.Board Ltd. Iringath(P.O), Kozhikode -673523, Phone- 9496011033
Interlinking 110KV Substation, Kinalur and 33KV Substation, Balussery - Construction of 33kV yard equipment and structures foundation, trenches etc. at 110kV Substation Kinalur
2026_KSEB_887292_1
TCSDM 04/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
110KV SUBSTATION KINLUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,900
₹32,000
27 Nov 2026
10 Nov 2026
27 Nov 2026
10 Nov 2026
24 Nov 2026
10 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. in All kinds of soil. | 48 | m3 | 236.63 | ₹11,358.47 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. In Ordinary rock | 44 | m3 | 475.67 | ₹20,929.53 |
| 3 | Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials. All kinds of soil | 3.5 | m3 | 120.34 | ₹421.19 |
| 4 | Earth work in excavation Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials. Ordinary or Hard rock | 3.5 | m3 | 215.84 | ₹755.45 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. in All kinds of soil. | 57 | m3 | 330.43 | ₹18,834.3 |
| 6 | Providing and laying in position specified grade of Cement concrete ,excluding the cost of centering, shuttering. All work upto plinth level. 1:3:6(1cement:3 coarse sand:6graded stone aggregate 40mm nominal size) | 14 | m3 | 7,683.02 | ₹1,07,562.3 |
| 7 | Providing and laying in position specified grade of Reinforced Cement concrete, excluding the cost of centering,shuttering,finishing and reinforcement-All work upto plinth level. 1:1.5:3 (1cement:1.5coarse sand:3graded stone aggregate 20mm nominal size) | 36 | m3 | 9,634.13 | ₹3,46,828.81 |
| 8 | Centering and shuttering including strutting,propping etc. and removal of form for foundations ,footings, base of column etc. for mass concrete. | 180 | m2 | 354.69 | ₹63,844.81 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. for walls of cable trench | 154 | m2 | 771.2 | ₹1,18,765.19 |
| 10 | Steel reinforcement for RCC work including strightening,cutting, bending,placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars | 3,000 | kg | 103.26 | ₹3,09,794.4 |
stage.html
html • 0.02 MB
finance_1514263.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
conditions.pdf
Tender Documents • 0.91 MB
GSTSTATUS.pdf
Other Document • 0.13 MB
BOQ_1514263.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .