Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Technical | L1 | Admitted-Technical L1 | |
| 2 | L2₹6.5 L+₹4,768.71 (0.74%)Admitted-Technical | L2 | Admitted-Technical L2 | |
| 3 | L3₹6.6 L+₹21,414 (3.34%)Rejected-Technical | L3 | Rejected-Technical L3 | |
| 4 | L4₹6.6 L+₹23,022.55 (3.59%)Rejected-Technical | L4 | Rejected-Technical L4 | |
| 5 | L5₹6.7 L+₹25,065.31 (3.91%)Rejected-Technical | L5 | Rejected-Technical L5 |
| Sl No | Description | Qty | Unit | RAVEENDRAN A L2 | K.V.JAYAPRAKASH L6 | SAJINI S S L7 | RATHEESH KUMAR R L5 | SELVARAJ A L4 | JULIN GREY P G L8 | PRADEEP.T L10 | BAIJU R.T L1 | MAHESAN P L3 | M DAS L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00ROAD CONCRETING AND SIDE WALL CONSTRUCTION | |||||||||||||
| 1.00 | od1162177/2021_2022 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 55.78 | cum | 207.37 ₹11,566.21 | 330 ₹18,406.41 | 230.74 ₹12,869.98 | 271 ₹15,115.57 | 213.22 ₹11,892.85 | 232.75 ₹12,981.85 | 243.34 ₹13,572.66 | 205.84 ₹11,480.88 Lowest | 212.7 ₹11,863.77 | 234.74 ₹13,093.09 |
| 1.00 | od1162179/2021_2022 : Filling with Quarry Muck<br>Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 12.65 | cum | 673.14 ₹8,515.22 | 790 ₹9,993.5 | 749.02 ₹9,475.1 | 801 ₹10,132.65 | 692.15 ₹8,755.7 | 755.53 ₹9,557.44 | 789.91 ₹9,992.41 | 668.17 ₹8,452.4 Lowest | 690.47 ₹8,734.45 | 762.03 ₹9,639.68 |
| 1.00 | od1202083/2021_2022 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.<br>All kinds of soil | 486.5 | sqm | 14.51 ₹7,058.44 | 14 ₹6,811 Lowest | 16.14 ₹7,852.11 | 20.03 ₹9,744.6 | 14.92 ₹7,257.77 | 16.28 ₹7,922.31 | 17.03 ₹8,282.91 | 14.4 ₹7,006.33 | 14.88 ₹7,239.12 | 16.42 ₹7,988.33 |
| 1.00 | 75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4) | 72.97 | cum | 5,780.55 ₹4,21,835.99 | 5,950 ₹4,34,201.25 | 6,432.2 ₹4,69,389.79 | 5,551 ₹4,05,084.22 Lowest | 5,943.8 ₹4,33,748.95 | 6,488.06 ₹4,73,466.54 | 6,783.34 ₹4,95,014.24 | 5,737.91 ₹4,18,723.84 | 5,929.43 ₹4,32,700.15 | 6,543.92 ₹4,77,542.56 |
| 1.00 | od1217101/2021_2022 : S/F information board 75x60 cm using GI pipe as post and 1 mm thick MS sheet surrounded by MS angles including painting, letterring and fixing in concrete etc. as per the direction of etc. | 1 | each | 2,730.31 ₹2,730.31 | 3,700 ₹3,700 | 3,038.1 ₹3,038.1 | 3,701 ₹3,701 | 2,807.42 ₹2,807.42 | 3,064.49 ₹3,064.49 | 3,203.96 ₹3,203.96 | 2,710.17 ₹2,710.17 Lowest | 2,800.63 ₹2,800.63 | 3,090.87 ₹3,090.87 |
| 2.00SIDE WALL | |||||||||||||
| 2.00 | 11.1.1.1 : Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.I.Ordinary soil(i)Upto 3 m depth | 24 | cum | 371.64 ₹8,919.34 | 400 ₹9,600 | 413.53 ₹9,924.72 | 413 ₹9,912 | 382.13 ₹9,171.23 | 417.13 ₹10,011.02 | 436.11 ₹10,466.63 | 368.9 ₹8,853.54 Lowest | 381.21 ₹9,149.04 | 420.71 ₹10,097.04 |
| 2.00 | 11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I.P.C.C grade M 10(i)Nominal mix 1:3:6 | 4 | cum | 5,316.77 ₹21,267.09 | 6,390 ₹25,560 | 5,916.13 ₹23,664.52 | 6,001 ₹24,004 | 5,466.92 ₹21,867.69 | 5,967.52 ₹23,870.07 | 6,239.1 ₹24,956.41 | 5,277.55 ₹21,110.18 Lowest | 5,453.7 ₹21,814.8 | 6,018.89 ₹24,075.56 |
| 2.00 | 11.4.2.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II.P.C.C grade M 15(i)Nominal mix (1:2.5:5) | 31.5 | cum | 5,221.38 ₹1,64,473.34 | 6,280 ₹1,97,820 | 5,809.98 ₹1,83,014.37 | 5,999 ₹1,88,968.5 | 5,368.83 ₹1,69,118.18 | 5,860.44 ₹1,84,604.02 | 6,127.16 ₹1,93,005.45 | 5,182.85 ₹1,63,259.9 Lowest | 5,355.85 ₹1,68,709.28 | 5,910.9 ₹1,86,193.35 |
Tender Value
₹8.9 L
EMD Value
₹14,000
Closing Date
11 Aug 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Asst Exe Engineer
Nemom Zonal Office TVM Corporation
225 Edayar Kodiyil Kshethram Road Concreting in Thiruvallam ward
2021_LSGD_433080_1
01/AEE/TVCORP/VIZ/225/2021-22
Open Tender
Civil Works - Roads
Item Rate
90 days
Nemom
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,800
Yes
₹14,000
Yes
16 Aug 2021
5 Aug 2021
16 Aug 2021
5 Aug 2021
11 Aug 2021
5 Aug 2021
60 days
stage.html
html • 0.04 MB
tech_eval.pdf
finance_614946.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .