Loading…
Loading…
Tender Value
₹21.2 L
EMD Value
₹21,190
Closing Date
9 Jul 2026, 5:00 pmDue today
Superintending Engineer, RW Division-II, Umerkote
O/o the Superintending Engineer, Rural Works Division-II, Nabarangpur, Umerkote
Beheda Junction to Kurshi via Limaguda_Road_Boxcell Culvert -1X4X2- and Repair of Approach RoadAt 7.90 KM. 7.850 to 7.950
2026_CERWI_133839_1
Online Tender 02 RWD UKT 2026 27
Open Tender
Civil Works - Roads
90 days
Umerkote
2 documents required · 2 mandatory
₹6,000
₹21,190
Yes
30 Jun 2026
30 Jun 2026
10 Jul 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
30 Jun 2026 - 8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge. | 86.71 | cum | 282.88 | ₹24,527.39 |
| 2 | Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 59.61 | cum | 800.16 | ₹47,695.14 |
| 3 | Plain cement concrete M-15 grade in Foundation complete as per drawing and technical specification. | 58 | cum | 5,631.71 | ₹3,26,650.61 |
| 4 | Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical specification. | 0.01 | cum | 0.01 | ₹0 |
| 5 | DEWATERING ( Below bed) | 21.12 | cum | 5,741.57 | ₹1,21,261.85 |
| 6 | SHUTTERING(above bed) | 18.72 | cum | 6,488.66 | ₹1,21,467.66 |
| 7 | R.C.C work of M-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 0.01 | cum | 0.01 | ₹0 |
| 8 | Raft | 18.75 | cum | 7,423 | ₹1,39,181.25 |
| 9 | Deck Slab | 20.35 | cum | 10,843.45 | ₹2,20,664.21 |
| 10 | Rib | 15.34 | cum | 8,941.8 | ₹1,37,144.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 0.48 MB
Tendernotice_1.pdf
PDF • 2.15 MB
BOQ_598968.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid