Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-Finance | ₹3.4 Cr | L1 | Accepted-Finance As per tender 60 percent of work will be awarded to L1 bidder |
| 2 | L2₹2.3 Cr−₹1.1 Cr (33.3%)Accepted-Finance | ₹2.3 Cr−₹1.1 Cr (33.3%) | L2 | Accepted-Finance As per tender remaining 40 percent of work will be awarded to L2 bidder at the rate of quoted rates of L1 bidder |
| 3 | L3₹6.2 Cr+₹2.7 Cr (79.1%)Rejected-Finance | ₹6.2 Cr+₹2.7 Cr (79.1%) | L3 | Rejected-Finance Financially Non Responsive |
| 4 | L4₹6.3 Cr+₹2.8 Cr (82.5%)Rejected-Finance | ₹6.3 Cr+₹2.8 Cr (82.5%) | L4 | Rejected-Finance Financially Non Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not meeting the eligibility conditions as mentioned in ATC/Tender documents. Hence Technically Non-Responsive. |
Tender Value
₹7.6 Cr
EMD Value
₹15.3 L
Closing Date
5 Aug 2025, 3:00 pmClosed
AGM MM
AGM MM O/o CGMT Uttarakhand Dehradun
ADSS/Aerial OFC works for OFC connectivity of BHQs under Amended BharatNet Program in UKD Circle
2025_BSNL_241372_1
ADSS/Aerial OFC works for OFC connectivity of BHQs under Amended BharatNet Program in UKD Circle
Open Tender
OFC Laying Works
Works
150 days
Uttarakhand
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
Yes
AO (Cash) O/o CGMT Uttarakhand BSNL
₹15.3 L
Yes
Dehradun
20 Sept 2025
16 Jul 2025
6 Aug 2025
16 Jul 2025
5 Aug 2025
16 Jul 2025
16 Jul 2025 - 23 Jul 2025
21 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .