| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.3 CrAccepted-AOC | ₹3.3 Cr | 1 | Accepted-AOC Ranking
based on
Combined
Score -1 |
| 2 | 2₹4.1 Cr+₹81.4 L (24.4%)Rejected-AOC 37 INTEC HOUSE SECTOR 44 INSTITUTIONAL AREA GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | ₹4.1 Cr+₹81.4 L (24.4%) | 2 | Rejected-AOC Ranking
based on
Combined
Score -2 |
| 3 | 3₹4.0 Cr+₹68.1 L (20.4%)Rejected-AOC | ₹4.0 Cr+₹68.1 L (20.4%) | 3 | Rejected-AOC Ranking
based on
Combined
Score -3 |
| 4 | Rejected-Technical 227 AJC BOSE ROAD 3RD FLOOR ANANDLOK BUILDING MINTU PARK KOLKATA KOLKATA WEST BENGAL 700020 | KOLKATA | WEST BENGAL | 700020 | - | - | Rejected-Technical Not qualified-technical score below 65. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified. |
| Sl No | Description | Qty | Unit | TQ Cert Services Private Limited L1 | Eka Infra Consultants Pvt Ltd L2 | Tractebel Engineering Private Limited L3 |
|---|---|---|---|---|---|---|
| 1.00Stages of Project | ||||||
| 1.01 | Conditions Precedent Period | 1 | Lump sum | 21,00,000 ₹21,00,000 Lowest | 50,50,000 ₹50,50,000 | 35,00,000 ₹35,00,000 |
| 1.02 | Construction Period | 30 | Per Month | 8,61,180 ₹2,58,35,400 | 8,31,310 ₹2,49,39,300 Lowest | 8,60,000 ₹2,58,00,000 |
| 1.03 | Operation Period | 15 | Per Month | 3,58,177 ₹53,72,655 Lowest | 6,75,000 ₹1,01,25,000 | 8,10,000 ₹1,21,50,000 |
| 2.001. The total professional fee inclusive of all expenses and taxes during Conditions Precedent Period (1.01) and Construction Period (1.02) as estimated under Column 6 above should not exceed Rs 3,00,00,000/- (Rupees Three Crores only), else the Financial Bid will be rejected 2. The professional fee quoted during Conditions Precedent Period is a lump-sum amount payable in milestone linked installments mentioned under Schedule 1: ToR of the RFP. 3. The monthly professional fee quoted during Construction Period shall be payable on monthly basis as mentioned under Schedule 1: ToR of the RFP for a maximum period of 30 months from the date of completion of Conditions Precdent Period Or for actual months of Construction Period in case of early completion of construction. 4. The monthly professional fee quoted during Operation Period shall be payable on monthly basis as mentioned under Schedule 1: ToR of the RFP from the Commercial Operation Date of Project Milestones (mentioned in Concession Agreement) till the expiry of Agreement Period of IMA subject to a mximum period of 15 months. 5. The Concessionaire is allowed to operationalize each of the project components (Student hostel regular, Married student hostel and Executive hostel) as and when it is ready. Hence the scope of services of IMA during operation period will commence for such project components from Commercial Operation Date of these project components along with construction period of other project. components. | ||||||
Tender Value
₹3 Cr
EMD Value
₹3 L
Closing Date
8 Aug 2025, 4:00 pmClosed
The Director
IIM Udaipur
Appointment of Independent Monitoring Agency for Development of Student Infrastructure at IIM Udaipur Campus on PPP mode
2025_IIMU_868371_1
IIMU/PPP/2025-26/02
Open Tender
Miscellaneous Services
Works
1095 days
IIM Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3 L
IIM Udaipur
12 Sept 2025
10 Jul 2025
8 Aug 2025
10 Jul 2025
8 Aug 2025
10 Jul 2025
10 Jul 2025 - 17 Jul 2025
21 Jul 2025
Amount
Stages of Project
Conditions Precedent Period
Construction Period
Operation Period
1. The total professional fee inclusive of all expenses and taxes during Conditions Precedent Period (1.01) and Construction Period (1.02) as estimated under Column 6 above should not exceed Rs 3,00,00,000/- (Rupees Three Crores only), else the Financial Bid will be rejected 2. The professional fee quoted during Conditions Precedent Period is a lump-sum amount payable in milestone linked installments mentioned under Schedule 1: ToR of the RFP. 3. The monthly professional fee quoted during Construction Period shall be payable on monthly basis as mentioned under Schedule 1: ToR of the RFP for a maximum period of 30 months from the date of completion of Conditions Precdent Period Or for actual months of Construction Period in case of early completion of construction. 4. The monthly professional fee quoted during Operation Period shall be payable on monthly basis as mentioned under Schedule 1: ToR of the RFP from the Commercial Operation Date of Project Milestones (mentioned in Concession Agreement) till the expiry of Agreement Period of IMA subject to a mximum period of 15 months. 5. The Concessionaire is allowed to operationalize each of the project components (Student hostel regular, Married student hostel and Executive hostel) as and when it is ready. Hence the scope of services of IMA during operation period will commence for such project components from Commercial Operation Date of these project components along with construction period of other project. components.
Eka Infra Consultants Pvt Ltd (BID ID -3263118)
Tractebel Engineering Private Limited (BID ID -3262456)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .