Tender Value
₹30.1 L
EMD Value
₹30,100
Closing Date
6 Oct 2026, 6:00 pm
Executive Engineer, Public Health Works Division, Vyara.
Work for PVC and DI pipelines shifting of various diameter due to Bridge Demolition And new bridge built up at various place of South Nizar RWSS, Dist. Tapi
327644
E-tender Notice No. 1 of 2026-27
Open
Civil Works - Water Works
Works
Tapi
5 documents required · 5 mandatory
₹1,500
The Executive Engineer, Public Health Works, Division, Vyara
₹30,100
8 Sept 2026
8 Sept 2026
8 Sept 2026
6 Oct 2026
8 Sept 2026
2. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
3. Percentages are indicated against each component of each items specified in Schedule
B, based on the Employer's best appreciation of the value of the component as related
to the total costs of the concerned item as whole A head titled (any other item(s)) is
included in each breakdown of schedule and the tenderer shall at the time of tendering
indicate any additional items which he considers necessary but cannot be covered by
any of the heads indicated in the breakup
4. The percentage breakup as indicated in the Schedule may differ from that corresponding
to the tenderer's scheme and design and he should take this into account while quoting
his lump sum prices for the items specified in Schedule-B
5. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed
and updated periodically with the Employer's Representative. This bill of quantities will
be used for assessment of percentage progress of the component at any stage By
measurement jointly taken by the Employer's Representative and the Contractor,
mutually agreed and entered in the measurement books in the form and by the method
approved by the Employer's Representative and signed jointly by both the parties.
Volume-III, PRICE BID
PAYMENT SCHEDULE
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Ite Percentage Payment to
Description of Items
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
a On receipt of materials on site 70 % of Quoted rate
b On erection 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d After commissioning 5 % of Quoted rate
3 PUMPING STATION/OFFICE BUILDING/PUMP ROOM
a On approval of Designs 2.0 % of Quoted rate
b On completion of Excavation & base slab 18.0 % of Quoted rate
On completion of vertical wall up to plinth
c 20.0 % of Quoted rate
(incl. screen chamber
d Full supporting structure incl. ring beam and top slab 15.0 % of Quoted rate
On completion of pump house incl. fixing doors
e 10.0 % of Quoted rate
f Plastering inside & outside with epoxy paint 10.0 % of Quoted rate
etc (completed with all respects)
g Painting of letters, MS ladder pipe, railing, lighting arrestor and
all miscellaneous items such as snowcem paints in three coats 15 % of Quoted rate
etc. (completed with all respects)
h After Completion 10 % of Quoted rate
4 GROUND (UNDERGROUND) LEVEL SERVICE
RESERVOIRS/SUMPS
a On approval of designs 2 % of Quoted rate
b On completion of excavation and base slab 18 % of Quoted rate
c On completion of vertical wall and braces 20 % of Quoted rate
d Full supporting structure including column, ring beam and 15 % of Quoted rate
completion of top slab / dome
e Plastering inside & outside with epoxy etc. complete 10 % of Quoted rate
Procurement and fixing of inlet, outlet, washout, overflow
f pipes, valves, specials, chambers, lighting arrester conductor 10 % of Quoted rate
and specials at site
Water level indictor, painting of letters, M.S ladder, pipes, railing
and all miscellaneous items such as snowcem paint in three
g coats etc (Completed with all respect) including water tightness 15 % of Quoted rate
h On hydraulic testing 10 % of Quoted rate
Volume-III, PRICE BID
A. B. On submission of Designs 2.5% of Quoted rate
C. D. On approval of Designs 2.5% of Quoted rate
E. F. On Completion of excavation 7.5% of Quoted rate
G. H. On completion of staging height up to reservoir 22.5% of Quoted rate
I. J. On Completion of Floor Reservoir 22.5% of Quoted rate
K. L. On Completion of walls of Reservoir 22.5% of Quoted rate
M. N. On Completion of Roof of reservoir with all related piping
20.0% of Quoted rate
and other works including hydro testing
5B WATER TREATMENT PLANT(CONVENTIONAL )
(I) Site survey and subsoil investigations 1% of Quoted rate
Completion of field surveys and subsoil investigations and de- 25%
mobilization from site of survey team
Submission of surveys and soil investigation reports and 75%
acceptance by the Engineer
(II) Detailed designs and construction documents 2% of Quoted rate
Substantial completion, submission and approval by the Engineer 60%
of the designs, drawings and construction
documents for all major items of work
Submission and approval by the Engineer of the final designs and 40%
construction documents for all remaining and miscellaneous
construction details and working drawings
(III)-a Inlet chamber 2% of Quoted rate
Excavation 5.0%
Works up to Ground Level 10.0%
RCC works up to top including all supply and fixing of 60%
related materials
Finishing all surfaces including painting 15.0%
Hydraulic test 5.0%
Commissioning 5.0%
(III)-b CASCADE AREATOR 2 % of Quoted rate
On submission of Designs 2.5%
On approval of Designs 2.5%
On completion of excavation 7.5%
On completion of staging height up to reservoir 30%
On completion of floor reservoir 30%
On completion of walls of reservoir 22.5%
Volume-III, PRICE BID
On completion of Roof of reservoir with all related piping and 5%
other work including hydro testing
(IV) Raw water channel from inlet chamber To flash mixer 2% of Quoted rate
1 Excavation for supporting structure 5.0%
Works up to G.L. 15.0%
All RCC works including all supply and fixing of related materials 30.0%
upto floor level
Completion of all civil works including all supply and 35.0%
fixing of related materials
Hydraulic test 10.0%
Commissioning 5.0%
V) Flash Mixer 4 % quoted rate
Excavation 5.0%
Works up to Ground Level 10.0%
R.C.C. works up to top including all supply and fixing of related 60.0%
Finishing all surfaces including painting 15.0%
Hydraulic test 5.0%
Commissioning 5.0%
VI) Clariflocculator Works 20 % quoted rate
RCC wall upto flooring including all supply and fixing of related 30%
RCC wall upto 1st lift (50% of the design height) 5%
RCC wall lupto 2nd lift (100% of the design height) 10%
RCC wall upto top including all supply and fixing of 20%
related materials
Remaining all works including all supply and fixing of 15%
related materials
Hydraulic testing of water retaining structures 5%
Finishing of all surfaces and painting coating etc. 5%
Commissioning 5%
VII) RCC Channel from Clariflocculator to Filter Bed 5% Quoted rate
RCC Works for floor slab including all supply and fixing of related 40%
Completion of all works and finishing all surfaces 50.0%
including painting, supply and fixing of related materials
Hydraulic test 5.0%
Commissioning 5.0%
VIII ) Filtration Works 40% Quoted rate
RCC wall up to filter floor level including pure water 10%
channel floor slab
Up to operating platform 15%
RCC wall up to top slab including all laboratory and other units 30%
Completion of all the remaining works including back 30%
wash tank and related arrangements; all supply and
fixing of related materials
Hydraulic testing/liquid retaining structures 5%
Volume-III, PRICE BID
Commissioning 5%
VIIII Chemical Works 15 % Quoted rate
Excavation 5.0%
RCC/Masonry work below plinth 15%
RCC work up to 1st floor 30%
RCC works up to roof slab 20.0%
Completion of the remaining works including painting, 30%
finishing; supply and fixing of related materials
X Miscellaneous Works
THESE WORKS INCLUDES: By pass CI pipeline from Inlet chamber
to clear water sump. CI pipeline from flash mixer to
clariflocculator, Pure water CI pipeline from filter beds to clear
water sump, Bye pass CI pipeline from clariflocculator to clear
water sump, CI wash water pipeline from proposed wash water
tank to filter beds, Wash water CI pipeline from filtration bed to
XI All other related and required works as directed Submission of 2% of Quoted rate
As built drawings and training to staff
6 All Electro-mechanical works
A Mechnical Equipment
A-1 Pump motor Assembly set Total 35% weightage(Amount) of
accepted LS KW based quoted
A-2 Valve & Expansion bellows & Flow meter Total 10% weightage(Amount) of
accepted LS KW based quoted
A-3 Pipes & Specials Total 5 % weightage(Amount) of
accepted LS KW based quoted rate
B Electrical & Instrumentation Equipment
B-1 Transformer Total 20% weightage(Amount) of
accepted LS KW based quoted
B-2 HV Switch Gear panels (VCB) Total 5 % weightage(Amount) of
accepted LS KW based quoted
B-3 LV Distribution Board, MCC & APFC Panels ,Power & Control Total 10% weightage(Amount) of
accepted LS KW based quoted
B-4 Switch yard ,Cable, Lighting & Earthing with accessories Total 5 % weightage(Amount) of
accepted LS KW based quoted
B-5 PLC Scada Instrumentation panel system with associated Total 10% weightage(Amount) of
accessories with DC battery,battery charger and distribution panel. accepted LS KW based quoted
All Mechanical-Electrical Equipment’s shall have following 3 stage of payment viz. on completion of
supply ,on completion of Erection /Installation and on Completion of testing & commissioning as
per weightage specified above.
1 On supply of equipment at site 75% of weightage (amount)
15% of weightage (amount)
2 After Installation/Erection of equipment
After Successful Testing & Commissioning of equipment (on 10% of weightage (amount)
completion of stipulated Trial Run)
VOLUME -III A PRICE BID
7 Village level pumping Machinery
a On supply of equipment at site 75% of Quoted rate
b On erection /Installation /Connection 15% of Quoted rate
c On Successful Testing & Commissioning of equipment 10% of Quoted rate
8 Valve chambers
a On completion works as per approved drawings 95% of Quoted rate
b After commission of system 5% of Quoted rate
10 Operation and Maintenance
Every month/ quarter in equal instalment based on the Estimated For monthly payment: 1/12th of
prices for O&M will be paid as per the schedule of payment. annual O&M price for the year
terms and condition of the
For quarterly payment: 1/4th of
annual O&M prices for the year
terms and condition of the
Price Break-up for 1500000 liters U.G.SUMP at Tadkeshwar WTP
11 Full supporting structure including column, ring beam and 25 % of Quoted rate
completion of top slab / dome
Plastering inside & outside with epoxy etc. complete 20 % of Quoted rate
Procurement and fixing of inlet, outlet, washout, overflow pipes,
valves, specials, chambers, lighting arrester conductor 20 % of Quoted rate
and specials at site
Water level indictor, painting of letters, M.S ladder, pipes, railing
and all miscellaneous items such as snowcem paint in three coats
etc (Completed with all respect) including water tightness test 15 % of Quoted rate
On hydraulic testing 20 % of Quoted rate
Date: Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B
NAME OF SCHEME::-Mini Water Supply Scheme At Vill.Taparvada Dist.Tapi
Tal : Nizar Dist : Tapi
NAME OF WORK ::- The work for pipline shifting due to Bridge Demolation And new
bridge built up at various place of South Nizar RWSS
Schedule showing the approximately the materials to be supplied to the contractor
from Gram panchayat store for this work of contractor to be executed and the rate at which they
are to be charged ::
Sr.No. Particulars. Qty. Rate at which the Place of delivery.
materials will be
160 mm dia PVC Pipe 310.00 Free of cost Rmt
1 200 mm dia PVC Pipe 100.00 Free of cost Rmt
2 250 mm dia PVC Pipe 170.00 Free of cost Rmt At Various GWSSB
3 300 mm dia D.I.K-7 Pipe 600.00 Free of cost Rmt Stores of Tapi district
4 350 mm dia D.I.K-7 Pipe 600.00 Free of cost Rmt
5 400 mm dia D.I.K-7 Pipe 330.00 Free of cost Rmt
1. The contractor submitting the tender shall see that the rate in schedule-A are filled in by
the Engineer in charge at the time of issue of tender.
2. The contactor while submitting the tender shall provide his own arrangement at his own
cost of loading , unloading and transporting safely to the site of work as stipulated in
3. Binding wire of 15 gauge or thinner gauge required for placing the reinforcement in
position shall be provide at his own cost.
4. All the materials required for the item other than labour items mentioned in schedule –B . and
Materials not included in schedule-A but available with the department will be issued
on request to the contractor .(for use in this contract only)at p
5. All the surplus materials Supplied by the dept. As mentioned in schedule-A should be handed over
by the contractor at the Government stores as directed ;failing which material shall be
charged at penal rate i.e. double the issue rate.
6. The materials mentioned in schedule-A shall have to the cheked for their correctness and
soundness by the contractor before taking the delivery of the materials from the government stores.
Dtd. Signature of Contractor EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DN,
DEPUTY EXECUTIVE ENGINEER,
PUBLIC HEALTH SANITARY SUB-DN,
M & R to South Nizar Regional water supply scheme year 2026-27
Name of Work: The work for pipline shifting due to Bridge Demolation And new bridge built up at various place of
South Nizar RWSS
Taluka : Nizar District :Tapi .
Schedule showing the approximate quantities of materials to be supplied by the Gujarat Water Supply & Sewerage Board for the
work to be executed on contract and the rates at which they are to be charged.
mate cost put to Tender :- Rs.87,02,813.00 /- Time Limit:- Three Month (3)
QTY. UNIT ITEM RATE PER AMOUNT
In Fig. In Word
RMt. Item No. 1: Removing of existing pipeline incl. removal of
specials, valves jointing material incl. carting and stacking
of removed material from site of work to the department
store as directed excl. excavation and refilling.
250.00 Rupees Six & Rmt.
Rmt. 160 mm dia PVC 6.30 Paise Thirty
425.00 Rupees Rmt.
Rmt. 250 mm dia PVC
490.00 Rupees Rmt.
Rmt. 300 mm dia D.I. 73.50 & Paise Fifty
525.00 Rupees Ninety Rmt.
Rmt. 350 mm dia D.I.
270.00 Rupees One Rmt.
Rmt. 400 mm dia D.I. 111.30 Eleven &
Providing and supplying in standard length ISI mark rigid
unplasticised PVC pipes suitable for portable water with
ringfit joint including cost of rings, as per IS specification
No. 4985/1988 including all local and central taxes,
transportation, freight charges, octroi, inspection charges,
loading, unloading, conveyance to the departmental
stores and including cost of jointing material etc.
Rupees Four Rmt.
310.00 Rmt. 160 mm dia PVC Pipe 420.00 Hundred
Rupees Six Rmt.
100.00 Rmt. 200 mm dia PVC Pipe
Rupees One Rmt.
170.00 Rmt. 250 mm dia PVC Pipe
PVC Fittings: Providing and supplying at store or site of
work incl. freight, loading, unloading, stacking, insaurance
& all taxes etc. Complete
(c) pvc specials. 90 degree bends PVC Pressure
4.00 No 250 mm (200mm Dia) 3244 Two Hundred No
DI Fittings: Providing and supplying at store or site
of work incl. freight, loading, unloading, stacking,
& all taxes etc. Complete
(c) DI specials
420.00 KG 45 degree bends DI Upto 300mm 148 Hundred Forty KG
780.00 KG 45 degree bends DI Above 300mm 151 Hundred Fifty KG
Excavation for pipe line trenches for water supply,
sewrage line, manhole etc. all with shoring and
struting if required gradient and line inclu. safety
provisions using site rails and stacking excavated
stuff up to 1.50 mt depth lead cleaning the site etc.
complete for lifts and strata as specified.
1065.22 Cum (A) In all sorts of soil and soft murrum 93.45 Cum
(B) In hard murrum, boulders including mecadam
1065.22 Cum 141.75 One & Paise Cum
236.72 Cum (D) In Soft rock 171.15 Seventy One Cum
Lowring, laying and jointing PVC pipes and specials
of following class and diameter including cost of
conveyance from stores to site of works including
cost of labour, material, except cement solvent,
giving satisfactory hydraulic testing as per ISI code,
310.00 Rmt. 2) 160 mm dia PVC 29.40 Rmt.
170.00 Rmt. 4) 250 mm dia PVC 53.55 Rmt.
Lowering, Laying and Jointing C.I. S & S Spun
pipes suitable for Tyton joints/ Mortar lined D.I. pipes
for various classes with C.I. /MS specials of
following diameters in proper position, grade and
alignment as directed by Engineer-in-charge
including hydraulic testing etc. comp.
600.00 Rmt 2)300 mm DI K-7 162.75 Two & Paise Rmt
600.00 Rmt 3)350 mm DI K-7 197.40 Ninety Seven Rmt
330.00 Rmt 4)400 mm DI K-7 236.25 Thirty Six & Rmt
Provindng C.C. M-100 for encsing pipes using trap
metal size 12mm to 50mm icluding from work curing
consolidation etc. complete for various location on
pipeline.(Using trap metal 20mm nominal size)
258.06 Cmt Encasing 4319.49 Hundred Cmt
Providing and casting in situ C.C. in grade M-20
(proportions as per mix design or as per table9 of
IS456 2000 in masses by weigh batching) using
granite, quartzite trap metal of size 6 mm to 20 mm
for RCC work, including scaffolding centering,
33.76 Cmt formwork, needle vibrated consolidation, curing 5796.00 Cmt
complete up to 6 meter depth or height (excluding Ninety Six
cost of reinforcement and neat finishing) with only
centering and shuttering/deshuttering etc. complete
for structure other than water retaining (Below G.L).
Footing for column or foundation(with form work)
Refilling the pipeline trenches incl. ramming,
1952.98 Cum watering, consolidating desposal of surplus stuff as 23.10 Cum
directed within a radius of 3 km. only
Drilling of 300mm dia Horizontal borehole for
watermain pipeline crossing under the road incl in all
strata with requried length incl fixing of 400mm dia
M.S/RCC casing pipe with pushing etc complete
various size of pipe for 193.7 to 244.5mm dia
watermain (For 45 mtLength) 9.3 Without
Watermain & with MS Casing Pipe - 250mm dia
1.00 Rupees Two
No Without Water Main&with Mscasing pipe 250 thik-5 206176.95 No
1.00 Job ROU for laying of pipeline at farmer land 150000.00 Job
rry out the work at ______________________________ above
below ________________________________(should be written in figures and words)
the estimated cost mentioned above amount of my / our tender works out as under ::-
ESTIMATED AMOUNT PUT TO TENDER,. ESTIMATED AMOUNT PUT TO
Deduct Rs. ___________% Below. Add Rs. ___________ % above.
of Contractor DEPUTY EXECUTIVE ENGINEER, EXECUTIVE ENGINEER,
PUBLIC HEALTH SANITARY SUB-DN, PUBLIC HEALTH WORKS DN,
GUJ.W/S & SEWERAGE BOARD, GUJ.W/S & SEWERAGE BOARD,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. VOL 1 A Technical Bid.pdf
02.Volume-IB GCC.pdf
Volume 2 Specifications.pdf
Volume 3 Price Bid.pdf
02.Volume-IB GCC.pdf
CORRIGENDUM
Volume 2 Specifications.pdf
CORRIGENDUM
01. VOL 1 A Technical Bid.pdf
CORRIGENDUM
Volume 3 Price Bid.pdf
CORRIGENDUM
02.Volume-IB GCC.pdf
CORRIGENDUM
Volume 2 Specifications.pdf
CORRIGENDUM
01. VOL 1 A Technical Bid.pdf
CORRIGENDUM
Volume 3 Price Bid.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .