Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.6 LAccepted-AOC | ₹21.6 L | L1 | Accepted-AOC L1Bidder |
| 2 | L2₹21.8 LRejected-Finance | ₹21.8 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | jfjconstruction L1 | Shri Uday Bhiva Gawandi L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excevation by mechanical/manual means in all types of strata comprising any of the materials such as soil,sand ,silt,clay ,gravel,moorum of all varieties shingles,pebbles,all types of conglomerates,laterite rock,soft rock,ordinary rock,disintegrated or weathered rock,fissured/shattered,decomposed rock and all such other materials either in full or in parts as the case may be by adopting any approved method or methods as may be convenient of permitted inclusive of chiseling,wedging etc,but blasting prohibited in all conditions such as dry,moist,saturated,submerged,foul conditions etc.Including pumping or bailing out water/dewatering including setting out construction of shoring ,strutting and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,providing barricading,danger lighting ,guarding etc.And backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and lifts as per specifications and drawing and as directed by the Engineer -in -charge etc.complete. | 99 | Cum | 300 ₹29,700 | 308 ₹30,492 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 27 | Cum | 2,300 ₹62,100 | 2,264.87 ₹61,151.49 |
| 3.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto Plinth Level. | 180 | Cum | 7,100 ₹12.8 L | 6,999 ₹12.6 L |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete. | 384 | Sq.m | 450 ₹1.7 L | 444 ₹1.7 L |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retaining structure complete as directed by the Engineer in charge : a)110 mm Dia | 72 | RM | 200 ₹14,400 | 380.62 ₹27,404.64 |
| 6.00 | Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: a)Upto 2.5 meters long pile. | 450 | Metre | 250 ₹1.1 L | 216.01 ₹97,204.50 |
| 7.00 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured : a)Upto 2.5 meters long pile. | 360 | Metre | 230 ₹82,800 | 360 ₹1.3 L |
| 8.00 | Earthwork in Embankment with approved earth (Contractors earth)/moorum including spreading the earth in layers not excedding 250mm in depth,breaking clods,watering,rolling each layer with half ton roller or wooden hammer including filling up ground depression ,dressing etc.complete with all leads and lifts and as directed by engineer -in -charge. | 135 | Cum | 600 ₹81,000 | 550.01 ₹74,251.35 |
Tender Value
₹20.8 L
EMD Value
₹41,630
Closing Date
18 Aug 2025, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Construction of river bank protection wall along distributary of River Chapora at Pokewada in V.P. Morjim in Mandrem Constituency.
2025_WRD_23988_1
6-9/WDI/WRD/ASW/25-26/e-15/4
Open Tender
Miscellaneous Works
60 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹41,630
22 Apr 2026
25 Jul 2025
19 Aug 2025
25 Jul 2025
18 Aug 2025
25 Jul 2025
Amount
Earthwork in excevation by mechanical/manual means in all types of strata comprising any of the materials such as soil,sand ,silt,clay ,gravel,moorum of all varieties shingles,pebbles,all types of conglomerates,laterite rock,soft rock,ordinary rock,disintegrated or weathered rock,fissured/shattered,decomposed rock and all such other materials either in full or in parts as the case may be by adopting any approved method or methods as may be convenient of permitted inclusive of chiseling,wedging etc,but blasting prohibited in all conditions such as dry,moist,saturated,submerged,foul conditions etc.Including pumping or bailing out water/dewatering including setting out construction of shoring ,strutting and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,providing barricading,danger lighting ,guarding etc.And backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and lifts as per specifications and drawing and as directed by the Engineer -in -charge etc.complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto Plinth Level.
Centering and shuttering including struttings, propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retaining structure complete as directed by the Engineer in charge : a)110 mm Dia
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: a)Upto 2.5 meters long pile.
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured : a)Upto 2.5 meters long pile.
Earthwork in Embankment with approved earth (Contractors earth)/moorum including spreading the earth in layers not excedding 250mm in depth,breaking clods,watering,rolling each layer with half ton roller or wooden hammer including filling up ground depression ,dressing etc.complete with all leads and lifts and as directed by engineer -in -charge.
Shri Uday Bhiva Gawandi (BID ID -51685)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 1.09 MB
BOQ_24414.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid