| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹38.7 LAdmitted-Finance | -6.00% | ₹38.7 L | L1 | Admitted-Finance |
| 2 | L2₹39.1 L+₹37,086.99 (0.96%)Admitted-Finance | -5.10% | ₹39.1 L+₹37,086.99 (0.96%) | L2 | Admitted-Finance |
| 3 | L3₹40.5 L+₹1.7 L (4.50%)Admitted-Finance | -1.77% | ₹40.5 L+₹1.7 L (4.50%) | L3 | Admitted-Finance |
| 4 | L4₹40.7 L+₹2.0 L (5.05%)Admitted-Finance | -1.25% | ₹40.7 L+₹2.0 L (5.05%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹41.2 L
EMD Value
₹97,300
Closing Date
20 May 2026, 5:00 pmClosed
DIRECTOR(H)
SECTOR-39, NOIDA
M/o Park (C/o Footpath and other Civil Maintenance Work in Park, Opposite Sikka Kaamna Greens, Sector-141) NOIDA.
2026_NOIDA_1146251_1
02/D(H)/DD(H)-III/2026-27
Open Tender
Civil Works - Others
Fixed-rate
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,124
NOIDA
₹97,300
21 Jul 2026
7 May 2026
21 May 2026
7 May 2026
20 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mecanical means (hydraulic excavater)/manual means in over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) i/c disposal of excavated earth, lead up to 50 m and lift up 1.5, disposed earth to be levelled and neatly dressed in all kind of soil.The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | 134.9 | Cum. | 136 | ₹18,346.4 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal size) | 127.57 | Cum. | 5,746.88 | ₹7,33,129.48 |
| 3 | Brick work with common burnt clay F.P.S.(non moduler) bricks of class designation 100 in foundation and plinth in cement mortar 1:4 (1 Cement : 4 C.Sand). | 18.38 | Cum. | 5,214.8 | ₹95,848.02 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 150 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 6.89 | Cum. | 6,276.98 | ₹43,248.39 |
| 5 | 12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand) | 152.84 | Sqm | 176.77 | ₹27,017.53 |
| 6 | P/L C.C pavement of mix M-25 with ready mixed concrete from batching plant. concrete shall be laid and finished with screed board vibrator, vacuum dewatering process and finally finished by floating, brooming with wire brush etc complete. | 7.12 | Cum. | 8,141.85 | ₹57,969.97 |
| 7 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). | 31.98 | Cum. | 6,920.96 | ₹2,21,332.3 |
| 8 | Earth work in embankment in ordinary soil embankment to be in 20cm layer breaking clods. Watering rolling each layer with 1/2 tonne roller or wooden or steel rammer and rolling every third or top most layer with power roller or minimum 8 tonne including 1.5m lift and all lead including cartage of earth by mechanical transportion and all T&P labour etc. required for proper completion of work (Earth shall be arranged by the contractor at his own cost from out side of NOIDA). | 290.34 | Cum. | 363.05 | ₹1,05,407.94 |
| 9 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 ( 1cement : 5 coarse sand) with joints finished flush. 40 mm thick Red Sand Stone | 580.66 | Sqm | 733.91 | ₹4,26,152.18 |
| 10 | Reinforced cement concrete work in walls (any thickness) i/c attached plasters, buttresses, plinth & string courses, fillets, columns, pillers, piers, abutments, posts and struts etc. upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 37.9 | Cum. | 8,239.9 | ₹3,12,292.21 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_2143472.xls
BOQ • 0.39 MB
02.pdf
Tender Documents • 5.89 MB
NITspecialconditions2026.pdf
Additional Documents • 2.52 MB
Capability_nh.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .