| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VIJAY CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00Supplying, installation, Testing and commissioning of the passenger/goods /Stretcher or Bed elevator having following main features: (a) MOTOR : Gearless lift drive comprising of high starting torque lift duty , 3 phase 440 Volts A.C. permanent magnetic synchronous motor of proper rating with high efficiency shall be used. (b) Operation / Drive : Microcessor based /PLC, AC Variable Voltage variable frequency variable speed (V3F) vector control drive with encoder feedback closed loop system shall be used for lift car and door operation which shall be full collective selective operation hall call demand response , UP/Down hall stops , main , Up/Down contactor with overload and phase reversal relay and safety controls. (c) Traction Media: main hoist flat coated steel belt / rope . Thimbles of spring permit adjustment of uniform tension for smooth operation of the elevator Pulse belt monitoring system to avoid the cut in the belt. (d) Car : car should be with M S platform with bracings of adequate size and to sustain the impact load cabin plus passengers with safety factor of fire for steel with Anti-skid PVC flooring and side panels should be of Stainless steel with hair line finish of sheet of grade 304 duty with S.S. handrails . Car ceiling shall be steel finish with aesthetic appearances with LED ceiling lights .The size of the car shall be taken as per available lift well size and relevant BIS code of lifts. Car panel will also be of S S 304 grade finished with emergency stop device, emergency alarm, mechanical door safety device, full length infra-red curtain in car door, facility of auto/attended mode. All car panel buttons and all floor switches must be with brail language as per lift act. Agency shall also provide & install one No. 2 MP , IR , IP based ceiling mounted DomeCamera in the car complet e with connecting cables & accessories (To be connected with existing CCTV system in the Building) .The inspection unit shall be provided at the top of the car. (e) Landing Doors: All landing door shall be fully automatic centre opening / telescopic made of hair line finish stainless steel grade 304 with key holes and infrared curtains with unlocking facility from outside. (f) Emergency light: Appropriate rechargeable battery operated LED emergency light in the car and along with alarm switch shall be provided. (g) ARD: Automatic rescue Device (ARD) shall be provided according to passenger capacity with SMF batteries of approved brands as per BSR. (h) Audio-Visual Indication: Audio visual indication in the lift car, showing over loading such that doors kept open till excess load is removed. (i) Scrolling Indicators: Digital scrolling indicator system for up-down arrow with floor position indicator shall be provided inside the car and at all stops/floors. (j) Buffers: Spring buffers/PU Buffers shall be provided. (k) Car Fan: ENERGY EFFICIENT Car fan/blower with automatic sleep timer shall be provided. (l) Voice Annunciator: Voice annunciator with suitable music shall be provided in lift car. (m) Self diagnostics system for operational and safety parameters shall be provided in control panel. (n) Mechanical/Electronic over speed governor, door key holes in the floor doors, fireman switch shall be provided. (o) Lift machine hoisting arrangement in the lift machine room, counter balance to promote smooth and economic operation complete with steel guide rails for the car & counter weight, Trap Door, Lifting hooks as required and monkey ladders for lift pit should be provided by the agency along with all other steel structure works, foundations for the machine etc as required. (p) Permanent wiring in lift machine room and in lift well with providing and fixing of electrical distribution board complete with SP & TP MCB's , proper numbers of light points, with LED fixtures , exhaust fan , 2 nos copper plate /chemical earthing with 8 SWG copper earth wire and plug points shall be provided by the agency . (Power supply of 3 phase 440 V shall be made available by department in lift machine room.) (q) All civil work related to installation of lift like finishing, cleaning and leveling of lift pit , white wash of lift well and in machine room shall be done by the lift erecting agency without any extra cost. (r) Granite or marble cladding around all landing door openings shall be in the scope of lift installation agency and additional payment shall be made according to the actual measurement / schedule by the department to the lift agency. (s) Agency has to provide all working drawings and documents to comply latest BIS specifications and make proper liaison services for obtaining all necessary permissions. | ||||
| 1.01 | 13 passengers/884 Kg , 3 stops , rated speed adjustable up to 1.0
mtr /sec with 2 years comprehensive maintenance / DLP . Make- Schindler,KONE, Otis Elevator,Mitsubishi Electric, ThyssenKrupp Elevator. | 2 | JOB | 18,86,300 ₹37,72,600 Lowest |
| 1.02 | Supply, Installation, Testing & Commissioning of modular type Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units suitable for cooling and heating, having 100% hermetically sealed inverter type Scroll Compressor(s) with and minimum two compressors along with two Condensing fan, microprocessor based Controller, Side / top discharge type condensing unit(s), with R-410 A Refrigerant, vibration isolators, with suitable foundation etc. complete as required. The unit shall deliver the rated capacity at AHRI Conditions and work even at 50°C ambient temperature without tripping. The unit shall be suitable to work on 400V +/- 10%, 3 Phase, 50Hz AC power supply. The unit shall be filled with first charge of the refrigerant and ready for use as required. The EER at 100% load with AHRI conditions shall not be less than 3.5 and Including OEM supplied Piping connection Kit etc. as required. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work . make- mitsubishi, hitachi, O- general ,Daikin | 100 | per HP | 33,800 ₹33,80,000 Lowest |
| 1.03 | Supply, installation, testing and commissioning of following minimum capacity 4-way flow VRV/VRF 2.2TR Cassette Type Indoor ceiling mounted unit equipped with synthetic washable media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX Copper coil, electronic expansion valve, outer cabinet, drain pump, grill, necessary supports, vibration isolation, Corded remote control etc., suitable for operation on single phase 230 V ± 10%, 50Hz AC supply, complete, as required. The unit shall have automatic force shut down valve in case of fire on receiving signal from BMS System. The cooling capacity of indoor unit will be at air inlet conditions (Make will be same as of Outdoor) All as per pre approved by Engineer in charge. For additional technical parameters of products/ work . make- mitsubishi, hitachi, O- general, Daikin | 30 | EACH | 59,150 ₹17,74,500 Lowest |
| 1.04 | Supply, installation, testing and commissioning of following minimum capacity VRV/VRF 1.65 TR High wall type Indoor unit equipped with and comfort washable synthetic media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX copper coil, electronic expansion valve, outer cabinet, cord less remote control, drain pan, necessary accessories etc., suitable for operation on 230 V ± 10%, 50 Hz, single phase AC supply, complete as required. The unit shall have automatic force shut down valve in case of fire on receiving signal from BMS System. The cooling capacity of indoor unit will be at air inlet conditions (Make will be same as of Outdoor) All as per pre approved by Engineer in charge. For additional technical parameters of products/ work | 8 | EACH | 23,400 ₹1,87,200 Lowest |
| 1.05 | Supply, installation, testing and comissioning of interconnecting copper refrigerant piping ( 6 mm to 41 mm OD mm ) of DHE Grade C12200- ASTM B68, B75, chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube :- Tensile strength = 210 Mpa wih elongation % = 40 Min . Ink Mark Brand Printing on Hard Tubes should be present. duly insulated with tubular elastomeric nitrile rubber FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified 'Class O' in Fire Propagation as per BS 476 Part 6 including chase cutting andfilling with mortar, Slotted channel supports mounted on 10 mm threaded rod at suitable spacing the exposed piping shall be wrapped with glass woven cloth and lag coating for vapour barrier and weather protection. Joints shall be covered with nitrile rubber tape of complete as required of following sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work . | 2,900 | kg | 1,494 ₹43,32,600 Lowest |
| 2.00 | Providing & Fixing of UPVC drain water piping ( 20 mm to 30 mm ) with fittings like elbow, socket, Tee, solvent cement jointing, support with MS hanger on ceiling or recessed in wall with chasing & plastering insulation including leakage testing etc. as required of following Nominal sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work . | 500 | mtr | 270 ₹1,35,000 Lowest |
| 3.00 | Gas charging of VRF/VRV system with R410A refrigerant gas. Before gas charging system shall be flushed with high purity Nitrogen Gas to remove carbon content, dirt particles to make sure that there is no chance of mixing any impurity with Refrigerant Gas. Thereafter System shall be tested with Nitrogen Gas at 1.5 Times of working pressure of R410 Refrigerant Gas to ensure leakproof system. Whole system shall be Vacuumed up to 500-micron level which ensures the zero-moisture content level in piping to ensure better cooling efficiency and long life of the system. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work . | 100 | KG | 1,488 ₹1,48,800 Lowest |
| 4.00 | Supplying and installation of high-pressure grade required size OEM make copper connection BHF JOINTS OR Y OR T Joints / refnet for liquid and suction line complete erected on wall/ceiling with supports/raceways, Nitrile rubber insulation, painting etc. with brazing and testing for leakages confirming the normal operation of the VRV / VRF air conditioning system. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work . | 60 | EACH | 6,600 ₹3,96,000 Lowest |
| 5.00 | Control & Transmission Wiring:
Supply and installation of control cum transmission wiring of 3 core x 1.5 sqmm copper in suitable conduits between indoor and from outdoor units to centralized controller. | 1,500 | mtr | 300 ₹4,50,000 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
2 Oct 2023, 6:00 pmClosed
Commissioner
Municipal Corporation Ajmer
Lift and AC in New Nagar Nigam Building.
2023_DLB_371040_1
Light/3454
Open Tender
Miscellaneous Services
Lump-sum
365 days
Ajmer
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Commissioner
₹2.3 L
Yes
5 Oct 2023
27 Sept 2023
3 Oct 2023
27 Sept 2023
2 Oct 2023
27 Sept 2023
Amount
13 passengers/884 Kg , 3 stops , rated speed adjustable up to 1.0 mtr /sec with 2 years comprehensive maintenance / DLP . Make- Schindler,KONE, Otis Elevator,Mitsubishi Electric, ThyssenKrupp Elevator.
Supply, Installation, Testing & Commissioning of modular type Variable Refrigerant Flow/Variable Refrigerant Volume air cooled Outdoor units suitable for cooling and heating, having 100% hermetically sealed inverter type Scroll Compressor(s) with and minimum two compressors along with two Condensing fan, microprocessor based Controller, Side / top discharge type condensing unit(s), with R-410 A Refrigerant, vibration isolators, with suitable foundation etc. complete as required. The unit shall deliver the rated capacity at AHRI Conditions and work even at 50°C ambient temperature without tripping. The unit shall be suitable to work on 400V +/- 10%, 3 Phase, 50Hz AC power supply. The unit shall be filled with first charge of the refrigerant and ready for use as required. The EER at 100% load with AHRI conditions shall not be less than 3.5 and Including OEM supplied Piping connection Kit etc. as required. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work . make- mitsubishi, hitachi, O- general ,Daikin
Supply, installation, testing and commissioning of following minimum capacity 4-way flow VRV/VRF 2.2TR Cassette Type Indoor ceiling mounted unit equipped with synthetic washable media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX Copper coil, electronic expansion valve, outer cabinet, drain pump, grill, necessary supports, vibration isolation, Corded remote control etc., suitable for operation on single phase 230 V ± 10%, 50Hz AC supply, complete, as required. The unit shall have automatic force shut down valve in case of fire on receiving signal from BMS System. The cooling capacity of indoor unit will be at air inlet conditions (Make will be same as of Outdoor) All as per pre approved by Engineer in charge. For additional technical parameters of products/ work . make- mitsubishi, hitachi, O- general, Daikin
Supply, installation, testing and commissioning of following minimum capacity VRV/VRF 1.65 TR High wall type Indoor unit equipped with and comfort washable synthetic media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX copper coil, electronic expansion valve, outer cabinet, cord less remote control, drain pan, necessary accessories etc., suitable for operation on 230 V ± 10%, 50 Hz, single phase AC supply, complete as required. The unit shall have automatic force shut down valve in case of fire on receiving signal from BMS System. The cooling capacity of indoor unit will be at air inlet conditions (Make will be same as of Outdoor) All as per pre approved by Engineer in charge. For additional technical parameters of products/ work
Supply, installation, testing and comissioning of interconnecting copper refrigerant piping ( 6 mm to 41 mm OD mm ) of DHE Grade C12200- ASTM B68, B75, chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube :- Tensile strength = 210 Mpa wih elongation % = 40 Min . Ink Mark Brand Printing on Hard Tubes should be present. duly insulated with tubular elastomeric nitrile rubber FM/UL approved with high water vapor diffusion resistance and low thermal conductivity should be certified 'Class O' in Fire Propagation as per BS 476 Part 6 including chase cutting andfilling with mortar, Slotted channel supports mounted on 10 mm threaded rod at suitable spacing the exposed piping shall be wrapped with glass woven cloth and lag coating for vapour barrier and weather protection. Joints shall be covered with nitrile rubber tape of complete as required of following sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work .
Providing & Fixing of UPVC drain water piping ( 20 mm to 30 mm ) with fittings like elbow, socket, Tee, solvent cement jointing, support with MS hanger on ceiling or recessed in wall with chasing & plastering insulation including leakage testing etc. as required of following Nominal sizes. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work .
Gas charging of VRF/VRV system with R410A refrigerant gas. Before gas charging system shall be flushed with high purity Nitrogen Gas to remove carbon content, dirt particles to make sure that there is no chance of mixing any impurity with Refrigerant Gas. Thereafter System shall be tested with Nitrogen Gas at 1.5 Times of working pressure of R410 Refrigerant Gas to ensure leakproof system. Whole system shall be Vacuumed up to 500-micron level which ensures the zero-moisture content level in piping to ensure better cooling efficiency and long life of the system. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work .
Supplying and installation of high-pressure grade required size OEM make copper connection BHF JOINTS OR Y OR T Joints / refnet for liquid and suction line complete erected on wall/ceiling with supports/raceways, Nitrile rubber insulation, painting etc. with brazing and testing for leakages confirming the normal operation of the VRV / VRF air conditioning system. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work .
Control & Transmission Wiring: Supply and installation of control cum transmission wiring of 3 core x 1.5 sqmm copper in suitable conduits between indoor and from outdoor units to centralized controller.
Supply & fixing MS powder coated stand suitable for outdoor type of VRV/VRF AC including vaibration pipe . All as per pre approved by Engineer in charge. For additional technical parameters of products/ work .
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Terms.pdf
Tender Documents • 1.45 MB
BOQ_661660.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .