| 1 | L1₹22.7 LAccepted-AOC | ₹22.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.8 L+₹13,269.90 (0.58%)Rejected-AOC | ₹22.8 L+₹13,269.90 (0.58%) | L2 | Rejected-AOC L2 |
| 3 | L3₹23.0 L+₹25,856.08 (1.14%)Rejected-AOC | ₹23.0 L+₹25,856.08 (1.14%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | JAGANNATH DAIMARI L3 | KHAGEN CHANDRA MOCHAHARI L1 | REG-CON/PWDB/2023/7586948 L2 |
|---|---|---|---|---|---|---|
| 1.00 | OPEN PANDAL
2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 135 | Cum | 800 ₹3,334.4 | 744.07 ₹3,101.28 Lowest | 744.07 ₹3,101.28 Lowest |
| 2.00 | 16.12 Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 849.22 | Sqm | 450 ₹15,300 | 320.86 ₹10,909.24 Lowest | 320.86 ₹10,909.24 Lowest |
| 3.00 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.59 | Cum | 55 ₹9,157.5 | 47.75 ₹7,950.38 Lowest | 47.75 ₹7,950.38 Lowest |
| 4.00 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.1 Mild steel and Medium Tensile steel bars | 3,190.14 | Kg | 400 ₹66,600 | 359.45 ₹59,848.43 Lowest | 359.45 ₹59,848.43 Lowest |
| 5.00 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.1 Mild steel and Medium Tensile steel bars | 3,584.11 | Kg | 1,47,000 ₹3,25,164 | 1,41,000.95 ₹3,11,894.1 Lowest | 1,47,000 ₹3,25,164 |
| 6.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 125.95 | Sqm | 3,926.72 ₹1,04,175.88 Lowest | 3,926.72 ₹1,04,175.88 Lowest | 3,926.72 ₹1,04,175.88 Lowest |
| 7.00 | 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 184.32 | Sqm | 4,725.9 ₹1,38,043.54 Lowest | 4,725.9 ₹1,38,043.54 Lowest | 4,725.9 ₹1,38,043.54 Lowest |
| 8.00 | 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 256 | Sqm | 1,501.65 ₹1,07,007.58 Lowest | 1,501.65 ₹1,07,007.58 Lowest | 1,501.65 ₹1,07,007.58 Lowest |
| 9.00 | 5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources) | 36.12 | Cum | 409.74 ₹11,751.34 Lowest | 409.74 ₹11,751.34 Lowest | 409.74 ₹11,751.34 Lowest |
| 10.00 | 5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.69 | Cum | 722.55 ₹21,763.21 Lowest | 722.55 ₹21,763.21 Lowest | 722.55 ₹21,763.21 Lowest |
Tender Value
₹22.7 L
EMD Value
₹45,489
Closing Date
21 Feb 2026, 12:30 pmClosed
Sri J.M. Basumatary
O/o the Addl. Chief Engineer-cum-Director, PWD, BTC, Kokrajhar.
Renovation of Mazbat Anchalik AASAA Office with installation of Adivasi Jatiya Nayak Pradip Nag statue with beautification under SOPD Bodoland Welfare Department 2025-26. TN_108_10
2026_BTC_50973_1
No.ACE-133/PWD/G.79/2025-26/66
Open Tender
Civil Works - Building
Item Rate
180 days
Kokrajhar
Refer to Tender Documents
4 documents required · 4 mandatory
₹500
₹45,489
Yes
6 Jun 2026
9 Feb 2026
21 Feb 2026
9 Feb 2026
21 Feb 2026
9 Feb 2026
9 Feb 2026 - 21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | OPEN PANDAL
2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 135 | Cum | - | - |
| 2 | 16.12 Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete :
16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 849.22 | Sqm | - | - |
| 3 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.59 | Cum | - | - |
| 4 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.1 Mild steel and Medium Tensile steel bars | 3,190.14 | Kg | - | - |
| 5 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.1 Mild steel and Medium Tensile steel bars | 3,584.11 | Kg | - | - |
| 6 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 125.95 | Sqm | - | - |
| 7 | 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 184.32 | Sqm | - | - |
| 8 | 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 256 | Sqm | - | - |
| 9 | 5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources) | 36.12 | Cum | - | - |
| 10 | 5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.69 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
SBD.pdf
Tender Documents • 3.14 MB
BOQ_81109.xls
BOQ • 0.32 MB
FOB.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .