Loading…
Loading…
Tender Value
₹9.1 L
EMD Value
₹9,079
Closing Date
15 Oct 2026, 4:00 pm7d left
Deputy Executive Engineer, Electric (R&B) Sub Division, Rajkot.
All inclusive Comprehensive Annual Maintenance for Ro Plant & Water cooler and Gyser of Govt. Residential building under R&B Electrical Sub division Rajkot(Section 1 to 4)(for 2026-27)
351216
No.13 of 2026-27
Open
Electrical Works
Works
Rajkot
10 documents required · 9 mandatory · 1 optional
₹900
Deputy Executive Engineer, Electric (R and B) Sub Division, Rajkot.
₹9,079
1 Oct 2026
1 Oct 2026
1 Oct 2026
15 Oct 2026
1 Oct 2026
Name of work: All inclusive Comprehensive Annual Maintenance for Ro Plant & Water cooler and Gyser of Govt. Residential building under R&B
Electrical Sub division Rajkot(Section 1 to 4)(for 2026-27)
Item Quantities estimated Item of work Tendered Rate Total amount
Item Quantities estimated Item of work Tendered Rate Total amount
No. but may be more or according to
In Figures In Word
Qty. Unit estiamted
All inclusive comprehensive maintenance cost for the period of
one year for the Reverse Osmosis water purification system up
to 50 Ltr/ Hr capacity.Inclusive replacing and cleaning of Rupees Seven Thousand
1 1 Ea membranes , change of filter , uPVC pipe fitting and booster 7576.01 Five Hundred SeventySix
pump replacing one time in twelve month and servicing of RO Paise One Only
System of following capacity( 6 Services in Twelve months )
(B) 25 Ltr Capacity
Rupees Eleven Thousand
35 Ea (C) 50 Ltr Capacity 11111.01 One Hundred Eleven Paise
All inclusive comprehensive maintenance cost for the period
of one year for the water Heater( Geysers) inclusive inlet & Rupees Six Hundred
outlet water connections flexible piping of following Type & Eleven Paise Five Only
Capacity (A) 3 to 10 Ltr Instant /Storage Type
Rupees Six Hundred
30 Ea (B) 15 to 25 Ltr Storage Type 693.87 NinetyThree Paise
EightySeven Only
All inclusive comprehensive maintenance cost for the period
of one year for the water Cooler of following Capacity
Rupees Three Thousand
133 Ea. (B) 120 / 150 Ltr capacity
Three Hundred ThirtyNine
Rupees Nine Lakh Seven Thousand Eight Hundred Twelve Paise TwentyFour Only
Note:- The Credit of dismentalled materials for Rs.00.00 shall be recovered from the First R.A. bill payable to the contrator and there after the dismentalled
materials shall be the property of the contractor.
I/We am/are willing to carry out the work at__________________% above/below (in figures)_____________________________________percent Above / below (in
words) the estimated rates mentioned above amount of my\our tender works out as under :-
Estimated amount put to Tender Rs. _________
Deduct________% below Rs. _________
Net Amount Rs. _________
Estimated amount put to Tender Rs. _________
Net Amount Rs. _________
A I/We hereby declare that I/we have visited the site and fully acquainted my self / our selves with the local situation regarding material,labour and
other factors pertaining to the work before submitting this tender.
B I/We hereby declare that I/we carefully studied the conditions of contract, detailed technical specifications and other tender documents of this
work and agree to execute the same accordingly.
C Any Excess in Tender Item/Extra Item if Needs to be Execute. Contractors has to carry out work on the instruction of Competant Authority on
Tender Submitted rate,No Excuse will be Accepted.Hence Contractor are Requested to quote the rate considering this condition.
D Contractor are requested to quote the Tender by considering that payment will be made after availibility of grant.Contractor has to start the work
immediately after issue of Work Order and as per instruction of Engineer-in-Charge irrespective of availibility of grant.
E "This estimate has been prepared on the new SOR wich is exclusive of GST hence GST additional will be paid to the agency as per existing
(Signature of the Contractor) Deputy Executive Engineer
Electrical R&B Sub Division
Executive Engineer
Electrical R&B Division
Note 1 Please strike out whichever is not applicable.
2 In the case of tendered amount being quoted incorrectly the quoted pered percentage Below/Above will be considered as final.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Contractor_Registration_Paripatra__1_.pdf
GR for Extra Item.pdf
GR for single Tender.pdf
SD EMD GR 25-26.pdf
ONLINE_NOTICE(R-2).pdf
SBD.pdf
SCH-B.pdf
ANNEXURE-A.pdf
Water_Cooler_RO_Filter_Geyser_AMC_condition_2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .