| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹2.3 Cr+₹29.8 L (14.8%)Rejected-AOC | ₹2.3 Cr+₹29.8 L (14.8%) | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹2.0 Cr
EMD Value
₹1 L
Closing Date
28 Jun 2024, 6:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER KD CIRCLE CHENGANNUR
GENERAL Vellarkonam Padasekhram Construction of Motor shed motor thara and protection work for Vellarkonam Padasekharam in Thakazhy Panchayath General Civil Work
2024_Irrig_675318_1
IRR/KP/TR/854/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Thakazhy Alappuzha
Please refer Tender documents.
12 documents required · 12 mandatory
₹9,759
Yes
₹1 L
Yes
6 Sept 2024
11 Jun 2024
2 Jul 2024
11 Jun 2024
28 Jun 2024
11 Jun 2024
11 Jun 2024 - 28 Jun 2024
Amount
1 APPENDIX A Protection Work
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD36905/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD32120/2023-2024:Dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
2 APPENDIX B Construction of Motorthara
OD17647/2023-2024:RING BUND -Putting up ring bund of top width 1.50m, bottom width 2.75m.and average height of 2.50m with 1:1/4 side slope and protect the sides with coconut post of 4.50m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of weiling pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Seperation memebrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and weiling pieces using reeper and nails in full height including tying properly using iron wire and coir altogether and supply and filling inside with hard clay/cut earth up to 2.50m, levell and conveyed with all leads and lifts including consolidating properly and maintaing the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site. Bottom width 2.75m, Height 2.5m Side slope 1:1/4 Length of coconut pile 4.50m Spacing 0.75m No. of leyers 2 Length of full coconut pile required for 10m = ((10/0.75)+1)x2x4.5 = 126m Length of (1/4 split) coconut cross ties for 10m = 3x2.5 av. x 7 Nos. = 52.50 m Length of 1/4 split weiling pieces for 10m = 3x2x10 = 60m cost of full coconut post (Details vide 60.64.1), Coconut post required for 1m =126/10 = 12.6m (average length of coconut pile is 6 m and dia 25cm) Assuming cocunut post can be used 2 times No. of coconut pile required for 1m = 12.6/6 = 2.1 nos. Carriage of timber = 2.1x6x3.14x0.125x0.125 = 0.618cum Assume 3 rows wailing pieces in both sides and 3 cross ties, Total 52.60+60 -112.50m Hence for 1.0m = 112.50/10 = 11.25m 6m long coconut tree equals 24m 1/4 split coconut piles, coconut post required = 11.25/24 = 0.469nos. Carriage required = 6x3.14x0.125x0.125 = 0.294cum Sawing area for 1m = 0.375x6x2x0.25 = 1.406sq.m Carpenter II class required = (4.3/10)x1.125 = 0.4838nos Totla no.of coconut pile for 10m length @ 0.75m c/c = 10/0.75+1 = 14 nos on both sides = 14x2 = 28 nos. for 1m length = 28/10 = 2.8 nos Pile driving down length = 2.0m tot Screening the frame with polythene sheet nailed to wailing pieces and coconut post, Quantity of clay = (1.5+2.75)/2x2.50 = 5.31cum Plythene sheet require =10.3x2x2.50 =51.50 sqm For 1m = 51.5/10 = 5.15sqm length 2.0x2.8 = 5.6m Quantity of clay = (1.5+2.75)/2x2.50 = 5.31cum
OD17702/2023-2024:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD17627/2023-2024:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost conveyance labour charges etc complete.
OD17628/2023-2024:Coconut Pile - Driving down coconut pile to lines and levels through various strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end where no accesibility to hydraulic excavator through land and water bodies having minimum width upto 10 Metre
2.27:Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.
OD32172/2023-2024:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
3 APPENDIX C - Construction of Motor Shed
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.22.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
12.4.2:Providing ridges or hips width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete.0.63 mm thick with zinc coating not less than 275 gm/m2
12.1.2:Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete ( up to any pitch in horizontal / vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.0.80 mm thick with zinc coating less than 275 gm/m2
4 APPENDIX D - Clay bund
OD6095/2022-2023:Earthwork in rough excavation in or under water banking excavated clay in layers not exceeding 20 cm in depth,breaking clods and dressing up in embankment for roads ,flood banks,marginal banks and guide banks with all kinds of soil(CPWD 2.2.1-2.4-2.5+2.24.1)under excavation in stiff heavy cayal clay. Certificate :-Cetified that the observed data is prepared by taking the rates and labour charges as per current schedule of rate and has been prepared as per the actual observation at the site.all kinds of soil.
SALIMKUMAR P P
Bidder Name
SALIMKUMAR P P
4A CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1050128.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .