Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹27.5 L
EMD Value
₹28,000
Closing Date
19 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Rajkot Irrigation Division, Rajkot.
NYARI-II IRRIGATION SCHEME. Inspection & Repairing of D/S Bucket of Nyari-II Irrigation Scheme
273187
SBD-20 of 2025-26
Open
Civil - All
Works
Rajkot
4 documents required · 4 mandatory
₹1,500
Yes
Executive Engineer, Rajkot Irrigation Division Rajkot
₹28,000
Yes
5 Feb 2026
5 Feb 2026
5 Feb 2026
19 Feb 2026
5 Feb 2026
NAME OF WORK :-
Inspection & Repairing of D/S Bucket of Nyari-II Irrigation Scheme.
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Dewatering of foundation area, pits & trenches of head works and 14260.00 Hp./Hrs. 27.00 Rupees: Twenty
allied works with diesel or electrical pumping arrangement incl Seven Only.
cost of pipe lines, others materials ,labours etc complete as
directed with all lifts.
2 Preparation of spillway and allied works foundations incl. removal 142.00 Sqm. 8.90 Rupees: Eight & Ps.
of loose weathered material incl. hard rock by wedging, chiseling Ninty Only.
with all labours, tools and materials for cleaning the foundations
with compressed air and water jetting as required etc complete.
3 Drilling 25mm dia holes at distance as specified and depth upto 3 71.00 Rmt. 252.00 Rupees:Two Hundred
0mt for check dam foundation and fixing anchor bars of specified Fifty Two Only.
diameter with cement grout incl cleaning holes as directed etc
excluding cost of bars
4 Epoxy bonding of new concrete Or mortar to old surface in 142.00 Sqm. 260.00 Rupees:Two Hundred
structure with proper application of coat of resin and hardener in Sixty Only.
proportion of 2:1 by weight confirming to IS-9197 to give proper
bond between old surface new concrete Or mortar etc. complete.
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
5 Prov. & Laying in position cement concrete using cement, steel 82.00 Cum. 20408.00 Rupees:Twenty
fibre (0.3 to 0.5 mm thick and 25 mm long), sand & crushed metal Thousand Four
aggregate by machine mix incl. necessary formworks compaction Hundred Eight Only.
by mechanical vibrator curing as directed with all lead & lift etc
complete. Excluding the cost of reinforced steel.
For Bucket & end sill etc.
Concrete grade M-30 and MSA-20mm Fiber Reinforce
6 Providing & Laying in position controlled cement concrete using 32.00 Cum. 4890.00 Rupees: Four
cement sand & crushed metal aggregate by machine mix incl. Thousand Eight
necessary formworks compaction by mechanical vibratoer curing Hundred Ninty Only.
as directed with all lead and lift etc complete. Excluding the cost of
For bucket and end sill etc.
c Concrete grade M-25 and MSA-40mm (Graded)
7 Providing, cutting, bending, binding and fixing in position as per 0.36 M.T. 76574.00 Rupees: Seventy Six
drawing TMT BAR reinforcement for R.C.C. works and anchor Thousand Five
bars incl cost of black annealed 16 to 18 BWG M.S. Wire etc. Hundred Seventy
complete with all lead and lift. Four Only.
8 Earth work in embankment from borrow pits in all sort of soil and 1995.00 Cum. 165.20 Rupees:One Hundred
soft murrum or other suitable strata as directed incl breaking clods Sixty Five & Ps.
and dressing to the design section with lead upto 5.00 Km. and all Twenty Only.
lift incl.site clearance etc comp.
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
9 Rehandling the excavated stuff incl stacking as and where directed 1995.00 Cum. 59.50 Rupees: Fifty Nine &
for all sort of soil, soft murrum, hard murrum, soft rock, hard rock Ps. Fifty Only.
etc. for specified lead as under and all lift incl loading unloading
transportation etc complete without rolling and watering.
(c) Lead 500 mt. to 1 Km.
Rupees: Twenty Seven Lacs Forty Six Thousand Eight Hundred Seventy Four & Ps. Ninety Four Only.
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the
estimated rates mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be
The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of contractor. Rajkot Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender P 1 to 16.pdf
2- SBD Rep Bucket- Nyari-II P 1 to 195.pdf
3 Sch B - Rep. Bucket - Nyari-II P 196 to 198.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .