Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualify |
| 2 | Accepted-Technical UTTAR KASHI | UTTARAKHAND | 249128 | Accepted-Technical Qualify |
| 3 | Accepted-Technical 01 CHERSOO NH44 PULWAMA PULWAMA JAMMU KASHMIR 192123 | PULWAMA | JAMMU AND KASHMIR | 192123 | Accepted-Technical Qualify |
| 4 | Accepted-Technical 01 VIDYA VIHAR PHASE I KARGI ROAD DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Accepted-Technical Qualify |
Tender Value
₹53.4 L
EMD Value
₹1.1 L
Closing Date
8 Oct 2026, 2:00 pmClosed
Superintending Engineer
Electricity Civil Circle (Dehradun)
Construction of Record Room,Parking Shed, Interlocking Tile Work and Other Misc Civil Works at 33/11 KV S/S Selaqui , Dehradun.
2026_UPCL8_100847_1
ECC-48/2026-27
Open Tender
Civil Works
Percentage
120 days
As per Tender
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
E.E, ECCD Dehradun
₹1.1 L
9 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
8 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 1.001 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 Sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 71.7 | Cum | 253.27 | ₹18,159.46 |
| 1.002 | Filling available excavated earth (excluding rock) in trenches, plinth sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating Each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5m | 6.82 | Cum | 190.71 | ₹1,300.64 |
| 1.003 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 168.45 | Cum | 681.59 | ₹1,14,813.84 |
| 1.004 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 20.19 | Cum | 8,115.65 | ₹1,63,854.97 |
| 1.005 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 60.08 | Cum | 6,628.08 | ₹3,98,215.05 |
| 1.006 | Providing and laying in position specified grade of reinforced cement concrete in ratio 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level | 6.21 | Cum | 8,801.51 | ₹54,657.38 |
| 1.007 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement. 1:1:5:3 (1 cement : 2 coarse sand 4 graded stone aggregate 20 cm nominal size). | 0.13 | Cum | 10,559.92 | ₹1,372.79 |
| 1.008 | R.C.C. work in Beams, Suspended Floors, Roofs Having Slope up to 15⁰ Landing, Balconies, Shelves, Chajjas, lintel, Band, Plain Window in 1:2:4 of Cement Concrete Excluding the cost of cenering Shuttering, Finishing and Reinforcement.. | 1.07 | Cum | 11,194.85 | ₹11,978.49 |
| 1.009 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 62.43 | Sqm | 716.52 | ₹44,732.34 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TC.pdf
Tender Documents • 0.28 MB
BOQ_118859.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .