Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.7 L+₹1.1 L (14.8%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | JAMSHEER ALI P L1 | P P ABDUL KABEER L2 |
|---|---|---|---|---|---|
| 1.00Compound wall | |||||
| 1.00 | OD221268/2025-2026:Demolishing laterite masonry manually / by mechanical means including stacking of serviceable material and disposal of debris within a distance of 100m | 14 | cum | 669.36 ₹9,371.04 Lowest | 669.36 ₹9,371.04 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 12.6 | cum | 330.41 ₹4,163.17 Lowest | 330.41 ₹4,163.17 Lowest |
| 1.00 | OD221047/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 33.6 | cum | 3,668.07 ₹1,23,247.15 Lowest | 3,668.07 ₹1,23,247.15 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 14 | sqm | 354.69 ₹4,965.66 Lowest | 354.69 ₹4,965.66 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.5 | cum | 8,483.41 ₹29,691.94 Lowest | 8,483.41 ₹29,691.94 Lowest |
| 1.01 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 16.62 | cum | 7,489.25 ₹1,24,471.34 Lowest | 7,489.25 ₹1,24,471.34 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,396 | kg | 163.89 ₹2,28,790.44 Lowest | 163.89 ₹2,28,790.44 Lowest |
| 1.01 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 262.8 | cum | 409.4 ₹1,07,590.32 Lowest | 409.4 ₹1,07,590.32 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 188.5 | sqm | 339.63 ₹64,020.26 Lowest | 339.63 ₹64,020.26 Lowest |
Tender Value
₹7.6 L
EMD Value
₹19,041
Closing Date
9 Sept 2025, 5:00 pmClosed
ASSISTANT ENGINEER
Municipal office Manjeri
Annual Plan-Manjeri Municipality 2025-26 project No 1234-Girls School Hostel compound wall improvements and other related works in Ward No 33-General Civil Work
2025_LSGD_793964_12
2716147/25/4
Open Tender
Civil Works - Others
Item Rate
300 days
Manjeri
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,680
Yes
₹19,041
Yes
20 Nov 2025
3 Sept 2025
10 Sept 2025
3 Sept 2025
9 Sept 2025
3 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1311728.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .