Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹1.8 Cr+₹8.2 L (4.93%)Rejected-Finance 18 CORPORATION ROAD DEVAKOTTAI | SIVAGANGA | TAMIL NADU | 630001 | ₹1.8 Cr+₹8.2 L (4.93%) | L2 | Rejected-Finance Reject |
Tender Value
₹2 Cr
EMD Value
₹2 L
Closing Date
14 Sept 2023, 3:00 pmClosed
Executive Officer
Aravakurichi TP
SFC 2023-2024 Restoration of BT Road at Pallivasal Street/South North Road (Egg Stall to Manokaran Tea Stall), Middle Street/ South North Road-1 (Simala Medical To Kabarsthan), Middle Street/ South North Road-5 (Dharapuram Road to Egg Stall), SRO St
2023_DTP_365363_1
442/2023
Open Tender
Civil Works
Works
180 days
Aravakurichi TP
Please refer the Tender Document
3 documents required · 3 mandatory
₹0
₹2 L
Yes
23 Sept 2023
1 Sept 2023
14 Sept 2023
1 Sept 2023
14 Sept 2023
1 Sept 2023
1 Sept 2023 - 14 Sept 2023
Amount
Providing Cement Concrete Pavement with Storm Water Drain
Advance Patch works for making up the Undulation in the Existing B. T Surface to all average Thickness of 50mm to 40mm IRC mm HBG Metal Premixed with the 44 kg of 80/100 Bitumen per cum of Metal including cost and conveyance of all materials to site stacking there to departmental metric gause for Pre- Measurement as directed by the departmental officer and including cost and conveyance of bitumen which will be supplied and procured by the Contractor wise self at his own cost including handling charge for the same at both ends, heating the bitumen premixing layer temping including all labour charges for patch work and line charge for Runing and fuel charges for all loads and plants completed. and all other incedental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying Tack Coat over Existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and Laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and Laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
V MEENAL AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .