Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹65.2 LAdmitted-Finance | -34.32% | ₹65.2 L | L1 | Admitted-Finance |
| 2 | L2₹69.1 LAdmitted-Finance | -30.36% | ₹69.1 L | L2 | Admitted-Finance |
| 3 | L3₹70.5 LAdmitted-Finance | -29.00% | ₹70.5 L | L3 | Admitted-Finance |
| 4 | L4₹71.3 LAdmitted-Finance | -28.21% | ₹71.3 L | L4 | Admitted-Finance |
| 5 | L5₹72.2 LAdmitted-Finance | -27.27% | ₹72.2 L | L5 | Admitted-Finance |
Tender Value
₹99.2 L
EMD Value
₹2.0 L
Closing Date
23 Feb 2026, 6:00 pmClosed
SE WR CIRCLE KOTA
SE WR CIRCLE KOTA
Repair and Renovation of Anicut in Char Village Tehsil Digod District Kota
2026_WRDAS_537384_1
SE WR CIRCLE KOTA NITNO-05/2025-26
Open Tender
Civil Works
365 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
1000 EE WR DIV. KOTA
₹2.0 L
Yes
26 Feb 2026
11 Feb 2026
24 Feb 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
Side shuttering including propping etc. complete (to achieve finish F 2 for Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.
Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786)
Preparation of foundation of structure including removal of all loose stones, silt and final washing. By manual labour
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick
Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. (diametre) 900mm ( Excluding Labour Charges ) NP-3 Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. (diametre) 900mm (Labour Charges only)
Interlocking Paver Blocks having 80 mm thickness in M-40 grade concretee Providing and Laying 80 mm thick cement concretee blocks of M-40 Grade (Manufactured with fully mechanised dry cast process with forced action mixer whose arms revolve along the main axis and rotate about its own axis also, having humidity sensor for moisture control of w/c ratio in concretee mix. Manufactured with steel moulds(Milled and manufactured in CSI diamond or CSI Nitro process for accuracy) on steel base plate of min 16 mm thick; Having Vibration and pressing action both together with the help ofmultiple synchronised vibrators. Power of hydraulic station should be minimum 50KW for compaction and cured in controlled chambers having humidity control and automated air circulation system) spreading 25mm thick sand underneath and filling joints with sand on existing W.B.M.base, as per IS15658:2006 and all materials shall conform to MoRTH Specification Clause 602.
40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement :5 coarse sand) with joints 3mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar Red sand stone
Supplying, erecting and fixing in position specified precast RCC bench made of RCC grade M-30 consisting of 2 Nos. L shaped base support of thickness 100 mm back height 1000mm, front height 450 mm, base width 420mm and 5 Nos. RCC planks of size of 1500x100 x 50 mm and 1 Nos RCC planks of 150x200x50mm including joining all parts with galvanised nuts and bolts of suitable size. All bolts to be sealed after assembly with nice finish and appearance and level complete in all respect as per direction of engineer in charge. Every bench should have a manufacture s logo of appropriate size Engraved at suitable place.
Providing laying, spreading and compacting stone aggregates of specific size as per table 400-7 to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) / binding Materials to fill up the interstices of coarse aggregates, watering (with water browser) and rolling, making necessary earthen bund to protect edges, lighting, guarding, barricading and maintenance of Driversion etc. [MoRTH specifications : Clause 404]. By Manual Means Grading No.2 (63-45mm) Hand Broken
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (c) Hard soil mixed with Kankar / boulders, Morrum
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctors density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. (b) With lead beyond 250 m and up to 750 m (1/2 Km) Deduct in item no 5.16.1 to 5.16.4 above if Standard Proctors density to be achieved is at least 95%
Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/ vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. (i) at least 95% of Standard Proctors density
Watering of earth including cost of carriage of water when source of water is (a) up to 1 Km
Supplying and laying aggregate in layers and profile as specified including all leads & lifts. This item is to be used only for laying filter / inverted filter (b) Broken ballast 20 to 40 mm size
Supplying stone, spall and laying Rip rap in required profile properly hand packed using stone of specified size including all lead & lifts (a) 23 cm thickness (plus minus 5 % thickness tolerance)
Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of dewatering wherever required and all applicable taxes and levies etc. complete in all respect (a) Earth / Soil Cum
R. R. stone masonry (where 90 % stones weighing not less than 37.5 kg and no dimension to be less than 23 cm.) for foundation including all leads of all construction materials including curing etc. complete In cement sand mortar 1:4
Plaster in cement sand mortar 1:3 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: (b) 20 mm
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 40 mm
Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_957512.xls
BOQ • 0.26 MB
Financial-Bid-Char-Anitu.pdf
Tender Documents • 1.79 MB
Download all tender documents and submit your bid