Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 CrAdmitted-Finance COLLEGE CHOWMUHANI JIRANIA WEST TRIPURA | L1 | Admitted-Finance | |
| 2 | L2₹15.8 Cr+₹2.6 Cr (20.2%)Admitted-Finance NO 2 2ND FLOOR PLOT NO 70A 31 LAXMI NAGAR LAXMI NAGAR DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical SHIBNAGAR AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799001 | - | Rejected-Technical Technically Non Responsive | |
| 4 | Rejected-Technical VILL BOULAPASSA KAILASHAHAR UNAKOTI TRIPURA | UNAKOTI | TRIPURA | 799263 | - | Rejected-Technical Technically Non Responsive |
| Sl No | Description | Qty | Unit | Asish Debnath L1 | PRAGYAWAN TECHNOLOGIES LIMITED L2 |
|---|---|---|---|---|---|
| 1.00A. Supply: Construction of 33 KV Line | |||||
| 1.01 | 11 Mtr. Long Full Galvanised Steel Tubular Pole | 930 | No | 22,018.8 ₹2,04,77,484 Lowest | 24,644 ₹2,29,18,920 |
| 1.02 | 9 Mtr. Long Full Galvanised Steel Tubular Pole | 2,170 | No | 15,177.16 ₹3,29,34,437.2 Lowest | 15,221 ₹3,30,29,570 |
| 1.03 | GI Stay Set Complete HT-20 sqmm | 2,000 | Set | 1,169.38 ₹23,38,760 Lowest | 1,740 ₹34,80,000 |
| 1.04 | Stay Insulator 33 KV | 2,000 | No | 88.5 ₹1,77,000 Lowest | 268 ₹5,36,000 |
| 1.05 | GI Stay Wire 7/4 mm | 10 | MT | 86,140 ₹8,61,400 Lowest | 1,06,548 ₹10,65,480 |
| 1.06 | PG Clamp | 1,000 | No | 43.66 ₹43,660 Lowest | 248 ₹2,48,000 |
| 1.07 | 33 KV Polymer Composite Pin Isulator | 6,900 | No | 619.5 ₹42,74,550 | 580 ₹40,02,000 Lowest |
| 1.08 | 33 KV Polymer Composite 70 KN Disk Isulator | 14,400 | No | 348.1 ₹50,12,640 Lowest | 649 ₹93,45,600 |
| 1.09 | 33 KV Disc Fittings (7/3.8) | 4,800 | Set | 295 ₹14,16,000 Lowest | 420 ₹20,16,000 |
Tender Value
₹17.6 Cr
EMD Value
₹29.8 L
Closing Date
23 Dec 2025, 5:00 pmClosed
DGM, ED - Manu
O/o the DGM, ED - Manu
Extension of 33 KV Line from 33 KV Sub-Station Chawmanu along with installation of necessary equipments and installation of 16 Nos. 33/0.4 KV, 100 KVA Distribution Transformer at 16 Nos. BOPs under ESD - Chawmanu
2025_POWER_68283_1
NIeT. No.DGM/ED/MNU/2025-26/04 dt.11.12.2025.
Open Tender
Electrical Works
Turn-key
365 days
Extension of 33 KV Line from 33 KV Sub-Station Cha
As per NIeT
2 documents required · 2 mandatory
₹10,000
₹29.8 L
20 Apr 2026
12 Dec 2025
24 Dec 2025
12 Dec 2025
23 Dec 2025
12 Dec 2025
12 Dec 2025 - 19 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A. Supply: Construction of 33 KV Line | |||||
| 1.01 | 11 Mtr. Long Full Galvanised Steel Tubular Pole | 930 | No | - | - |
| 1.02 | 9 Mtr. Long Full Galvanised Steel Tubular Pole | 2,170 | No | - | - |
| 1.03 | GI Stay Set Complete HT-20 sqmm | 2,000 | Set | - | - |
| 1.04 | Stay Insulator 33 KV | 2,000 | No | - | - |
| 1.05 | GI Stay Wire 7/4 mm | 10 | MT | - | - |
| 1.06 | PG Clamp | 1,000 | No | - | - |
| 1.07 | 33 KV Polymer Composite Pin Isulator | 6,900 | No | - | - |
| 1.08 | 33 KV Polymer Composite 70 KN Disk Isulator | 14,400 | No | - | - |
| 1.09 | 33 KV Disc Fittings (7/3.8) | 4,800 | Set | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.81 MB
BOQ_69475.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .