| 1 | L1₹8.8 LAccepted-AOC | L1 | Accepted-AOC Work Award Issued | |
| 2 | L2₹9.3 L+₹49,937 (5.70%)Rejected-Finance VILLAGE BUDHAR PO ALOH TEHSIL RAKKAR DISTT KANGRA HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 175013 | L2 | Rejected-Finance HIGEST AMOUNT | |
| 3 | L3₹9.6 L+₹78,337 (8.94%)Rejected-Finance VILL ATHMAN PO AMB TEH AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | L3 | Rejected-Finance HIGEST AMOUNT | |
| 4 | L4₹10.8 L+₹2.0 L (22.6%)Rejected-Finance HIMACHAL PRADESH | L4 | Rejected-Finance HIGEST AMOUNT | |
| 5 | L5₹10.9 L+₹2.1 L (23.9%)Rejected-Finance | L5 | Rejected-Finance HIGEST AMOUNT |
| Sl No | Description | Qty | Unit | Sandeep Kumar Dhiman L3 | VISHAL DHIMAN GOVT CONTRACTOR L4 | ARVIND SINGH RANA L2 | NAVEEN PARBHAKAR L7 | lucky kapoor L6 | Ram Dhan L8 | sunandni joshi L5 | Ashna Ventures (OPC) Pvt. Ltd. L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for road way in hilly areas in all heights and depths and in all kinds of soil by manual/ mechanical means, including saturated soil comprising of ordinary soil, ordinary rock, soft rock, hard rock chiseling wedging out of rock (where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the required lines grades, width, cutting and trimming of side slopes, camber, super elevation and levels shown as per the drawings and as directed by the Engineer-in Charge complete in according to MORD Technical Specification section 300 & 1600 and sorting out and stacking of useful materials with in all leads and lifts of material in acquired road width and transporting of un-useful materials for filling in road ways, camber, embankments for grade improvements and disposal of all surplus materials to the approved dumping sites through all modes of transportation including head load or animal transport or by mechanical means including leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stones to the tune of 476.00 cubic metre quantity at the rate of Rs. 300/- only (Rupees three hundred only) per cubic meter shall be effected from the contractor running bills on pro-rata basis as per actual quantity executed. Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him to the extent of damage occurred in all cases. The rate is including Octroi, Royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | 4,757.4 | Cubic metre | 105 ₹4,99,527 | 163 ₹7,75,456 | 100 ₹4,75,740 Lowest | 138 ₹6,56,521 | 175 ₹8,32,545 | 127 ₹6,04,190 | 130 ₹6,18,462 | 115 ₹5,47,101 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 as directed by the Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rate is including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government. | 1,686.45 | Cubic metre | 190 ₹3,20,426 | 80 ₹1,34,916 | 140 ₹2,36,103 | 180 ₹3,03,561 | 65 ₹1,09,619 Lowest | 235 ₹3,96,316 | 190 ₹3,20,426 | 90 ₹1,51,781 |
| 3.00 | Earth work in excavation in foundation for all types of structures such as retaining walls, breast walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, including saturated soil comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/ wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown on the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and obstructions necessary for placing the foundations, trimming, leveling ramming and watering bottom of excavation and backfilling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 15cm (fifteen centimeter) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and MORD Technical Specification clause 305.1 and as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. | 69.4 | Cubic metre | 120 ₹8,328 | 170 ₹11,798 | 220 ₹15,268 | 140 ₹9,716 | 130 ₹9,022 | 90 ₹6,246 Lowest | 130 ₹9,022 | 150 ₹10,410 |
| 4.00 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) for plain cement concrete, in or under water in open foundation for all types of structures, including pumping or bailing out water/ dewatering (surface/sub-soil water) and including removal of slush which may arise at the time of laying under water for all heights/depth and any quantum of water including cost of form work and curing complete as per drawing and MORD technical specification 802, 803, 1202 & 1203 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of material with in all leads lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government. | 3.8 | Cubic metre | 3,200 ₹12,160 | 3,500 ₹13,300 | 4,600 ₹17,480 | 3,000 ₹11,400 | 2,700 ₹10,260 Lowest | 3,500 ₹13,300 | 3,800 ₹14,440 | 3,500 ₹13,300 |
| 5.00 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade M-15 (M-Fifteen) Nominal mix 1:2½:5 (one cement isto two and half sand isto five graded crushed stone aggregate (40mm) forty millimeter nominal size) in open foundation or under water, including pumping or bailing out water/ dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying under water, for all heights/depths and any quantum of water, in open foundation etcetera including cost of form work and curing complete as per MORD technical specification section 800, 900 & 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government. | 19.18 | Cubic metre | 3,600 ₹69,048 | 4,200 ₹80,556 | 5,900 ₹1,13,162 | 3,800 ₹72,884 | 3,900 ₹74,802 | 3,500 ₹67,130 Lowest | 4,800 ₹92,064 | 4,800 ₹92,064 |
| 6.00 | Providing and laying (to level or slope) 900mm dia (Nine hundred millimeter) diametre reinforced cement concrete light duty non pressure pipes IS Class NP-2 for culverts on first class bedding or granular material in single row including fixing collar with cement mortar 1:2 (One cement isto two sand) but excluding the cost of excavation, protection works, back filling, pipe bedding concrete and masonry work in head walls and parapets as per drawing and M.O.R.D. technical specifications clause 1101.5 and as per direction of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidental. The rate including octroi, royality, Malkana, GST, toll tax, sale tax or other taxes imposed by the Government. | 15 | Running metre | 2,900 ₹43,500 | 3,800 ₹57,000 | 4,400 ₹66,000 | 3,400 ₹51,000 | 3,500 ₹52,500 | 3,500 ₹52,500 | 2,000 ₹30,000 Lowest | 3,900 ₹58,500 |
| 7.00 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade-M20 (M-Twenty) Nominal mix 1:2:4 (one cement isto two sand isto four graded crushed stone aggregate (40mm) forty millimeter nominal size) in or under water in open foundation for all types of structure and the like in Catchpit flooring etcetera, including cost of form work and curing complete as per drawing and MORD technical specification section 800, 900 & 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including pumping or bailing out water/dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying under water for all heights/depths and any quantum of water complete including carriage of materials up to all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government. | 0.44 | Cubic metre | 4,600 ₹2,024 | 4,500 ₹1,980 | 6,500 ₹2,860 | 4,000 ₹1,760 | 2,500 ₹1,100 Lowest | 3,500 ₹1,540 | 5,000 ₹2,200 | 8,000 ₹3,520 |
Tender Value
₹14.5 L
EMD Value
₹30,000
Closing Date
19 Oct 2023, 5:00 pmClosed
EE KOTLA BEHAR DIVISION HPPED
EE KOTLA BEHAR DIVISION HPPED
CONSTRUCTION OF KANOL TO KALAKKAD ROAD KM 0.0 TO 1.390 SUB HEAD FORMATION CUTTING AT RD 0.0 TO 1.390 C.O 900MM DIA HUME PIPE CULVERT AT RD 0.434 TO 0.890 UNDER OTMNP
2023_PWD_80167_1
TENDER NOTICE NO 3519-23 DATED 4.10.2023
Open Tender
Civil Works
Item Rate
90 days
KOTLA BEHAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹30,000
24 Mar 2026
12 Oct 2023
20 Oct 2023
12 Oct 2023
19 Oct 2023
12 Oct 2023
Amount
Excavation for road way in hilly areas in all heights and depths and in all kinds of soil by manual/ mechanical means, including saturated soil comprising of ordinary soil, ordinary rock, soft rock, hard rock chiseling wedging out of rock (where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the required lines grades, width, cutting and trimming of side slopes, camber, super elevation and levels shown as per the drawings and as directed by the Engineer-in Charge complete in according to MORD Technical Specification section 300 & 1600 and sorting out and stacking of useful materials with in all leads and lifts of material in acquired road width and transporting of un-useful materials for filling in road ways, camber, embankments for grade improvements and disposal of all surplus materials to the approved dumping sites through all modes of transportation including head load or animal transport or by mechanical means including leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stones to the tune of 476.00 cubic metre quantity at the rate of Rs. 300/- only (Rupees three hundred only) per cubic meter shall be effected from the contractor running bills on pro-rata basis as per actual quantity executed. Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be compensated by him to the extent of damage occurred in all cases. The rate is including Octroi, Royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 as directed by the Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rate is including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
Earth work in excavation in foundation for all types of structures such as retaining walls, breast walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, including saturated soil comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/ wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown on the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and obstructions necessary for placing the foundations, trimming, leveling ramming and watering bottom of excavation and backfilling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 15cm (fifteen centimeter) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and MORD Technical Specification clause 305.1 and as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals.
Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) for plain cement concrete, in or under water in open foundation for all types of structures, including pumping or bailing out water/ dewatering (surface/sub-soil water) and including removal of slush which may arise at the time of laying under water for all heights/depth and any quantum of water including cost of form work and curing complete as per drawing and MORD technical specification 802, 803, 1202 & 1203 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of material with in all leads lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade M-15 (M-Fifteen) Nominal mix 1:2½:5 (one cement isto two and half sand isto five graded crushed stone aggregate (40mm) forty millimeter nominal size) in open foundation or under water, including pumping or bailing out water/ dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying under water, for all heights/depths and any quantum of water, in open foundation etcetera including cost of form work and curing complete as per MORD technical specification section 800, 900 & 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
Providing and laying (to level or slope) 900mm dia (Nine hundred millimeter) diametre reinforced cement concrete light duty non pressure pipes IS Class NP-2 for culverts on first class bedding or granular material in single row including fixing collar with cement mortar 1:2 (One cement isto two sand) but excluding the cost of excavation, protection works, back filling, pipe bedding concrete and masonry work in head walls and parapets as per drawing and M.O.R.D. technical specifications clause 1101.5 and as per direction of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidental. The rate including octroi, royality, Malkana, GST, toll tax, sale tax or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade-M20 (M-Twenty) Nominal mix 1:2:4 (one cement isto two sand isto four graded crushed stone aggregate (40mm) forty millimeter nominal size) in or under water in open foundation for all types of structure and the like in Catchpit flooring etcetera, including cost of form work and curing complete as per drawing and MORD technical specification section 800, 900 & 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including pumping or bailing out water/dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying under water for all heights/depths and any quantum of water complete including carriage of materials up to all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
ARVIND SINGH RANA
Sandeep Kumar Dhiman
VISHAL DHIMAN GOVT CONTRACTOR
sunandni joshi
lucky kapoor
NAVEEN PARBHAKAR
Ram Dhan
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .