Tender Value
Refer Docs
Closing Date
25 Jun 2024, 3:00 pmClosed
PR & CC
This Tender is for Civil, Electrical and Mechanical Jobs for development of new outlet as well as
2400013145-HD-09050
5100013145
Open Tender
Bilaspur, Himachal Pradesh
25 Jun 2024
4 Jun 2024
25 Jun 2024
25 Jun 2024
5 Jun 2024 - 15 Jun 2024
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | SITE CLEARANCE | SITE CLEARANCE — rface dressing of the ground including removing smallplants, bushes,vegetation (dia less than 4") and makingsurface levelled and dis salof rubbish outside HPCL'spremises to an unobjectionableplace, asdirected by theEngineer in Charge | - | square meter |
| 2 | EXCAVATION IN EARTH | EXCAVATION IN EARTH — cavation for foundation upto required depth belowexisting ground level up to 1.5m in any tyoe odf soilexcept hard rock. Rate to incl e dressing the sides andbottom, bailing out of water if encountered, shoring,strutting, backfilling after the construction offoundat n, trenches/plinth beam etccompacting by the sideof the foundation and disposal of surplus excavated earthwithin/outside HPCL's prem es to an unobjectionable place,as directed by the Engineer in Charge including spreading,watering and compaction, complete. The meas ement of theexcavation would be based on actual depth of excavationwith applicable rate for different depths. | - | cubic meter |
| 3 | EXCAVATION - 1.5 TO | EXCAVATION - 1.5 TO — cavation for foundation upto required depth below groundlevel in any type of soil except hard rock . Rate toinclude dressing the sid and bottom, bailing out of waterif encountered, shoring, strutting, backfilling after theconstruction of foundation, foundation, tr ches/plinthbeam etc compacting by the side of the foundation anddisposal of surplus excavated earth within/outside HPCL'spremises to n unobjectionable place, as directed by theEngineer in Charge including spreading, watering andcompaction, complete . The measuremen of the excavationwould be based on actual depth of excavation withapplicable rate for different depths.EXCAVATION IN EARTHUPTO 3 M | - | cubic meter |
| 4 | EXCAVATION - 3 TO 4. | EXCAVATION - 3 TO 4. — cavation for foundation upto required depth below groundlevel in any type of soil except hard rock . Rate toinclude dressing the sid and bottom, bailing out of waterif encountered, shoring, strutting, backfilling after theconstruction of foundation, compacting by e side of thefoundation and disposal of surplus excavated earthwithin/outside HPCL's premises to an unobjectionable place,as directe by the Engineer in Charge including spreading,watering and compaction, complete . The measurement of theexcavation would be based on ctual depth of excavationwith applicable rate for different depths. EXCAVATION INEARTH BETWEEN 3 TO 4.5 | - | cubic meter |
| 5 | EXCAVATION- HARD ROC | EXCAVATION- HARD ROC — cavation for foundation upto required depth belowexisting ground level up to 1.5 m. depth in concrete roadby chiselling / pneumatic illing . Rate to includedressing the sides and bottom, bailing out of water ifencountered, shoring, strutting, backfilling after the obto restore the original state of the ground and disposal ofsurplus excavated earth within/outside HPCL's premises toan unobjection le place, as directed by the Engineer inCharge including curing, watering and compaction andcomplete . The measurement of the excava on would be basedon actual depth of excavation. | - | cubic meter |
| 6 | -EXCAVA-HARDROCK 1.5 | -EXCAVA-HARDROCK 1.5 — xcavation for foundation upto required in hard rock andexcavation shall be done by chiselling / pneumatic drillingorBlasting. Rate t include dressing the sides and bottom,bailing out of water if encountered, shoring,strutting,backfilling after the construction offo dation, trenches/plinth beam etc compacting by the sideof the foundation and disposal of surplus excavated earthwithin/outside HPCL' premises to an unobjectionable place,as directed by the Engineer in Charge including spreading,watering and compaction, complete . T measurement of theexcavation would be based on actual depth of excavationwith applicable rate for different depths. EXCAVATION INHA ROCK 1.5 mts- 3.0 mts" | - | cubic meter |
| 7 | -EXCAVA-HARD ROCK 3. | -EXCAVA-HARD ROCK 3. — cavation for foundation upto required in hard rock andexcavation shall be done by chiselling / pneumatic drillingor Blasting. Rate t include dressing the sides and bottom,bailing out of water if encountered, shoring, strutting,backfilling after the construction of undation,compacting by the side of the foundation and disposal ofsurplus excavated earth within/outside HPCL's premises toan unobjec onable place, as directed by the Engineer inCharge including spreading, watering and compaction,complete . The measurement of the ex vation would be basedon actual depth of excavation with applicable rate fordifferent depths. EXCAVATION IN HARD ROCK BETWEEN 3 TO 4. | - | cubic meter |
| 8 | SAND FILLING - LAYER | SAND FILLING - LAYER — pply and filling with clean silver / river sand ofapproved quality in layers of 150 mm each includingspreading, compacting by hand r ming and watering etc, allcomplete as per direction of Engg.-In-Charge. Measurementbasis compacted thickness only. | - | cubic meter |
| 9 | CRUSHEDSTONESAND FIL | CRUSHEDSTONESAND FIL — pply and filling with Crush Sand as per IS 21116-1980-2 &IS 486:2000 & IS 383.1970 The particle shape is semirounded or cubical & no flakey or elongated. Dustpercentage is strictly controlled 10 - 15% with finenessmodulus 2.6 to 3. Supply and filling with Stone Cru edsand of approved quality in layers of 150 mm each includingspreading, compacting by hand ramming and watering etc, allcomplete as r direction of Engg.-In-Charge. compactedthickness only | - | cubic meter |
| 10 | MURRUM FILLING - LAY | MURRUM FILLING - LAY — pplying and filling good quality murum in layers of 150mm thick including watering and compacting till maximumcompaction is achieved s directed by Engineer InCharge.Compacted volume shall be considered for payment. | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2400013145-HD-09050.pdf
TENDER_DOCUMENT • 46.15 MB
Download all tender documents and submit your bid