| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52.5 LAdmitted-Finance | -0.10% | ₹52.5 L | L1 | Admitted-Finance |
| 2 | L1₹52.5 LAdmitted-Finance AT PATRAPADA DIST SUNDARGARH | SUNDARGARH | -0.10% | ₹52.5 L | L1 | Admitted-Finance |
| 3 | L1₹52.5 LAdmitted-Finance | -0.10% | ₹52.5 L | L1 | Admitted-Finance |
Tender Value
₹52.5 L
EMD Value
₹52,550
Closing Date
3 Aug 2026, 5:00 pmClosed
Executive Officer, Sundargarh Municipality
Executive Officer, Sundargarh Municipality
Improvement of road from PWD main road towards community centre in Ward No. 07
2026_ORULB_136372_1
SNGM-06/2026-27
Open Tender
Civil Works - Others
Percentage
Sundargarh Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹52,550
Yes
28 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the EIC. | 355.32 | CUM | 230.74 | ₹81,986.54 |
| 2 | Supplying, stacking, providing all labour, T&P, spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including all cost of materials, labour, conveyance, royalty, Tools and Plants etc. all complete, required for the work to finished items of work. 18 | 118.44 | CUM | 843.01 | ₹99,846.1 |
| 3 | Cleaning the existing granular base surface including removal of binding materials and other foreign materials with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/ or compressed air to receive bituminous including cost and conveyance of materials T&P etc. 222 | 5,922 | sqm | 5.47 | ₹32,393.34 |
| 4 | Labour for applying tack coat including cost and conveyance of materials T&P, cost of Bitumen etc. 225 | 11,844 | sqm | 28.85 | ₹3,41,699.4 |
| 5 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of Grading II (19 mm nominal size) premixed with bituminous binder of 60/70 penetration grade of bitumen,transported to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to therequired grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 504 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including cost and conveyance of materials T&P cost and conveyance of bitumen,etc complete. 242 | 296.1 | CUM | 7,867.76 | ₹23,29,643.74 |
| 6 | Providing and laying semi dense bituminous concrete with batch type hot mix plant using crushed aggregates of Grading II (10 mm nominal size) premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheelede, libratory and tandem rollers to achieve the desired compaction as per Clause 508 of M oSRT&H Specifications for Road & Bridge works (4th Revision) including cost and conveyance of materials T&P etc. 245 | 148.05 | CUM | 10,082.25 | ₹14,92,677.11 |
| 7 | "Transporting the excavated earth (stack) by mechanical means within 5.00 km lead, lift including loading & unloading etc all complete. 19 " | 248.72 | cum | 278.77 | ₹69,335.67 |
| 8 | Providing,laying, spreading and compacting graded stone aggregates to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant,carriage of mixed material by tripper to site,laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with 3 wheeled steel roller 8-10 tonnesto achieve the desired density as per Clause 406 of MoSRT&H Specification for Road & Bridge works (4th Revision) including cost and conveyance of materials T&P etc (See Page no-166,Item no 42 of AoR-06) | 340.62 | cum | 2,355.62 | ₹8,02,371.28 |
| 9 | Cost of disply board, Paint & Letter writing over disply board - LS 303 | 1 | NOS | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_602256.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .