Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-THE BIDDER HAS FURNISHED EXPERIENCE CERTIFICATE OF 01 YEAR ONLY INSTEAD OF MINIMUM 02 YEARS. |
Tender Value
Refer Docs
Closing Date
24 Aug 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer ECSD Pampore KPDCL
OFFICE OF THE EXECUTIVE ENGINEER ECSD PAMPORE
RATE CONTRACT/ LABOUR CONTRACT FOR HANDLING OF MATERIALS IN ECSD PAMPORE FOR 2021-22
2021_PDD_132802_1
NIT NO ECSD 03 TS of 2021 Labour Contract
Open Tender
Miscellaneous Services
Fixed-rate
365 days
ECSD PAMPORE
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
SE Procurment Circle Bemina Srinagar
Exempted
23 Sept 2021
2 Aug 2021
27 Aug 2021
3 Aug 2021
24 Aug 2021
7 Aug 2021
4 Aug 2021 - 6 Aug 2021
180 days
Electrical Items :
Unloading of Poles:- Poles:Unloading of Steel Tubular / Cement Poles by Manual/Mechanical means, Verification/testing of materials and Stacking of same.
S.T.Poles 8 mtr
S.T.Poles 9 mtr
S.T.Poles 11 mtr
S.T.Poles 13 mtr
P.C.C. Pole 8 Mtr
Shifting of Poles:- Poles:shifting of Steel Tubular / Cement Poles by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material and then proper stacking of material.
S.T.Poles 8 mtr
S.T.Poles 9 mtr
S.T.Poles 11 mtr
S.T.Poles 13 mtr
P.C.C. Pole 8 Mtr
Loading of Poles:- Poles:Carriage of Steel Tubular / Cement Poles by Manual/Mechanical means from stacking site and loading of same on trucks.
S.T.Poles 8 mtr
S.T.Poles 9 mtr
S.T.Poles 11 mtr
S.T.Poles 13 mtr
P.C.C. Pole 8 Mtr
Unloading of Conductor:- Conductor:Unloading of ACSR Conductor drums by Manual/Mechanical means, Verification/testing of materials and Storage of same.
ACSR 0.02Cond. (Squirrel)Avg. 11Km/Drum
ACSR 0.03 Cond. (Weasel)Avg. 8.0Km/Drum
ACSR 0.05 Cond. (Rabbit)Avg. 5.0Km/Drum
ACSR 0.1 Cond (Dog)Avg. 2.5Km/Drum
ACSR 0.15 Cond (wolf )Avg. 0.5Km/Drum
ACSR 0.2 Cond (Panther )Avg. 11Km/Drum
ACSR 0.4 Cond (zebra )Avg. 0.5Km/Drum
Shifting of Conductor:- ACSR Conductors:shifting of ACSR Conductor Drums by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material and stacking of material.
ACSR 0.02Cond. (Squirrel)Avg. 11Km/Drum
ACSR 0.03 Cond. (Weasel)Avg. 8.0Km/Drum
ACSR 0.05 Cond. (Rabbit)Avg. 5.0Km/Drum
ACSR 0.1 Cond (Dog)Avg. 2.5Km/Drum
ACSR 0.15 Cond (wolf )Avg. 0.5Km/Drum
ACSR 0.2 Cond (Panther )Avg. 11Km/Drum
ACSR 0.4 Cond (zebra )Avg. 0.5Km/Drum
Loading of Conductor:- Carriage of ACSR Conductor Drums from Storage Site to Loading Site and Loading of same into Truck
ACSR 0.02Cond. (Squirrel)Avg. 11Km/Drum
ACSR 0.03 Cond. (Weasel)Avg. 8.0Km/Drum
ACSR 0.05 Cond. (Rabbit)Avg. 5.0Km/Drum
ACSR 0.1 Cond (Dog)Avg. 2.5Km/Drum
ACSR 0.15 Cond (wolf )Avg. 1.5Km/Drum
ACSR 0.2 Cond (Panther )Avg. 1.1Km/Drum
ACSR 0.4 Cond (zebra )Avg. 0.5Km/Drum
Unloading of Transformers:- Transformers: Unloading of Transformers by Manual/Mechanical means, Verification of materials and Carriage to Storage site including Storage of same.
25- KVA S/R Transformers
63 KVA Distb..Transformer
100 KVA S/R Transformer
200 KVA S/R Transformer
250 KVA S/R Transformer
400 KVA S/R Transformer
630 KVA S/R Transformer
6.3 MVA Power Transformer
10 MVA Power Transformer
Testing of Transformers:- carriage from storage site to testing site,testing of transformers for losses, carriage back upto stacking site & stacking of same.
25- KVA S/R Transformers
63 KVA Distb..Transformer
100 KVA S/R Transformer
200 KVA S/R Transformer
250KVA S/R Transformer
400 KVA S/R Transformer
630 KVA S/R Transformer
Shifting of Transformers:- Transformer:-shifting of Transformers by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material.
25- KVA S/R Transformers
63 KVA Distb..Transformer
100 KVA S/R Transformer
200 KVA S/R Transformer
250KVA S/R Transformer
400 KVA S/R Transformer
630 KVA S/R Transformer
6.3 MVA Power Transformer
10 MVA Power Transformer
Loading of Transformers:- Carriage of transformers from storage site to loading Site and Loading of same into Truck
25- KVA S/R Transformers
63 KVA Distb..Transformer
100 KVA S/R Transformer
200 KVA S/R Transformer
250KVA S/R Transformer
400 KVA S/R Transformer
630 KVA S/R Transformer
6.3 MVA Power Transformer
10 MVA Power Transformer
Unloading of PVC Cables:- Unloading of PVC Cable Drums by manual/ mechanical means. Verification/ testing of materials & carriage to storage site including storage of the same.
185 Sqmm 1 core PVC Cable
240 Sqmm 1 core PVC Cable
300 Sqmm 1 Core PVC Cable
ABC 120 mm Sq. 5 Core PVC Cable
120 Sqmm 1-core PVC Cable
95 Sqmm 1-core PVC Cable
50 Sqmm 1-core PVC Cable
10 Sqmm 1-core PVC Cable
6 Sqmm 1-core PVC Cable
70 Sqmm 1-core PVC Cable
16 Sqmm 2-core PVC Cable
10 Sqmm 2-core PVC Cable
50 sqmm 1.1 grade ariel bunched Cable 5-core
35 sqmm 1-core PVC Cable
185 Sqmm 3.5 core Cable
Shifting of PVC Cables:- PVC cables:-shifting of PVC Cable Drums by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material.
185 Sqmm 1 core PVC Cable
240 Sqmm 1 core PVC Cable
300 Sqmm 1 Core PVC Cable
ABC 120 mm Sq. 5 Core PVC Cable
120 Sqmm 1-core PVC Cable
95 Sqmm 1-core PVC Cable
50 Sqmm 1-core PVC Cable
10 Sqmm 1-core PVC Cable
6 Sqmm 1-core PVC Cable
70 Sqmm 1-core PVC Cable
16 Sqmm 2-core PVC Cable
10 Sqmm 2-core PVC Cable
50 sqmm 1.1 grade ariel bunched Cable 5-core
35 sqmm 1-core PVC Cable
185 Sqmm 3.5 core Cable
Loading of PVC Cables:- Carriage of PVC Cable Drums from Storage Site to Loading Site and Loading of same into Truck
185 Sqmm 1-core PVC Cable
240 Sqmm 1 core PVC Cable
300 Sqmm 1 Core PVC Cable
ABC 120 mm Sq. 5 Core PVC Cable
120 Sqmm 1-core PVC Cable
95 Sqmm 1-core PVC Cable
50 Sqmm 1-core PVC Cable
10 Sqmm 1-core PVC Cable
6 Sqmm 1-core PVC Cable
70 Sqmm 1-core PVC Cable
16 Sqmm 2-core PVC Cable
10 Sqmm 2-core PVC Cable
50 sqmm 1.1 grade ariel bunched Cable
35 sqmm 1-core PVC Cable
185 Sqmm 3.5 core Cable
Unloading of VCB & C&R Panels:- VCB & C&R Panels:Unloading of 11KV VCB Panels by Manual/Mechanical means, Verification/testing of materials and Carriage to Storage site including Storage of same.
11 KV VCB Pannels (INCOMER)
11 KV VCB Pannels (out going)
33 KV C&R Pannel
Shifting of VCB & C&R Panels:- VCB & C&R Panels:-shifting of 11KV VCB Panels by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material.
11 KV VCB Pannels (INCOMER)
11 KV VCB Pannels (out going)
33 KV C&R Pannel
Loading of VCB & C&R Panels:- VCB & C&R Panels: Carriage of 11KV VCB Panels from Storage Site to Loading Site and Loading of same into Truck
11 KV VCB Pannels (INCOMER)
11 KV VCB Pannels (out going)
33 KV C&R Pannel
Unloading of Other key Materials:- Other key Materials: Unloading of below key materials by Manual/Mechanical means, Verification/testing of materials and Carriage to Storage site including Storage of same.
Transformers Oil Fresh (in barrels of 209 litres)
11KV Horn Gap Fuse sets
11 KV Disc Insulators
11 KV Pin Insulators
LT Shackle Insulators
sundry Materials
Shifting of other key Materials:- Other key Materials:-shifting of below key materials by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material and stacking of materials.
Transformers Oil Fresh (in barrels of 209 litres)
11KV Horn Gap Fuse sets
11 KV Disc Insulators
11 KV Pin Insulators
LT Shackle Insulators
sundry Materials
Loading of other key materials:- Other key Materials: Carriage of material from Storage Site to Loading Site and Loading of same into Truck
Transformers Oil Fresh (in barrels of 209 litres)
11KV Horn Gap Fuse sets
11 KV Disc Insulators
11 KV Pin Insulators
LT Shackle Insulators
sundry Materials
Unloading of Meters:- Meters:Unloading of Meters by Manual/Mechanical means, Verification/testing of materials and Carriage to Storage site including Storage of same.
10-60 Amp. 1-Phase Energy Meters
20-80 Amp. 3-Phase Energy Meters
Shifting of Meters:- Meters:-shifting of Meters by Manual/Mechanical means in order to create/clear the space in case it is not available for dumping of further incoming material.
10-60 Amp. 1-Phase Energy Meters
20-80 Amp. 3-Phase Energy Meters
Loading of Meters:- Meters: Carriage of Meters from Storage Site to Loading Site and Loading of same into Truck
10-60 Amp. 1-Phase Energy Meters
20-80 Amp. 3-Phase Energy Meters
FAROOQ AHMAD LONE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .