Tender ID
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
2 Apr 2026, 3:00 pmClosed
The Commissioner, Tiruchirappalli City Corporation
Bharathidasan Road, Cantonment, Trichy - 620 001
CONSTRUCTION OF RETAINING WALL WIH PAVER BLOCK AND FENCING ARRANGEMENTS IN KFW NEW PUMP HOUSE AT KAMBARASAMPETTAI.
2026_MAWS_675236_1
TN450/2025-26 SERIAL NO.1
Open Tender
Civil Works
Works
90 days
MPS
CONDITION
3 documents required · 3 mandatory
₹7,080
₹22,000
23 Mar 2026
23 Mar 2026
2 Apr 2026
23 Mar 2026
2 Apr 2026
23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork excavation for foundation by manual means for Isolated,Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering,bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10mts and initial lift of 2.00mts and clearing and levelling the site etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 2Supplying and filling in foundation,basement etc with filling crushed stone sand in layers of not more than 15cm thick well watered,rammed and consolidated etc complete complying with standard specification and as directed by the departmental officers. | |||||
| 3Cement Concrete 1:5:10 (One Cement,Five crushed stone sand and Ten hard brocken stone jelly) using 40mm gauge hard brocken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15cm thick well rammed,consolidated and including curing etc complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | |||||
| 4Brickwork in following Cement Mortar using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer,curing,etc complete complying with standard specification and as directed by the departmental officers.Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 4.01 | Basement | - | m3 | - | - |
| 4.02 | Gournd Floor | - | m3 | - | - |
| 5Supplying and erecting steel centering including necessary supports for plane surfaces such as rectangular or square RCC columns etc which require only nominal strutting using mild steel sheets made of 10gauge thick welded with MS angle size 40x40x5mm and supported by Steel Adjustable Telescopic Props of Size 2x2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) etc complete in all floors complying with standard specifcation.Steel Adjustable telescopic props shall be provided as directed by the departmental Officers.(Payment for centering shall be given after the concrete is laid). | |||||
| 6Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings,column pedestals,plinth beams, grade beams,staircase steps,Sill slabs etc which require only nominal strutting using mild steel sheets of size 90x60cm and 10BG stiffened with welded mild steel angles of size 25x25x3 mm for boarding,laid with silver oak joists of size 10x5cm & 7.5x5cm as support runner, vertical stiffener,side support and Top Horizontal stiffener spaced at about 60 to 90cm centre to centre or at suitable intervals etc complete in all floors complying with standard specifcation.(Payment for centering shall be given after the concrete is laid). | |||||
| 7Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) a) Below Plinth /Basement level | |||||
| 8Cement Concrete 1:1-1/2:3 (One Cement,One and a half crushed stone sand and Three hard brocken stone jelly) using 20mm gauge hard brocken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser,mixing charges for machine mix,laying,vibrating with mechanical vibrators,finishing,curing,etc and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary and bearing surfaces of walls,beams etc shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra,etc complete complying with standard specification and as directed by the departmental officers - machine mix | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
450cond1.pdf
Tender Documents • 0.18 MB
BOQ_811555.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .