Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
14 Jul 2026, 5:00 pm6d left
Circle Officer
RURAL WORKS CIRCLE, SUNDARGARH
Construction of Day care PHC building at Kundukela of Sadar block XV FC for the year 2024 25
2026_CERWI_134213_1
RWCCESNG-12 of 2026-27
National Competitive Bid
Civil Works - Buildings
365 days
Sundergarh
3 documents required · 3 mandatory
₹10,000
₹1.2 L
Yes
3 Jul 2026
3 Jul 2026
15 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
3 Jul 2026 - 13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick or stone masonary in cement mortar upto 3.00m height including all costs complete. Stacking the useful materials for reuse and removing the debris 50 mtr lead as per the direction of Engineer-in-charge. | 35.36 | cum | 1,646.6 | ₹58,223.78 |
| 2 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed. initial leads and lifts as per the direction of Engineer-in-charge. | 240.95 | cum | 282.9 | ₹68,164.75 |
| 3 | Filling in foundation and plinth with excavated earth including watering and ramming as directed by the Engineer-in-charge. | 220.53 | cum | 157.2 | ₹34,667.32 |
| 4 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete as per the direction of Engineer-in-charge. | 274.77 | cum | 530.5 | ₹1,45,765.49 |
| 5 | Cement Concrete (1:3:6)using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T&P etc complete as per the direction of Engineer-in-charge. | 79.47 | cum | 6,332.3 | ₹5,03,227.88 |
| 6 | R.C.C. M-20 grade with 20mm and down grade C.B. chips including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but cost of reinforcement complete as per the direction of Engineer-in-charge. | 0.01 | cum | 0.01 | ₹0 |
| 7 | Ground Floor | 0.01 | cum | 0.01 | ₹0 |
| 8 | Column Base & Footing | 56.68 | cum | 6,809.7 | ₹3,85,973.8 |
| 9 | Plinth Beam (Grade Beam) | 17.09 | cum | 7,684 | ₹1,31,319.56 |
| 10 | Lintel | 7 | cum | 14,524.2 | ₹1,01,669.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.01 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_599407.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid