Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC | ₹5.9 L | 1 | Accepted-AOC first lowest |
| 2 | 2₹6.0 LRejected-AOC | ₹6.0 L | 2 | Rejected-AOC second lowest |
| 3 | 3₹6.8 LRejected-AOC | ₹6.8 L | 3 | Rejected-AOC third lowest |
Tender Value
₹6.3 L
EMD Value
₹15,900
Closing Date
22 May 2026, 5:00 pmClosed
Assistant Execuitive Engineer
Electrical Sub Division Venjaramoodu
HT Touching clearance under ES Kallara under AMC
2026_KSEB_850821_1
AEE/ESD-VJD/2026-27/01 DATED 14.05.2026
Open Tender
Miscellaneous Works
365 days
Kallara
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,493
₹15,900
10 Jun 2026
15 May 2026
25 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing touchings on HT lines 11kV, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote). PART 2 ( 2694.14*2)20%=1077.656/- | 16.7 | km | 1,077.66 | ₹17,996.92 |
| 2 | Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote). PART 3 (3232.55 *2)20%=1293.02/- | 83.95 | km | 1,293.02 | ₹1,08,549.03 |
| 3 | Clearing touchings on HT/LT lines, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified. (Rural/Remote).PART 4 (3232.55*2)20%=1293.02/- | 83.95 | km | 1,293.02 | ₹1,08,549.03 |
| 4 | Clearing touchings on HT lines 11kV, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote). PART 1 ( 2694.14*2)40%=2155.312/- | 16.7 | km | 2,155.31 | ₹35,993.68 |
| 5 | Clearing touchings on HT lines 11kV, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote).PART 3 ( 2694.14*2)20%=1077.656/- | 16.7 | km | 1,077.66 | ₹17,996.92 |
| 6 | Clearing touchings on HT lines 11kV, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote).PART 4 ( 2694.14*2)20%=1077.656/- | 16.7 | km | 1,077.66 | ₹17,996.92 |
| 7 | Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote).PART 1 (3232.55 *2)40%=2586.04/- | 83.95 | km | 2,586.04 | ₹2,17,098.06 |
| 8 | Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote).PART 2(3232.55 *2)20%=1293.02/- | 83.95 | km | 1,293.02 | ₹1,08,549.03 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 0.29 MB
Tendernotice_3.pdf
PDF • 0.95 MB
Tendernotice_4.pdf
PDF • 0.73 MB
BOQ_1437613.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid