Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹84.1 LAdmitted-Finance | -44.00% | ₹84.1 L | L1 | Admitted-Finance |
| 2 | L2₹87.1 L+₹3.0 L (3.59%)Admitted-Finance R O CHUCHOT LEH LADAKH UT | -41.99% | ₹87.1 L+₹3.0 L (3.59%) | L2 | Admitted-Finance |
| 3 | L3₹87.4 L+₹3.3 L (3.95%)Admitted-Finance | -41.79% | ₹87.4 L+₹3.3 L (3.95%) | L3 | Admitted-Finance |
| 4 | L4₹91.9 L+₹7.9 L (9.34%)Admitted-Finance | -38.77% | ₹91.9 L+₹7.9 L (9.34%) | L4 | Admitted-Finance |
| 5 | L5₹1.0 Cr+₹18.0 L (21.4%)Admitted-Finance | -32.00% | ₹1.0 Cr+₹18.0 L (21.4%) | L5 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
16 Jun 2026, 4:00 pmClosed
Xen RnB Division Kargil
Xen RnB Division Kargil
Construction of Multipurpose Community Hall at Tingdo.(Capex).
2026_PWD_19009_2
E tender 11 of 2026-27 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Buildings
Percentage
240 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,500
Xen RnB Division Kargil
₹3.0 L
2 Jul 2026
1 Jun 2026
17 Jun 2026
1 Jun 2026
16 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | In All kind of Soil 70% | 161.53 | CUM | 270.56 | ₹43,703.56 |
| 1.02 | Soft rock 20% | 46.15 | CUM | 490.82 | ₹22,651.34 |
| 1.03 | Hard rock 10% | 23.08 | CUM | 1,183.08 | ₹27,305.49 |
| 2 | STONE SOLLING Dumping of stone including cost of stone (in horizontal on level) | 14.49 | cum | 226.38 | ₹3,280.25 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 14.49 | CUM | 5,570.23 | ₹80,712.63 |
| 4Dumping/filling of earth/stone | |||||
| 5 | A ) Earth Filling 40% | 42.54 | CUM | 214.44 | ₹9,122.28 |
| 6 | B) Stone Filling 60% | 63.81 | CUM | 1,213.42 | ₹77,428.33 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 85.29 | CUM | 6,243.92 | ₹5,32,543.94 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_45353.xls
BOQ • 0.35 MB
CORRIGENDUMNIT11OF2026DATEEXTENSION.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .