Loading…
Loading…
Tender Value
₹6.0 L
EMD Value
₹12,080
Closing Date
9 Jul 2026, 6:00 pmDue tomorrow
EE PWD DIV. NAINWA
EE PWD DIV. NAINWA
C.C. in village Borda. Road construction work from Rajkiya Primary School towards Bairwa Basti Gr. Balapura Panchayat Samiti Nainwan
2026_CEPWD_572409_6
EE PWD DIV. NAINWA NITNO-08/2026-27
Open Tender
Civil Works
60 days
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DIV. NAINWA
₹12,080
Yes
2 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a fully automatic computerised batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 1 | P.Cum. | - | - |
| 2 | Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in fully automatic Computerised Batching Plant compatiable with Printer and Pen Drive and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 with all required equipments (Dowel Bars & Tie Bar will be paid seprately). | 1 | P.Cum. | - | - |
| 3 | Add GST (18%) on Total Costruction Cost | - | Total | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.98 MB
Tendernotice_2.pdf
PDF • 1.40 MB
Tendernotice_3.pdf
PDF • 11.56 MB
Tendernotice_4.pdf
PDF • 0.22 MB
BOQ_1018338.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid