Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC A 163 SEC 136 NOIDA 201301 UP | ₹3.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 Cr+₹1.1 Cr (28.9%)Rejected-Finance 403 4TH FLOOR PARK CENTRA NH 8 SECTOR 30 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | ₹4.9 Cr+₹1.1 Cr (28.9%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.9 Cr+₹6.0 Cr (158.4%)Rejected-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | ₹9.9 Cr+₹6.0 Cr (158.4%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Voyants Solutions Pvt Ltd | Design Associates Inc | RITES LIMITED |
|---|---|---|---|---|---|---|
| 1.00In response to the RFP, the Applicant shall provide financial quote in as a PERCENTAGE FEE for the complete period (excluding GST). GST as per applicable rates shall be paid by the Authority as extra. Rate calculated will be inclusive of all the expenses. | ||||||
| 1.01 | Request for Proposal (RFP) for Hiring of Design development and Project Management Consultants for Infrastructure development of EMC Sector 10, at YEIDA
Quotation as per requirements stated in Clause 3.3 of the RFP
i. The consultant is expected to quote a consultancy fees based on (%) percentage of the total project cost
ii. The consultancy fees quoted shall remained unchanged in case the project cost is equal or above Rs. 450.00 Crores. However, the fees shall be subject to a downward revision in case the project cost works out to be below Rs. 450.00 Crores.
Eg: In case the consultant quotes a fee of 1%, the fees as per project cost of Rs. 450.00 Crores or above shall translated to Rs. 4.50 Cr. However, in the case the project cost reduces to Rs. 400.00 Crores, the consultant fees shall be revised to Rs. 4.00 Cr.
iii. For the professional fee, the bidder shall quote a consultancy fees based on (%) percentage of the total project cost. The payment due to the Architect at different stages be computed on the following basis:
a. At Stages 1 to 4: On rough estimate of project cost.
b. At Stages 5: On approved project cost estimate.
c. At Stages 6 to 7: Accepted tender cost | 1 | Nos | 1.42 ₹1.42 | 1.1 ₹1.1 Lowest | 2.84 ₹2.84 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
28 Jul 2025, 5:00 pmClosed
GM PROJECT
1ST,FLOOR,COMERCIAL COMPLEX ,BLOCK P-2,SECTOR OMEGA -1,GREAER NOIDA
Request for Proposal (RFP) for Hiring of Design development and Project Management Consultants for Infrastructure development of EMC Sector 10, at YEIDA
2025_YEIDA_1056919_1
YEA/GM(PROJECT)/2025/377 DT-10/07/2025
Open Tender
Consultancy
Percentage
730 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
REFER TENDER DOC
5 documents required · 5 mandatory
₹11,800
₹2 L
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
1 Sept 2025
14 Jul 2025
30 Jul 2025
14 Jul 2025
28 Jul 2025
14 Jul 2025
14 Jul 2025 - 17 Jul 2025
18 Jul 2025
In response to the RFP, the Applicant shall provide financial quote in as a PERCENTAGE FEE for the complete period (excluding GST). GST as per applicable rates shall be paid by the Authority as extra. Rate calculated will be inclusive of all the expenses.
Request for Proposal (RFP) for Hiring of Design development and Project Management Consultants for Infrastructure development of EMC Sector 10, at YEIDA Quotation as per requirements stated in Clause 3.3 of the RFP i. The consultant is expected to quote a consultancy fees based on (%) percentage of the total project cost ii. The consultancy fees quoted shall remained unchanged in case the project cost is equal or above Rs. 450.00 Crores. However, the fees shall be subject to a downward revision in case the project cost works out to be below Rs. 450.00 Crores. Eg: In case the consultant quotes a fee of 1%, the fees as per project cost of Rs. 450.00 Crores or above shall translated to Rs. 4.50 Cr. However, in the case the project cost reduces to Rs. 400.00 Crores, the consultant fees shall be revised to Rs. 4.00 Cr. iii. For the professional fee, the bidder shall quote a consultancy fees based on (%) percentage of the total project cost. The payment due to the Architect at different stages be computed on the following basis: a. At Stages 1 to 4: On rough estimate of project cost. b. At Stages 5: On approved project cost estimate. c. At Stages 6 to 7: Accepted tender cost
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .