Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.7 LAccepted-AOC H NO 443 6 DEULWADA MARCELA GOA | NORTH GOA | GOA | 403508 | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹10.5 L+₹1.7 L (19.7%)Rejected-Finance 435 FLAT NO G 1 SUYASH APARTMENT JAYCEE NAGAR CURTI PONDA GOA | GOA | 2 | Rejected-Finance L2 Bidder | |
| 3 | 3₹11.0 L+₹2.3 L (26.0%)Rejected-Finance | 3 | Rejected-Finance L3 Bidder |
Tender Value
₹10.5 L
EMD Value
₹20,995
Closing Date
28 Jan 2025, 4:00 pmClosed
EE III
EE, WDIII, WRD, Ponda Goa
Improvement to existing retaining wall at Sapna Berrier CHS borda in Fatorda Constituency.
2025_WRD_19340_1
10/24-25/ACT/WDIII/WRD/s3
Open Tender
Mining
Item Rate
100 days
Ponda
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹20,995
2 Apr 2025
10 Jan 2025
29 Jan 2025
10 Jan 2025
28 Jan 2025
10 Jan 2025
Amount
Earth work in excavation in all type of strata comprising any of the materials such as soil, silt, sand, clay gravel, moorums of all varieties shingles.pebble all type of conglomerates, laterite rock, soft rock, disintegrated rock, fissured shattered, decomposed rock or weathered rock and all such other materials, as describe under appendix to those specifications either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiselling , wedging etc . excluding blasting in all conditions such as dry moist, saturated Submerged, foul conditions etc. including pumping or bailing out water, including setting out construction of shoring and bracing removal stumps and other deleterious matters, dressing of Side and bottoms and back filling the excavated earths to the extent required and disposing the remaining excavated soil/rock as directed by Engineer in charge for all leads and in all lifts as specified and directed etc.complete
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete.
b)vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level
b)In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level.
Providing and fixing weep holes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall and earth retaining structure complete as directed by the Engineer in charge A) 110 mm dia
Providing and laying laterite stone aggregate 40x40x40 cm to cover the weep holes on the road side of retaining wall to act as filter media.
M/S RANJANA CONSTRUCTIONS (BID ID -42765)
MUSHTAQ AHMED M. BULBULE (BID ID -43072)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .