| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 CrAccepted-AOC KANNUR | KERALA | 670001 | ₹12.2 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹12.7 CrRejected-AOC | ₹12.7 Cr | L2 | Rejected-AOC Second Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified |
Tender Value
₹11.7 Cr
EMD Value
₹5 L
Closing Date
16 May 2023, 3:00 pmClosed
Project Director, PMU-KRFB
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2023_KRFB_573992_1
PWD/KR/TR/1304/2022_5_1_1/1
Open Tender
Civil Works - Bridges
545 days
Wayanad
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
8 Feb 2024
28 Apr 2023
18 May 2023
28 Apr 2023
16 May 2023
28 Apr 2023
Amount
Appendix A-Bridge proper
OD110122/2021-2022:RING BUND Type-I-Putting up ring bund as per approved shape 3.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 3.00m including labour dismantling the bund after completion of the work etc. complete.(60.1.1) Pier P1,P2 2 36.000 72.0 For river protection 1 70.000 70.0 1 60.000 60.0 Total Quantity 202.0 metre Total Deducted Quantity 0.0 metre Net Total Quantity 202.0 metre Bailing out water during excavation of foundation for abutments , wings ,piers, etc. using 10HP engine and pump sets including cost of fuel , hire charges of machineries, conveying charges of machineries, labour charges , and other incidental charge
OD110123/2021-2022: Forming temporary island of the size 8.00x8.00x3.00 meter with 0.6 m above water level and driving down full size coconut piles 1.50m below bed level at 75c/c on both side and braced with 4 nos of 1/2 th split coconut wailing pieces and 4 nos of arecanut around and tied with wire nails and coir yarn with ettamat fixed to bamboo frame using with bamboo reapers with 30cm c/c on both ways and filling the island portion with gravelly earth including all cost conveyance labour etc. And periodical maintanence till the completion of work and removing island after completion of the work etc. as per the direction of department
12.9.C:Providing and constructing one span service road to reach island location from one pier location to another pier location
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.1.4.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Hard Rock ( blasting prohibited) - Mechanical Means
OD110124/2021-2022: Providing MS dowel bars of 25mm bars drilling holes into the rock and placing 25mm plain bars 1m into the holes and 1.5m into the concrete. Including all cost, conveyance & labour charges etc. complete
12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
OD110125/2021-2022:Providing MS circular liner using 6mm thick MS sheet for outer casing for 1000 mm internal dia broad cast in situ piles including cost of MS sheet, conveyance, all labour charges for cutting, bending to the required shape, welding fabricating and placed in position after applying one coat iron primer and driving down the wlded circular tube stage by stage to the required depth including driving plant and all other equipments required for proper completion of the work etc; complete with standard specification as per direction of departmental officers at site
12.24.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm
12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap
12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
13.5.H.q.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - Using concrete Mixer - Height 5m to 10m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.1D.2.2.C:"Furnishing and Placing RCC/PSC Grade M35 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For T-beam & slab - Height 5m to 10m
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
14.1A.2:Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specification
14.9:Drainage Spouts complete as per drawing and Technical specification
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
5.15:Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen (VG - 30) meeting the requirements given in table 500-40, prepared by using a mastic cooker and laid to the required level and slope after cleaning the surface, including providing an antiskid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into the surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516
OD111258/2021-2022:Providing weep holes of 110mm dia PVC pipe for concrete retaining wall including all cost and conveyance of all materials and all labour charges etc complete complained to standard specification and direction of departmental officers at site
Appendix B SIDE PROTECTION WORKS
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm
2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm
2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm
OD110126/2021-2022::Coconut pile- Supplying and stacking well matured straight cocanut post for driving down through various strata below bed level including cost conveyance labour charges etc. complete (Avg. 25 cm dia cocunut post of 7.5 m)
OD110127/2021-2022: Coconut pile- Driving down coconut pile to lines and levels through various strata includingrall hire charges and labour for fixing staging platform and all other applainces neccessary for pile driving down after pointing the bottom end (7.50 m length)
OD110128/2021-2022:Cutting and removing excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150 m
OD110129/2021-2022: Dry rubble masonry using granite boulders including cost and conveyance of all materials all labour charges etc . complete
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
14.1D.2:Furnishing and Placing RCC/PSC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specification
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
OD110130/2021-2022: Providing and constructing gabian structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 mm x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be securely tied with 4 mm galvanised steel wire
OD110131/2021-2022:Supplying and laying of polyester needle punched non woven geotextile as filter media behind Gabion/ gabion fascia units, as per MORTH 700 type - III geotextile. The width of geotextile roll shall not be less than 4.5m, at easily accessible location including top and bottom, with all leads and lifts, manpower and machinery, materials, labour etc. complete and as directed by Engineer in charge
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
Appendix C - ROAD FORMATION
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
2.6:Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
3.18:Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
14.10:PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
14.11:Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.4.2a:Dense Graded Bituminous Macadam:- For Grading II (26.5 mm nominal size) Providing and laying dense graded bituminous macadam with 80-100 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder (VG 30) @ 4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
8.1.A:Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
Appendix D - CONSTRUCTION OF CULVERT
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
OD56497/2022-2023:Coconut pile- Supplying and stacking well matured straight cocanut post for driving down through various strata below bed level including cost conveyance labour charges etc. complete (Avg. 25 cm dia cocunut post of 7.5 m)
OD56501/2022-2023: Coconut pile- Driving down coconut pile to lines and levels through various strata includingrall hire charges and labour for fixing staging platform and all other applainces neccessary for pile driving down after pointing the bottom end (7.50 m length)
OD56503/2022-2023:Cutting and removing excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150 m
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
13.5.B:Plain/Reinforced Cement Concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M20 - Height upto 5m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
Appendix E - CONSTRUCTION OF DRAIN
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.2.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
Appendix -F Road safety features
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.4.1:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 90 cm equilateral triangle
8.4.3:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 60 cm circular
8.4.4:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 80 mm x 60 mm rectangular
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
55.10.1:Providing and erecting retro-reflectorised Object Hazard Marker 300mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801.300 mm x 900 mm
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
55.16:Providing and fixing guard post Providing and fixing guard post of size 200mmx200mm, 1400mm long, 800mm above ground level and 600mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 100mm c/c, firmly fixed in position by means of foundation of size 0.5mx0.5mx0.7m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint in alternate white & black band 20cm wide
OD111719/2021-2022:Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street lighting, 9 m high spaced 40 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on the footpath, fitted with sodium vapour lamp and fixed firmly in concrete foundation. For Fixing in Median
55.38:Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on Structural Steel c section vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of structural steel c section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.3.
OD57276/2022-2023:Providing and laying factory made coloured chamfered edge Cement Concrete paver blocks 25 mm thick , of required strength, size/shape, made by table vibratory method using PU mould, laid in required colour & pattern in cement mortar 1:3 complete as per manufacturers specifications & direction of Engineer-in-Charge
PAULOSE GEORGE CONSTRUCTION COMPANY PVT LTD
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
PAULOSE GEORGE CONSTRUCTION COMPANY PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid