| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.2 LAccepted-AOC KALAYIL PUTHUPARAMBIL HOUSE THACHAMBARA P O PALAKKAD 678593 | PALAKKAD | PALAKKAD | KERALA | 678593 | ₹16.2 L | 1 | Accepted-AOC L1 bidder |
| 2 | 2₹16.6 L+₹42,542.12 (2.63%)Rejected-AOC ARAKKAL HOUSE BEYPORE S O BEYPORE POST 673015 | BEYPORE | KOZHIKODE | KERALA | 673015 | ₹16.6 L+₹42,542.12 (2.63%) | 2 | Rejected-AOC L2 bidder |
| 3 | 3₹16.9 L+₹74,248.82 (4.59%)Rejected-AOC | ₹16.9 L+₹74,248.82 (4.59%) | 3 | Rejected-AOC L3 bidder |
| Sl No | Description | Qty | Unit | ALI ASHRAF L3 | PEETHAMBARAN L2 | JOBIN JOSEPH L1 |
|---|---|---|---|---|---|---|
| 1.00PAINTING of REGULATOR SHUTTERS and HOISTING BRIDGE , SUPPLY and FABRICATION of LADDER on SHUTTER and REPLACING of DAMAGED RUBBER SEALS | ||||||
| 1.00 | OD42978/2025-2026:Providing with Temporary Platform (Suspended type) of size 6m X 2.5m, with scaffolding pipe suspension from overhead structure, for the repair works/painting of shutters, hoisting bridges, etc. including the cost of bracing, fittings, handling charges, assembling, dismantling and all safety arrangements complete. | 6 | set | 1,744 ₹10,464 | 1,709.2 ₹10,255.2 | 1,665.42 ₹9,992.52 Lowest |
| 1.00 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 1,873 | sqm | 473 ₹8,85,929.47 | 463.59 ₹8,68,304.53 | 451.71 ₹8,46,053.28 Lowest |
| 1.00 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 1,611.82 | sqm | 231 ₹3,72,329.73 | 227.23 ₹3,66,253.18 | 221.41 ₹3,56,872.4 Lowest |
| 1.00 | OD42976/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges(#) | 49.5 | kg | 87 ₹4,306.5 | 85.86 ₹4,250.07 | 83.65 ₹4,140.68 Lowest |
| 1.00 | OD42971/2025-2026:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges.(#) | 116.4 | kg | 80 ₹9,312 | 78.73 ₹9,164.17 | 76.71 ₹8,929.04 Lowest |
| 1.01 | OD48315/2025-2026:Supply of MS round bar including cost of conveyance charges. (#) | 0.89 | kg | 77 ₹68.53 | 75.56 ₹67.25 | 73.62 ₹65.52 Lowest |
| 1.01 | OD42972/2025-2026:Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge /Platform and accessories etc. for the same as per approved specifications, drawings and directions of deptl fficer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied | 166.79 | kg | 58 ₹9,673.82 | 57.4 ₹9,573.75 | 55.92 ₹9,326.9 Lowest |
| 1.01 | OD42979/2025-2026:Chipping , cutting and removing the bolt and nuts, dismantling, taking out and stacking the old rubber seals from the gates without damaging the gate components including cost of all labour, tools and accessories conveyance charges etc. complete. | 84.8 | metre | 606 ₹51,388.8 | 594.31 ₹50,397.49 | 579.08 ₹49,105.98 Lowest |
| 1.01 | 85.116:Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing | 48 | metre | 2,315 ₹1,11,120 | 2,269.22 ₹1,08,922.56 | 2,211.09 ₹1,06,132.32 Lowest |
Tender Value
₹16.9 L
EMD Value
₹42,355
Closing Date
8 Jun 2026, 5:00 pmClosed
Jishakumar C B
Executive Engineer, Irrigation-Mechanical Division, Malampuzha
GENERAL- Bakkikayam Regulator- Painting of 6 nos of Regulator shutters and maintenance of Bakkikayam Regulator- General Mechanical
2026_Irrig_853033_1
IRR/MH/TR/577/2026_16_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
Malappuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,355
Yes
27 Jul 2026
29 May 2026
10 Jun 2026
29 May 2026
8 Jun 2026
29 May 2026
29 May 2026 - 8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PAINTING of REGULATOR SHUTTERS and HOISTING BRIDGE , SUPPLY and FABRICATION of LADDER on SHUTTER and REPLACING of DAMAGED RUBBER SEALS | |||||
| 1.001 | OD42978/2025-2026:Providing with Temporary Platform (Suspended type) of size 6m X 2.5m, with scaffolding pipe suspension from overhead structure, for the repair works/painting of shutters, hoisting bridges, etc. including the cost of bracing, fittings, handling charges, assembling, dismantling and all safety arrangements complete. | - | set | - | - |
| 1.002 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 0.4 | sqm | - | - |
| 1.003 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 0.8 | sqm | - | - |
| 1.004 | OD42976/2025-2026:Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges(#) | - | kg | - | - |
| 1.005 | OD42971/2025-2026:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges.(#) | - | kg | - | - |
| 1.006 | OD48315/2025-2026:Supply of MS round bar including cost of conveyance charges. (#) | - | kg | - | - |
| 1.007 | OD42972/2025-2026:Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge /Platform and accessories etc. for the same as per approved specifications, drawings and directions of deptl fficer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied | 1 | kg | - | - |
| 1.008 | OD42979/2025-2026:Chipping , cutting and removing the bolt and nuts, dismantling, taking out and stacking the old rubber seals from the gates without damaging the gate components including cost of all labour, tools and accessories conveyance charges etc. complete. | 1 | metre | - | - |
| 1.009 | 85.116:Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
BOQ_1442090.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 1.64 MB
Date_Corrigendum1.pdf
PDF • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .