Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance | -1.10% | ₹3.6 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 LAdmitted-Finance | -0.40% | ₹3.6 L | L2 | Admitted-Finance |
| 3 | L3₹3.6 LAdmitted-Finance | -0.12% | ₹3.6 L | L3 | Admitted-Finance |
Updated dates
Tender Value
Refer Docs
EMD Value
₹7,300
Closing Date
31 Dec 2025, 2:00 pmClosed
ama
office of zila panchayat pilibhit
mundela kalan me shamshan shed nirman karya
2025_UPPRD_1100148_106
1365 date 12.12.2025 tender 207
Open Tender
Civil Works
90 days
work
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
rtgs to 98440100004603 ifs code barb0extpil
₹7,300
14 Jan 2026
20 Dec 2025
31 Dec 2025
20 Dec 2025
31 Dec 2025
20 Dec 2025
excavation in foundation on ordainary soil lift up to 1.5m and lead up to 30 m all complete with out
concrete with 4 cm gauge brick ballast fine sand and cement in proportion of 1:4:8 in foundation including
150 Class brick work in 1:8 cement mortar in foundation and pliith duding supply of all matersak, laliour and TAP etc. required for proper completion of the wink
M-150 Class brick work in 1:4 cement mortar in super structure for wall of one brick wall including supply of all materials, labour and T&P etc. required for proper completion of the work IS.L.no.305+309-310)
R.CC work with 1:1.5.3 cement.coarse sand and 20 mm stone grit in lintal and sunshade including supply of all materials, labour and T&P etc. requined for proper completion of the work (Si.no.283 a)
RCC work with 1:1.5:3 cement.coarse sand and 20 mm stone grit in Slab including supply of all materials, labour and TBP etc. required for proper completion of the work (5.1.no.284 a)
MS or iron work in plane work as R.C.C including cutting binding etc. all complete (S.i.no. 504)
12 mm thick cement plaster in cement mortar in 1:4 over brick work including supply of all materials, labour and T&P etc. required for proper completion of the work (5.1.no.5841)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable
Earth filling in ordinry soil including ramming and dressing the surface to required level & slopes etc. and also i/c cartage 2 km without royalty. (5.3.no.253)
Finishing of wall with water proofing cement paint of required shade aver new brick work i/c base coat of white cement including supply of all materials, labour and T&P etc. required for proper completion of the work Sion 660-661
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Laying B.O.E soling with 5.0.8 bricks including supply of all materials, labour and T&P etc. required for proper completion of the work (5.1.no.762 b)
S/Fixing of Ingraution atone Size 3’*2’ including writing with required pedestal & Photo graphs
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.31 MB
BOQ_2027048.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid